---
title: "Rail station upgrade: Schiedam Centrum hub expansion and safety redesign"
url: "https://pelenoir.com/en/tenders-of-europe/projects/rail-station-upgrade-schiedam-centrum-hub-expansion-and-safety-20543/"
id: 20543
country: "Netherlands"
city: "Schiedam"
client: "ProRail B.V."
type: "Service contract"
procedure: "Restricted (non-open) procedure"
deadline: "2027-01-05"
status: "open"
days_left: 37
status_as_of: "2026-11-29"
disciplines: ["Architecture","Urban design and planning","Project and construction management"]
source: "TenderNed"
source_url: "https://www.tenderned.nl/aankondigingen/overzicht/450373"
updated: "2026-11-22"
publisher: "Pelenoir – Tenders of Europe"
---

# Rail station upgrade: Schiedam Centrum hub expansion and safety redesign

> A rail hub’s social safety redesign drafts circulation as its quiet framework.

**Status (2026-11-29):** 37 days left to apply — deadline 2027-01-05 10:00  
**Location:** Schiedam, Netherlands  
**Contracting authority:** ProRail B.V.  
**Opportunity type:** Service contract — Restricted (non-open) procedure  
**CPV:** 71200000 Architectural and related services  

## About the project

Adaptation of Schiedam Centrum [railway station](https://pelenoir.com/en/tenders-of-europe/typologies/rail-and-public-transport/) to accommodate expected passenger growth and improve social safety. The project includes [architectural services](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) for the Station & Transfer subproject, covering planning, study, tender support for the realization contract, and execution guidance during the construction phase.

## Why it matters

A rail station’s social safety redesign turns passenger circulation into a spatial rule, making flow the quiet framework for the entire hub.

> The brief for Schiedam Centrum railway station’s expansion explicitly links social safety to passenger circulation. The Station & Transfer subproject requires architectural services to plan, study, and guide execution with circulation as a core design principle.

This turns circulation from a functional requirement into a spatial rule for the entire hub. Every design decision. From platform layouts to wayfinding. Must prioritize how passengers move, wait, and interact. For architects, this means circulation isn’t just a byproduct of the design. It’s the first quiet framework shaping the station’s daily use.

## Scope of work

Architectural services for the Station & Transfer subproject of Schiedam Centrum railway hub, including planning and study phase, support for the realization contract tender, and execution guidance during the construction phase. The [framework agreement](https://pelenoir.com/en/tenders-of-europe/types/framework-agreements/) is for 5 years with options to extend by 4 and 3 years respectively.

### Deliverables

- Architectural vision and plan of approach
- Support for realization contract tender
- Execution guidance during construction phase

### Required services

- architectural design
- planning and study
- tender support
- construction phase guidance

## Pelenoir assessment

The Schiedam Centrum railway station upgrade project is primarily an architectural design initiative focused on expanding and redesigning the station to address passenger growth and social safety. The scope also includes [urban design](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) and planning elements to integrate the station into its urban context, as well as project and [construction management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) support for tendering and execution phases.

## How to take part

### Who can apply

- Selection criteria detailed in tender documents
- Minimum 2 and maximum 5 candidates invited to second phase
- Procedure involves successive phases with potential elimination of participants

### What to submit

- Electronic submission required
- Submission language: Dutch
- Plan of Approach and budget to be submitted on tender form

### Award criteria

- Best price-quality ratio (evaluation price calculated from bid sum and Plan of Approach)
- G2 Plan of Approach: Architectural vision (max 60% fictive discount on bid sum)
- G2 Plan of Approach: Vision on collaboration (max 20% fictive discount on bid sum)

## Tender documents

The visible files include two PDFs and two ZIP archives. The PDFs likely contain the official tender announcement and the original notice document, detailing procurement conditions, scope, and procedural requirements. The ZIP files are named 'Selectieleidraad Knoop Schiedam Centrum - architectendiensten' and 'Document package', suggesting they contain the selection guidance and supporting documents such as detailed plans, drawings, or contractual terms. The exact contents of the ZIP files cannot be confirmed without access, but their names indicate they likely include architectural briefs, site information, or evaluation criteria for the competition.

## Disciplines

- **Architecture** (primary, 70%): Architectural vision, design, and planning for the Schiedam Centrum railway station upgrade, including the Station & Transfer subproject, to accommodate passenger growth and improve social safety.
- **Urban design and planning** (secondary, 20%): Integration of the station upgrade into the broader urban context, including passenger flow optimization, public realm planning, and connectivity within the transport hub.
- **Project and construction management** (secondary, 10%): Support for the realization contract tender and execution guidance during the construction phase, ensuring alignment with architectural and urban design objectives.

## Related projects

- [Robbenoordplein CPO Development Process Guidance](https://pelenoir.com/en/tenders-of-europe/projects/robbenoordplein-cpo-development-process-guidance-14431/) — Rotterdam, Netherlands · Service contract · deadline 2026-12-04 (5 days left to apply)
- [Police Engineering and Advisory Services Framework](https://pelenoir.com/en/tenders-of-europe/projects/police-engineering-and-advisory-services-framework-8978/) — Netherlands · Service contract · deadline 2027-01-22 (54 days left to apply)
- [Sustainable Renovation Advisory Services for Le Pooleweg 6](https://pelenoir.com/en/tenders-of-europe/projects/sustainable-renovation-advisory-services-for-le-pooleweg-6-17431/) — Leiden, Netherlands · Service contract · deadline 2026-12-08 (9 days left to apply)
- [Gelatineverbinding movable bicycle bridge and infrastructure](https://pelenoir.com/en/tenders-of-europe/projects/gelatineverbinding-movable-bicycle-bridge-and-infrastructure-8937/) — Delft, Netherlands · Service contract · deadline 2026-12-18 (19 days left to apply)
- [Schiphol Wayfinding System Advisory Services](https://pelenoir.com/en/tenders-of-europe/projects/schiphol-wayfinding-system-advisory-services-17639/) — Schiphol, Netherlands · Service contract · deadline 2026-12-14 (15 days left to apply)
- [Heritage primary school: restoration and new extension in Rijnsburg](https://pelenoir.com/en/tenders-of-europe/projects/heritage-primary-school-restoration-and-new-extension-in-rijnsburg-20542/) — Katwijk, Netherlands · Service contract · deadline 2027-01-13 (45 days left to apply)

## Source

Original notice on TenderNed: https://www.tenderned.nl/aankondigingen/overzicht/450373  
Original title: Stations - Oude Lijn Knoop Schiedam Centrum - architectendiensten R-588030

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/rail-station-upgrade-schiedam-centrum-hub-expansion-and-safety-20543/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
