---
title: "Rebuilding of bridge JNI 31000346 in Stawiszyn with access road reconstruction"
url: "https://pelenoir.com/en/tenders-of-europe/projects/rebuilding-of-bridge-jni-31000346-in-stawiszyn-with-access-road-17292/"
id: 17292
country: "Poland"
city: "Stawiszyn"
region: "Mazowieckie"
client: "Powiatowy Zarząd Dróg Publicznych w Białobrzegach"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)"
deadline: "2026-11-12"
status: "closed"
days_left: -17
status_as_of: "2026-11-29"
disciplines: ["Engineering","Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df3997-45b4-c4e1-e2d6-6b000120d7d9"
updated: "2026-11-03"
publisher: "Pelenoir – Tenders of Europe"
---

# Rebuilding of bridge JNI 31000346 in Stawiszyn with access road reconstruction

> Preparation of design documentation for the rebuilding of [bridge](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) JNI 31000346 in Stawiszyn, including geometric and structural corrections to the bridge and its access roads on county road 1123W.

**Status (2026-11-29):** Closed 17 days ago — deadline 2026-11-12 13:00  
**Location:** Stawiszyn, Mazowieckie, Poland  
**Contracting authority:** Powiatowy Zarząd Dróg Publicznych w Białobrzegach  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)  
**CPV:** 71320000 Engineering design services  

## About the project

Preparation of design documentation for the rebuilding of bridge JNI 31000346 in Stawiszyn, including geometric and structural corrections to the bridge and its access roads on county road 1123W. The project involves replacing the existing bridge with a large-diameter culvert (engineering structure using corrugated pipes or prefabricated concrete elements), redesigning drainage within the road corridor, and developing a new traffic organization plan.

## Scope of work

Preparation of complete design documentation for the rebuilding of bridge JNI 31000346, including demolition of the existing bridge, construction of a large-diameter culvert, geometric and structural corrections to the road, drainage redesign, traffic organization plan, and all necessary permits, agreements, and cost estimates. The documentation must comply with Polish construction law and serve as the basis for [construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/).

### Deliverables

- design documentation for rebuilding the bridge and access roads
- demolition design for the existing bridge
- design for a large-diameter culvert (corrugated pipes or prefabricated concrete)
- geometric and structural corrections to the road on the bridge and access sections
- drainage design within the road corridor
- new traffic organization plan
- updated map for design purposes
- technical specifications for execution and acceptance of construction works
- bill of quantities
- investor's cost estimate
- water law permit documentation (if required)
- agreements with network administrators and road managers
- certificate of professional affiliation for project authors
- declaration of compliance with construction regulations by the designer

### Required services

- [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) services (bridge and road)
- geotechnical and geological studies (if required)
- preparation of water law permit documentation
- cost estimation and bill of quantities
- traffic organization planning

## Pelenoir assessment

The project primarily involves engineering and technical planning for the rebuilding of a bridge and its access roads, including structural, geometric, and drainage design. Secondary scope includes [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) tasks such as cost estimation, permit preparation, and coordination of agreements.

## How to take part

### Who can apply

- experience in designing at least two bridge, rebuilding, or renovation projects (minimum value 100,000 PLN) completed in the last three years
- design team must include a chief designer with bridge engineering qualifications and at least three years of professional experience
- consortium participation allowed with a designated representative

### What to submit

- offer prepared in Polish
- electronic submission via the procurement platform (platformazakupowa.pl)
- statement of non-exclusion and fulfillment of participation conditions (attachment 3a to SWZ)
- commitment from third parties to provide resources (if applicable, attachment 3b to SWZ)
- documents confirming the authority to represent the bidder
- list of services performed in the last three years (attachment 5 to SWZ)
- list of personnel assigned to the project with their qualifications and experience (attachment 6 to SWZ)

### Award criteria

- Price (60% weight)
- Experience of the chief designer (40% weight)

## Disciplines

- **Engineering** (primary, 80%): Structural and civil engineering design for the bridge replacement (large-diameter culvert), geometric and structural corrections to the road, drainage redesign, and technical specifications for construction execution.
- **Project and construction management** (secondary, 20%): Preparation of cost estimates, bills of quantities, permits, agreements with network administrators, and coordination of the design documentation to ensure compliance with Polish construction law and readiness for construction.

## Related projects

- [Fire safety upgrade and access control modernisation for a social security office](https://pelenoir.com/en/tenders-of-europe/projects/fire-safety-upgrade-and-access-control-modernisation-for-a-social-20416/) — Nowy Sącz, Poland · Service contract · deadline 2026-11-30 (closes tomorrow)
- [Road redesign and documentation: three local roads in Bełchatów municipality](https://pelenoir.com/en/tenders-of-europe/projects/road-redesign-and-documentation-three-local-roads-in-belchatow-19560/) — Bełchatów, Poland · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Urban road redesign: 1 km Warsaw Street rebuild with cycling and pedestrian paths](https://pelenoir.com/en/tenders-of-europe/projects/urban-road-redesign-1-km-warsaw-street-rebuild-with-cycling-and-19762/) — Gorzów Wielkopolski, Poland · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Pedestrian paths along regional road: five new segments with bus bays](https://pelenoir.com/en/tenders-of-europe/projects/pedestrian-paths-along-regional-road-five-new-segments-with-bus-bays-20669/) — Rymanów, Poland · Service contract · deadline 2026-12-08 (9 days left to apply)
- [Road design: full documentation for new street construction in Nowogard](https://pelenoir.com/en/tenders-of-europe/projects/road-design-full-documentation-for-new-street-construction-in-nowogard-20223/) — Nowogard, Poland · Service contract · deadline 2026-12-10 (11 days left to apply)
- [Drainage design: linear system to protect two existing buildings below foundation level](https://pelenoir.com/en/tenders-of-europe/projects/drainage-design-linear-system-to-protect-two-existing-buildings-below-19559/) — Warsaw, Poland · Service contract · deadline 2026-11-25 (closed 4 days ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df3997-45b4-c4e1-e2d6-6b000120d7d9  
Original title: Opracowanie dokumentacji projektowej dla zad. pn. Przebudowa mostu nr JNI 31000346 w miejscowości Stawiszyn wraz z przebudową dojazdów do obiektu na drodze powiatowej nr 1123W Stawiszyn – Chruściechów

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/rebuilding-of-bridge-jni-31000346-in-stawiszyn-with-access-road-17292/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
