---
title: "Rebuild of Powiat Road 1072R Podolszynka Ordynacka – Lipiny"
url: "https://pelenoir.com/en/tenders-of-europe/projects/rebuild-of-powiat-road-1072r-podolszynka-ordynacka-lipiny-14725/"
id: 14725
country: "Poland"
city: "Nisko"
region: "Podkarpackie"
client: "Powiat Niżański"
type: "Service contract"
procedure: "basic procedure (tryb podstawowy)"
deadline: "2026-10-22"
status: "closed"
days_left: -38
status_as_of: "2026-11-29"
disciplines: ["Engineering","Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df29d9-707f-a158-5997-b20001ccc4e8"
updated: "2026-10-14"
publisher: "Pelenoir – Tenders of Europe"
---

# Rebuild of Powiat Road 1072R Podolszynka Ordynacka – Lipiny

> Preparation of design documentation for the rebuild of a 2.8 km section of Powiat Road 1072R, including new pavement layers, pedestrian and cycling paths, rainwater drainage, bus bays, roundabout, and utility infrastructure adjustments.

**Status (2026-11-29):** Closed 38 days ago — deadline 2026-10-22 11:00  
**Location:** Nisko, Podkarpackie, Poland  
**Contracting authority:** Powiat Niżański  
**Opportunity type:** Service contract — basic procedure (tryb podstawowy)  
**CPV:** 71320000 Engineering design services; 71242000 Project and design preparation, estimation of costs; 71248000 Supervision of project and documentation  

## About the project

Preparation of design documentation for the rebuild of a 2.8 km section of Powiat Road 1072R, including new pavement layers, pedestrian and cycling paths, rainwater drainage, bus bays, roundabout, and utility infrastructure adjustments. The project also requires obtaining necessary environmental and water permits and approval from the Powiat Roads Board in Nisko.

## Scope of work

Preparation of comprehensive design documentation for the rebuild of Powiat Road 1072R, including new pavement layers, pedestrian and cycling paths, rainwater drainage, bus bays, roundabout, and utility infrastructure adjustments. The project requires obtaining environmental and water permits, approval from the Powiat Roads Board, and compliance with accessibility standards for disabled persons.

### Deliverables

- Design documentation for road rebuild
- New pavement layers for the road
- Pedestrian and cycling paths
- Rainwater drainage system
- Bus bays or platforms (if applicable)
- Roundabout at intersection with Road 1069R and municipal roads
- Adjustments to telecommunication and electrical infrastructure (if necessary)
- Traffic organization project
- Environmental and water permits (if necessary)
- Project concept approval from the Powiat Roads Board in Nisko

### Required services

- [Engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) services
- Project preparation and cost estimation
- Project and documentation supervision
- Traffic organization planning
- Environmental and water permit acquisition
- Utility infrastructure adjustments

## Pelenoir assessment

This project is primarily focused on the technical planning and engineering design of a road infrastructure rebuild, including structural, civil, and utility adjustments. A secondary component involves [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) and documentation supervision to ensure compliance with regulatory and approval requirements.

## How to take part

### Who can apply

- Open to all contractors (no exclusive eligibility under Art. 94 of the Public Procurement Law)
- Contractors must employ administrative staff under an employment contract for the duration of the project (unless the contractor or subcontractor personally performs the tasks)

### What to submit

- Electronic offer form generated and filled in via the e-Zamówienia platform
- Statement on the absence of grounds for exclusion (Attachment No. 2)
- For joint bidders: individual statements on the absence of grounds for exclusion from each contractor (Attachment No. 2)
- For joint bidders: joint statement under Art. 117(4) of the Public Procurement Law (Attachment No. 4)
- For joint bidders: power of attorney for representation (if applicable)
- Power of attorney or document confirming authorization to represent the contractor (if applicable)

### Award criteria

- Price (60% weight)
- Payment term (40% weight)

## Tender documents

The visible document package includes four files: a draft contract (Projekt umowy.pdf), tender specifications (SWZ.pdf), a statement form for exclusion grounds (Załącznik nr 2 - Oświadczenie o braku podstaw wykluczenia.doc), and a joint declaration form for contractors bidding together (Załącznik nr 4 Oświadczenie Wykonawców wspólnie.docx). The draft contract likely contains standard terms and conditions for the design services agreement. The SWZ (Specyfikacja Warunków Zamówienia) probably details the technical requirements, scope of work, submission guidelines, and evaluation criteria. The statement forms are likely templates for contractors to declare their eligibility and compliance with procurement regulations. The exact content of these files cannot be confirmed without access, but their titles and context suggest they cover contractual, procedural, and eligibility aspects of the tender.

## Disciplines

- **Engineering** (primary, 90%): Design of road infrastructure, including pavement layers, rainwater drainage, bus bays, roundabout, utility adjustments, and traffic organization. Preparation of technical documentation for civil engineering works and coordination of environmental and water permits.
- **Project and construction management** (secondary, 10%): Supervision of project documentation, coordination of approvals from the Powiat Roads Board, and oversight of compliance with environmental and water permit requirements.

## Related projects

- [Stormwater and meltwater management plan for Półwieś canal catchment](https://pelenoir.com/en/tenders-of-europe/projects/stormwater-and-meltwater-management-plan-for-polwies-canal-catchment-19973/) — Opole, Poland · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Urban road redesign: 1 km Warsaw Street rebuild with cycling and pedestrian paths](https://pelenoir.com/en/tenders-of-europe/projects/urban-road-redesign-1-km-warsaw-street-rebuild-with-cycling-and-19762/) — Gorzów Wielkopolski, Poland · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Power upgrade for university supercomputing centre: modernising electrical supply in existing campus building](https://pelenoir.com/en/tenders-of-europe/projects/power-upgrade-for-university-supercomputing-centre-modernising-19563/) — Wrocław, Poland · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Gas installation design: retrofit or replacement in up to 170 municipal flats](https://pelenoir.com/en/tenders-of-europe/projects/gas-installation-design-retrofit-or-replacement-in-up-to-170-20675/) — Kraków, Poland · Service contract · deadline 2026-12-02 (3 days left to apply)
- [Rural road extension: 400m link to local school](https://pelenoir.com/en/tenders-of-europe/projects/rural-road-extension-400m-link-to-local-school-19953/) — Podstolice, Poland · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Cycle path design: expansion of regional road to connect Zalesie village](https://pelenoir.com/en/tenders-of-europe/projects/cycle-path-design-expansion-of-regional-road-to-connect-zalesie-20254/) — Zalesie, Poland · Service contract · deadline 2026-11-30 (closes tomorrow)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df29d9-707f-a158-5997-b20001ccc4e8  
Original title: Przebudowa drogi powiatowej Nr 1072R Podolszynka Ordynacka – Lipiny – opracowanie dokumentacji

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/rebuild-of-powiat-road-1072r-podolszynka-ordynacka-lipiny-14725/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
