---
title: "Rebuild of internal road no. 99 in Pawlikowice"
url: "https://pelenoir.com/en/tenders-of-europe/projects/rebuild-of-internal-road-no-99-in-pawlikowice-15491/"
id: 15491
country: "Poland"
city: "Pawlikowice"
region: "Małopolskie"
client: "the contracting authority's contact"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)"
deadline: "2026-10-30"
status: "closed"
days_left: -30
status_as_of: "2026-11-29"
value: "PLN 108 943 (≈ EUR 24 427)"
disciplines: ["Engineering","Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df2f3e-edf6-eeba-701a-d0000164a943"
updated: "2026-10-21"
publisher: "Pelenoir – Tenders of Europe"
---

# Rebuild of internal road no. 99 in Pawlikowice

> Pawlikowice’s next connection begins with design documentation and funding support.

**Status (2026-11-29):** Closed 30 days ago — deadline 2026-10-30 11:00  
**Location:** Pawlikowice, Małopolskie, Poland  
**Contracting authority:** the contracting authority's contact  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)  
**Declared value:** PLN 108 943 (≈ EUR 24 427)  
**CPV:** 71000000 Architectural, construction, engineering and inspection services; 71300000 Engineering services; 71200000 Architectural and related services  

## About the project

Preparation of design and cost documentation for the rebuild of an internal road in Pawlikowice, including necessary administrative approvals and support for potential external funding applications. The project also includes author supervision during the construction phase, expected to last up to 24 months.

## Why it matters

Rebuilding internal road no.  ̄ means the team’s questions start with the first crack. Every measurement is a step toward reconnecting Pawlikowice.

## Scope of work

Preparation of design and cost documentation for the rebuild of internal road no. 99 in Pawlikowice, including obtaining necessary administrative approvals (e.g., building permit or road investment permit). The scope includes support for external funding applications, responses to contractor queries, potential document modifications during the construction tender process, and author supervision during the construction phase (up to 24 months). The project must comply with accessibility standards for disabled persons and universal design principles.

### Deliverables

- design and cost documentation
- administrative approvals (e.g., building permit or road investment permit decision)
- materials for external funding applications (if applicable)
- responses to contractor queries during construction tender process
- document modifications during construction tender process (if required)
- author supervision during construction phase

### Required services

- architectural and [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) services
- cost estimation
- administrative approval support
- funding application support
- author supervision

## Pelenoir assessment

This project primarily involves engineering and technical planning for the rebuild of an internal road, including design, cost documentation, and compliance with road infrastructure standards. Secondary scope includes project and [construction management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) tasks such as author supervision and administrative support.

## How to take part

### Who can apply

- Experience in preparing design documentation for road construction, rebuild, or expansion of at least 300 meters, completed within the last three years and resulting in a building permit or road investment permit decision (ZRID).
- For consortia, at least one member must meet the experience requirement.

### What to submit

- Offer form (Załącznik nr 1 do SWZ) signed with qualified electronic signature, trusted signature, or personal signature.
- Statement on meeting participation conditions and absence of exclusion grounds (Załącznik nr 2 do SWZ).
- List of executed services (Załącznik nr 4 do SWZ) with references or documents confirming proper execution.
- Bid bond of 1,500 PLN (if not submitted in cash).
- Documents confirming the right to sign the offer (e.g., KRS excerpt, CEiDG, power of attorney).
- Statement on division of services among consortium members (Załącznik nr 6 do SWZ, if applicable).

### Award criteria

- Price (60% weight)
- Quality guarantee and warranty period for defects (40% weight)

## Disciplines

- **Engineering** (primary, 80%): Design and technical planning for the rebuild of internal road no. 99, including structural, civil, and infrastructure engineering, as well as compliance with road construction standards and accessibility requirements.
- **Project and construction management** (secondary, 20%): Author supervision during the construction phase (up to 24 months), support for administrative approvals, and coordination of funding applications.

## Related projects

- [Gas installation design: retrofit or replacement in up to 170 municipal flats](https://pelenoir.com/en/tenders-of-europe/projects/gas-installation-design-retrofit-or-replacement-in-up-to-170-20675/) — Kraków, Poland · Service contract · deadline 2026-12-02 (3 days left to apply)
- [Footpath design: two new pedestrian routes along a county road in Pogórska Wola](https://pelenoir.com/en/tenders-of-europe/projects/footpath-design-two-new-pedestrian-routes-along-a-county-road-in-20813/) — Skrzyszów, Poland · Service contract · deadline 2026-12-02 (3 days left to apply)
- [Pavement design for a new pedestrian walkway](https://pelenoir.com/en/tenders-of-europe/projects/pavement-design-for-a-new-pedestrian-walkway-20666/) — Przyjaźń, Poland · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Drinking water tanks: redesign of two municipal reservoirs](https://pelenoir.com/en/tenders-of-europe/projects/drinking-water-tanks-redesign-of-two-municipal-reservoirs-19760/) — Sopot, Poland · Service contract · deadline 2026-11-26 (closed 3 days ago)
- [Road design: full documentation for new street construction in Nowogard](https://pelenoir.com/en/tenders-of-europe/projects/road-design-full-documentation-for-new-street-construction-in-nowogard-20223/) — Nowogard, Poland · Service contract · deadline 2026-12-10 (11 days left to apply)
- [Sewer network expansion: 15 km of new pipelines for four villages](https://pelenoir.com/en/tenders-of-europe/projects/sewer-network-expansion-15-km-of-new-pipelines-for-four-villages-20235/) — Samborzec, Poland · Service contract · deadline 2026-11-30 (closes tomorrow)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df2f3e-edf6-eeba-701a-d0000164a943  
Original title: Opracowanie dokumentacji projektowo – kosztorysowej na „Przebudowę drogi wewnętrznej nr 99 w miejscowości Pawlikowice”

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/rebuild-of-internal-road-no-99-in-pawlikowice-15491/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
