---
title: "Pedestrian and cycle path construction on Wschodnia Street in Opole"
url: "https://pelenoir.com/en/tenders-of-europe/projects/pedestrian-and-cycle-path-construction-on-wschodnia-street-in-opole-14283/"
id: 14283
country: "Poland"
city: "Opole"
region: "Opolskie"
client: "Miejski Zarząd Dróg w Opolu"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 ustawy)"
deadline: "2026-10-23"
status: "closed"
days_left: -36
status_as_of: "2026-11-28"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df28fa-b48c-b847-5997-b20001d88d29"
updated: "2026-10-13"
publisher: "Pelenoir – Tenders of Europe"
---

# Pedestrian and cycle path construction on Wschodnia Street in Opole

> Construction of a pedestrian and [cycle path](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) along Wschodnia Street from the intersection with Grudzicka and Morcinka Streets to the driveway of property no.

**Status (2026-11-28):** Closed 36 days ago — deadline 2026-10-23 09:00  
**Location:** Opole, Opolskie, Poland  
**Contracting authority:** Miejski Zarząd Dróg w Opolu  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 ustawy)  
**CPV:** 71520000 Construction supervision services; 71540000 Construction management services; 71000000 Architectural, construction, engineering and inspection services; 71248000 Supervision of project and documentation; 71247000 Supervision of building work  

## About the project

Construction of a pedestrian and cycle path along Wschodnia Street from the intersection with Grudzicka and Morcinka Streets to the driveway of property no. 23a, including reconstruction of existing driveways, installation of railings, tree and shrub removal, new lighting, [water supply](https://pelenoir.com/en/tenders-of-europe/typologies/water-and-environment/) network reconstruction, and telecommunication infrastructure protection.

## Scope of work

Provision of comprehensive investor supervision (Inżynier Kontraktu) for the construction of a pedestrian and cycle path, including supervision of road, electrical, sanitary, and telecommunication works; financial and physical settlement of the project; preparation of monthly and final reports; and performance of verification tests. The scope is defined by the Polish Construction Law, the model contract, and the functional-utility program (PFU).

### Deliverables

- Supervision of road construction (pedestrian and cycle path, driveway reconstruction, railing installation, tree removal)
- Supervision of electrical works (new lighting system, demolition of existing fixtures)
- Supervision of sanitary works (water supply network reconstruction, hydrant reconstruction)
- Supervision of telecommunication works (construction of technological channel, protection of telecommunication networks)
- Financial and physical settlement reports (monthly and final)
- Verification test reports

### Required services

- [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (road, electrical, sanitary, telecommunication)
- project management and coordination
- financial and physical settlement of [construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/)
- preparation of progress and final reports
- performance of verification tests

## Pelenoir assessment

The project scope is explicitly focused on procurement of comprehensive investor supervision and project management services for the construction of a pedestrian and cycle path. No [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/), engineering, or other AEC disciplines are directly supported by the extracted facts.

## How to take part

### Who can apply

- Contractor must designate a road construction supervision inspector/team coordinator with unlimited construction qualifications in road engineering and relevant experience in pedestrian/cycle path or road construction supervision.
- Contractor must demonstrate experience in providing investor supervision for road construction projects (pedestrian/cycle paths or roads) within the last 7 years.
- Contractors may jointly apply for the contract, with each member meeting the eligibility criteria or collectively demonstrating the required qualifications and experience.
- Foreign contractors from EU member states must have their qualifications recognized under Polish law (Ustawa o zasadach uznania kwalifikacji zawodowych).

### What to submit

- Electronic offer signed with a qualified electronic signature, trusted signature, or personal signature
- Attachment No. 2: Statement on non-exclusion and fulfillment of participation conditions
- Attachment No. 3: Commitment of a third party to provide resources (if applicable)
- Attachment No. 4: Statement of joint bidders (if applicable)
- Documents may be requested later: Attachment No. 5 (list of personnel) and Attachment No. 6 (list of completed services with confirmation documents)

### Award criteria

- Price – 60%
- Experience of the contractor's personnel – 40%

## Disciplines

- **Project and construction management** (primary, 100%): Comprehensive investor supervision (Inżynier Kontraktu) for the construction of a pedestrian and cycle path, including supervision of road, electrical, sanitary, and telecommunication works; financial and physical settlement of the project; preparation of monthly and final reports; and performance of verification tests.

## Related projects

- [Heritage building conversion: potato storage turned into conservation workshops and education spaces](https://pelenoir.com/en/tenders-of-europe/projects/heritage-building-conversion-potato-storage-turned-into-conservation-20228/) — Oświęcim, Poland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Hospital refurbishment: cryotherapy suite in an active medical building](https://pelenoir.com/en/tenders-of-europe/projects/hospital-refurbishment-cryotherapy-suite-in-an-active-medical-building-19765/) — Warsaw, Poland · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Sailing marina construction: lakeside facility with landscaping in Mrągowo](https://pelenoir.com/en/tenders-of-europe/projects/sailing-marina-construction-lakeside-facility-with-landscaping-in-20661/) — Mrągowo, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Heritage culture centre: multi-discipline supervision for modernisation and conversion](https://pelenoir.com/en/tenders-of-europe/projects/heritage-culture-centre-multi-discipline-supervision-for-20822/) — Ząbkowice Śląskie, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Road modernisation: investor supervision for cross-border road upgrades](https://pelenoir.com/en/tenders-of-europe/projects/road-modernisation-investor-supervision-for-cross-border-road-upgrades-19952/) — Kłodzko, Poland · Service contract · deadline 2026-11-26 (closed 2 days ago)
- [Contract supervision: wooden boardwalk modernisation in a national park](https://pelenoir.com/en/tenders-of-europe/projects/contract-supervision-wooden-boardwalk-modernisation-in-a-national-park-19968/) — Kobylin-Borzymy, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df28fa-b48c-b847-5997-b20001d88d29  
Original title: Pełnienie kompleksowego nadzoru inwestorskiego dla zadania pn.: „Bezpieczny transport w Aglomeracji Opolskiej” w zakresie: ,,Budowa drogi dla pieszych i rowerów przy ul. Wschodniej (...)"

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/pedestrian-and-cycle-path-construction-on-wschodnia-street-in-opole-14283/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
