---
title: "Renewal of 220kV power line Weißenbach–Hessenberg"
url: "https://pelenoir.com/en/tenders-of-europe/projects/renewal-of-220kv-power-line-weissenbachhessenberg-16726/"
id: 16726
country: "Austria"
region: "Steiermark"
client: "Austrian Power Grid AG"
type: "Service contract"
procedure: "Negotiated procedure with prior publication of a call for competition (Verhandlungsverfahren mit vorheriger Bekanntmachung)"
deadline: "2026-11-16"
status: "closed"
days_left: -13
status_as_of: "2026-11-29"
disciplines: ["Engineering","Specialist consulting"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=fde58043-87ff-44b0-b6b0-3d089adfba4c-FN177696v_17_20261030043015"
updated: "2026-10-30"
publisher: "Pelenoir – Tenders of Europe"
---

# Renewal of 220kV power line Weißenbach–Hessenberg

> General renewal of a 220kV overhead power line between Weißenbach and Hessenberg substations, including ecological [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) according to RVS 04.05.11 standards

**Status (2026-11-29):** Closed 13 days ago — deadline 2026-11-16  
**Location:** Steiermark, Austria  
**Contracting authority:** Austrian Power Grid AG  
**Opportunity type:** Service contract — Negotiated procedure with prior publication of a call for competition (Verhandlungsverfahren mit vorheriger Bekanntmachung)  
**CPV:** 90700000  

## About the project

General renewal of a 220kV overhead power line between Weißenbach and Hessenberg substations, including ecological construction supervision according to RVS 04.05.11 standards

## Scope of work

Ecological construction supervision for the renewal of a 220kV power line between Weißenbach and Hessenberg substations, including environmental monitoring and compliance with RVS 04.05.11 standards

### Deliverables

- Ecological construction supervision services

### Required services

- Environmental monitoring during construction
- Compliance with RVS 04.05.11 standards

## Pelenoir assessment

This project primarily involves the renewal of a 220kV power transmission line, which is classified under engineering and technical planning for electrical infrastructure. A secondary but critical component is ecological construction supervision, ensuring environmental compliance and monitoring during construction, which falls under specialist consulting.

## How to take part

### Who can apply

- Eligibility criteria specified in tender documents

### What to submit

- Participation applications in German
- Electronic submission required
- Advanced or qualified electronic signature required

## Tender documents

The visible document package includes a web link labeled 'Details finden Sie hier,' which likely directs to the tender documents. These documents probably contain the full procurement conditions, submission forms, and technical specifications for the ecological construction supervision. The exact content of the files cannot be confirmed without access, as login is required. No specific file types or sizes are declared in the visible context.

## Disciplines

- **Engineering** (primary, 70%): Technical planning and engineering supervision for the renewal of the 220kV overhead power line, including compliance with electrical infrastructure standards and coordination of construction activities.
- **Specialist consulting** (secondary, 30%): Ecological construction supervision, environmental monitoring, and compliance with RVS 04.05.11 standards during the power line renewal.

## Related projects

- [S8 Marchfeld Expressway West Section Air and Climate Planning](https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-air-and-climate-planning-16569/) — Gänserndorf, Austria · Service contract · deadline 2026-12-03 (4 days left to apply)
- [Railway Steel Bridge Acoustic Emission Monitoring System](https://pelenoir.com/en/tenders-of-europe/projects/railway-steel-bridge-acoustic-emission-monitoring-system-1630/) — Austria · Service contract · deadline 2100-01-01 (26 696 days left to apply)
- [Railway traffic impact study for selective two-track expansion](https://pelenoir.com/en/tenders-of-europe/projects/railway-traffic-impact-study-for-selective-two-track-expansion-20278/) — Stockerau, Austria · Service contract · deadline 2026-12-04 (5 days left to apply)
- [Motorway expansion: full upgrade of A5 Nord/Weinviertel from Poysbrunn to national border](https://pelenoir.com/en/tenders-of-europe/projects/motorway-expansion-full-upgrade-of-a5-nord-weinviertel-from-poysbrunn-19306/) — Austria · Service contract · deadline 2026-12-14 (15 days left to apply)
- [Military social club: structural redesign and extension for Biathlon World Championship 2028](https://pelenoir.com/en/tenders-of-europe/projects/military-social-club-structural-redesign-and-extension-for-biathlon-19293/) — Hochfilzen, Austria · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [ASFINAG Bridge Inspections 2027 – Part 01](https://pelenoir.com/en/tenders-of-europe/projects/asfinag-bridge-inspections-2027-part-01-18048/) — Austria · Service contract · deadline 2026-11-30 (closes tomorrow)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=fde58043-87ff-44b0-b6b0-3d089adfba4c-FN177696v_17_20261030043015  
Original title: Generalerneuerung 220kV-Leitung UW Weißenbach - UW Hessenberg ("Liezen-Leoben-Leitung") - Umweltbauaufsicht

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/renewal-of-220kv-power-line-weissenbachhessenberg-16726/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
