---
title: "Property valuation and energy performance certification services for Tarnów Municipality (Part VII)"
url: "https://pelenoir.com/en/tenders-of-europe/projects/property-valuation-and-energy-performance-certification-services-for-13094/"
id: 13094
country: "Poland"
city: "Tarnów"
region: "Lesser Poland"
client: "Gmina Miasta Tarnowa - Urząd Miasta Tarnowa"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 ustawy)"
deadline: "2026-10-13"
status: "closed"
days_left: -46
status_as_of: "2026-11-28"
disciplines: ["Specialist consulting","Sustainability"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df22da-767e-cb66-647d-de00016940fd"
updated: "2026-10-05"
publisher: "Pelenoir – Tenders of Europe"
---

# Property valuation and energy performance certification services for Tarnów Municipality (Part VII)

> The project involves the preparation of 50 property valuation reports (operaty szacunkowe) and one energy performance certificate for various residential, commercial, and undeveloped properties owned by the Municipality of Tarnów or the State Treasury.

**Status (2026-11-28):** Closed 46 days ago — deadline 2026-10-13 10:00  
**Location:** Tarnów, Lesser Poland, Poland  
**Contracting authority:** Gmina Miasta Tarnowa - Urząd Miasta Tarnowa  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 ustawy)  
**CPV:** 71319000; 71326000 Ancillary building services  

## About the project

The project involves the preparation of 50 property valuation reports (operaty szacunkowe) and one energy performance certificate for various residential, commercial, and undeveloped properties owned by the Municipality of Tarnów or the State Treasury. The valuations are required for purposes such as property sales, establishing easements, updating perpetual usufruct fees, determining compensation for infrastructure projects, and asset contributions. The services include site inspections, photographic documentation, and potential updates to valuations within 12 months.

## Scope of work

The scope includes the preparation of 50 property valuation reports (operaty szacunkowe) and one energy performance certificate for properties located in Tarnów. The valuations cover residential units, undeveloped land, and easements for purposes such as sales, perpetual usufruct fee updates, compensation for infrastructure projects, and asset contributions. Services include site inspections, photographic documentation, and potential valuation updates within 12 months. The contractor must also participate in administrative proceedings if required.

### Deliverables

- 50 property valuation reports (operaty szacunkowe) in printed form, each with photographic documentation (minimum 2 photos, 9x13 cm)
- 1 energy performance certificate (Part 1 only)
- Site inspection protocols for each valuation
- Potential updates to valuations within 12 months if property values change

### Required services

- Property valuation services
- Energy performance certification (Part 1 only)
- Site inspections and photographic documentation
- Participation in administrative proceedings (e.g., Samorządowe Kolegium Odwoławcze)

## Pelenoir assessment

The project is primarily a specialist consulting engagement focused on property valuation services for municipal assets, with a secondary component related to energy performance certification. The scope does not involve [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/), engineering, construction, or other traditional AEC disciplines but instead centers on expert advisory and regulatory compliance services.

## How to take part

### Who can apply

- Contractors must employ or have access to a certified property valuer (rzeczoznawca majątkowy) with a minimum of 5 completed valuation reports
- For Part 1, contractors must also employ or have access to a certified energy performance assessor with a minimum of 3 completed certificates
- Consortium members may jointly meet eligibility requirements

### What to submit

- Offers must be submitted electronically via the procurement platform (the original notice
- Offers must include a qualified electronic signature or trusted signature
- Required documents: completed offer form, declarations of eligibility, power of attorney (if applicable), and commitments from subcontractors (if applicable)

### Award criteria

- Lowest price

## Disciplines

- **Specialist consulting** (primary, 70%): Preparation of 50 property valuation reports (operaty szacunkowe) for residential, commercial, and undeveloped properties, including site inspections, photographic documentation, and potential updates within 12 months. The focus is on delivering expert assessments for property sales, easements, perpetual usufruct fee updates, and compensation for infrastructure projects.
- **Sustainability** (secondary, 30%): Preparation of one energy performance certificate (świadectwo charakterystyki energetycznej) for a residential property, assessing its energy efficiency and compliance with regulatory standards.

## Related projects

- [Factory automation concept: intralogistics for door and furniture production](https://pelenoir.com/en/tenders-of-europe/projects/factory-automation-concept-intralogistics-for-door-and-furniture-19958/) — Rzeszów, Poland · Service contract · deadline 2026-11-26 (closed 2 days ago)
- [Heritage residential building retrofit: heating upgrade and accessibility adaptation](https://pelenoir.com/en/tenders-of-europe/projects/heritage-residential-building-retrofit-heating-upgrade-and-20806/) — Rybnik, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Technical and economic analysis for new biogas plant at GOŚ ŁAM](https://pelenoir.com/en/tenders-of-europe/projects/technical-and-economic-analysis-for-new-biogas-plant-at-gos-lam-13159/) — Łódź, Poland · Service contract · deadline 2026-10-16 (closed 43 days ago)
- [Boiler house conversion: multi-discipline design for a heritage building refurbishment](https://pelenoir.com/en/tenders-of-europe/projects/boiler-house-conversion-multi-discipline-design-for-a-heritage-19755/) — Szczawno-Zdrój, Poland · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Energy performance certificates for Wrocław University of Science and Technology buildings](https://pelenoir.com/en/tenders-of-europe/projects/energy-performance-certificates-for-wroclaw-university-of-science-and-18123/) — Wrocław, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Historical and material-technical research of the organ in Sint Catharinakerk](https://pelenoir.com/en/tenders-of-europe/projects/historical-and-material-technical-research-of-the-organ-in-sint-14253/) — Diest, Belgium · Service contract · deadline 2026-11-30 (2 days left to apply)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df22da-767e-cb66-647d-de00016940fd  
Original title: Wykonanie operatów szacunkowych oraz świadectwa charakterystyki energetycznej – część VII (16 zadań)

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/property-valuation-and-energy-performance-certification-services-for-13094/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
