---
title: "Primary school roof repair and climate resilience upgrade"
url: "https://pelenoir.com/en/tenders-of-europe/projects/primary-school-roof-repair-and-climate-resilience-upgrade-19533/"
id: 19533
country: "Ireland"
client: "S.N. na Carraige"
type: "Service contract"
procedure: "Open procedure"
deadline: "2026-12-01"
status: "closing"
days_left: 2
status_as_of: "2026-11-29"
value: "EUR 45 000"
disciplines: ["Architecture","Project and construction management"]
source: "Irish eTenders"
source_url: "https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=9498925"
updated: "2026-11-16"
publisher: "Pelenoir – Tenders of Europe"
---

# Primary school roof repair and climate resilience upgrade

> Full [architectural services](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) and Project Supervisor for the Design Process (PSDP) for a standalone roof replacement or repair project at a [primary school](https://pelenoir.com/en/tenders-of-europe/typologies/schools-and-education/), funded under the Climate Action Summer Works Scheme.

**Status (2026-11-29):** 2 days left to apply — deadline 2026-12-01 12:00  
**Location:** Ireland  
**Contracting authority:** S.N. na Carraige  
**Opportunity type:** Service contract — Open procedure  
**Declared value:** EUR 45 000  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Full architectural services and Project Supervisor for the Design Process (PSDP) for a standalone roof replacement or repair project at a primary school, funded under the Climate Action Summer Works Scheme.

## Scope of work

### Deliverables

- Architectural design and documentation for roof replacement/repair
- Project Supervisor for the Design Process (PSDP) services

### Required services

- Architectural services
- Project Supervisor Design Process (PSDP)

## Pelenoir assessment

The project involves a roof replacement or repair for a primary school, with a primary focus on architectural design and documentation. Additionally, it includes PSDP services to oversee design-phase compliance with health and safety regulations, reflecting a secondary but essential [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) component.

## How to take part

### Award criteria

- Price/Cost Effectiveness

## Disciplines

- **Architecture** (primary, 70%): Architectural design and documentation for roof replacement or repair, including climate resilience upgrades for the primary school.
- **Project and construction management** (secondary, 30%): Project Supervisor for the Design Process (PSDP) services, ensuring compliance with health and safety regulations during the design phase.

## Related projects

- [Regional sports and leisure centre redevelopment: architect-led design team](https://pelenoir.com/en/tenders-of-europe/projects/regional-sports-and-leisure-centre-redevelopment-architect-led-design-19919/) — Tralee, Ireland · Service contract · deadline 2026-12-18 (19 days left to apply)
- [New Domestic Violence Refuge in Mallow Town](https://pelenoir.com/en/tenders-of-europe/projects/new-domestic-violence-refuge-in-mallow-town-17220/) — Mallow Town, Ireland · Service contract · deadline 2026-11-30 (closes tomorrow)
- [School retrofit: window, door and insulation upgrade with bike rack](https://pelenoir.com/en/tenders-of-europe/projects/school-retrofit-window-door-and-insulation-upgrade-with-bike-rack-20160/) — Portumna, Ireland · Service contract · deadline 2026-12-11 (12 days left to apply)
- [New business school building with integrated design team lead by architect](https://pelenoir.com/en/tenders-of-europe/projects/new-business-school-building-with-integrated-design-team-lead-by-20158/) — Cork, Ireland · Service contract · deadline 2026-12-21 (22 days left to apply)
- [Abbey Theatre Building Condition Survey](https://pelenoir.com/en/tenders-of-europe/projects/abbey-theatre-building-condition-survey-17221/) — Dublin, Ireland · Service contract · deadline 2026-12-09 (10 days left to apply)
- [School toilet upgrades: redesigning student facilities on Inis Meáin island](https://pelenoir.com/en/tenders-of-europe/projects/school-toilet-upgrades-redesigning-student-facilities-on-inis-meain-19729/) — Ireland · Service contract · deadline 2026-12-16 (17 days left to apply)

## Source

Original notice on Irish eTenders: https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=9498925  
Original title: Tender for Architectural and PSDP Services for Standalone Roof Replacement/Repair Project

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/primary-school-roof-repair-and-climate-resilience-upgrade-19533/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
