---
title: "Public swimming pool: construction and project management"
url: "https://pelenoir.com/en/tenders-of-europe/projects/public-swimming-pool-construction-and-project-management-19931/"
id: 19931
country: "Netherlands"
city: "Hoogeveen"
client: "Gemeente Hoogeveen"
type: "Service contract"
procedure: "Open procedure (openbaar)"
deadline: "2026-12-14"
status: "open"
days_left: 16
status_as_of: "2026-11-28"
value: "EUR 550 000"
disciplines: ["Project and construction management","Architecture"]
source: "TenderNed"
source_url: "https://www.tenderned.nl/aankondigingen/overzicht/449920"
updated: "2026-11-18"
publisher: "Pelenoir – Tenders of Europe"
---

# Public swimming pool: construction and project management

> Building a public [swimming pool](https://pelenoir.com/en/tenders-of-europe/typologies/sports-and-leisure/) in Hoogeveen? [Project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) turns coordination into the quiet backbone of daily use.

**Status (2026-11-28):** 16 days left to apply — deadline 2026-12-14 12:00  
**Location:** Hoogeveen, Netherlands  
**Contracting authority:** Gemeente Hoogeveen  
**Opportunity type:** Service contract — Open procedure (openbaar)  
**Declared value:** EUR 550 000  
**CPV:** 71541000 Construction project management services; 71540000 Construction management services  

## About the project

Construction and project management services for a new public swimming pool in Hoogeveen, including planning, coordination, and oversight of building activities.

## Why it matters

Project management for a new swimming pool in Hoogeveen turns coordination into the quiet backbone of daily use, where oversight shapes the rhythm.

## Scope of work

Construction and project management services for a new public swimming pool, including coordination of building activities, planning, and oversight. The contract covers the period from March 2027 to December 2029.

### Deliverables

- Project management and coordination of construction activities
- Submission of tenders in accordance with the tender documentation

### Required services

- Construction project management
- Coordination of building activities

## Pelenoir assessment

This project primarily involves project and construction management services for the development of a new public swimming pool, including coordination of building activities and oversight. While architectural and design elements are present in the documentation, they are secondary to the core project management scope.

## How to take part

### Who can apply

- Open to all economic operators under the European Public Procurement Directive (2014/24/EU)
- Uniform European Procurement Document (UEA) required for exclusion grounds

### What to submit

- Tenders must be submitted electronically via [TenderNed](https://pelenoir.com/en/tenders-of-europe/sources/tenderned/)
- Submission in Dutch language only
- Electronic invoicing required

### Award criteria

- Price (20% weight)
- Quality (80% weight)

## Tender documents

The visible document package includes the tender notice, procurement guidelines ('Aanbestedingsleidraad'), and a secured pricing sheet in Excel format. It also contains council documents such as proposals, decisions, and briefs related to the swimming pool design and approval process. Several PDFs appear to include design drawings, cost estimates, and project phasing documents, likely detailing the architectural and technical requirements for the new swimming pool. Additional files cover contractual conditions, reference declarations, and procurement forms. The exact content of the secured Excel file and some contractual documents remains unknown without access.

## Disciplines

- **Project and construction management** (primary, 80%): Project management, coordination, and oversight of the construction activities for the new public swimming pool, including planning, tender submission, and ensuring compliance with procurement guidelines.
- **Architecture** (secondary, 20%): Architectural and design oversight related to the swimming pool's construction, including review of design drawings, cost estimates, and project phasing documents to ensure alignment with project management objectives.

## Related projects

- [Curio West-Brabant building inspection and maintenance planning](https://pelenoir.com/en/tenders-of-europe/projects/curio-west-brabant-building-inspection-and-maintenance-planning-16338/) — Breda, Netherlands · Service contract · deadline 2026-12-07 (9 days left to apply)
- [Haags Montessori Lyceum Consolidation Project](https://pelenoir.com/en/tenders-of-europe/projects/haags-montessori-lyceum-consolidation-project-8912/) — The Hague, Netherlands · Service contract · deadline 2026-12-01 (3 days left to apply)
- [School construction: integrated building management for two new secondary schools](https://pelenoir.com/en/tenders-of-europe/projects/school-construction-integrated-building-management-for-two-new-19922/) — Franeker, Netherlands · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Facility planning and project management for municipal construction services in Helsinki](https://pelenoir.com/en/tenders-of-europe/projects/facility-planning-and-project-management-for-municipal-construction-19985/) — Helsinki, Finland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Primary school life-cycle project: construction management and supervision services](https://pelenoir.com/en/tenders-of-europe/projects/primary-school-life-cycle-project-construction-management-and-20242/) — Kirkkonummi, Finland · Service contract · deadline 2026-12-23 (25 days left to apply)
- [Port waiting quays modernisation: supervision of design and construction](https://pelenoir.com/en/tenders-of-europe/projects/port-waiting-quays-modernisation-supervision-of-design-and-19778/) — Medgidia, Romania · Service contract · deadline 2026-12-07 (9 days left to apply)

## Source

Original notice on TenderNed: https://www.tenderned.nl/aankondigingen/overzicht/449920  
Original title: Bouw- en projectmanagement zwembad Hoogeveen

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/public-swimming-pool-construction-and-project-management-19931/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
