---
title: "Papeterie Jeand’Heurs partial deconstruction and site securing"
url: "https://pelenoir.com/en/tenders-of-europe/projects/papeterie-jeandheurs-partial-deconstruction-and-site-securing-9977/"
id: 9977
country: "France"
city: "L'Isle-en-Rigault"
region: "Grand Est"
client: "EPFGE"
type: "Service contract"
procedure: "Open procedure (procédure ouverte)"
deadline: "2026-10-20"
status: "closed"
days_left: -39
status_as_of: "2026-11-28"
disciplines: ["Project and construction management","Engineering"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-89907"
updated: "2026-09-18"
publisher: "Pelenoir – Tenders of Europe"
---

# Papeterie Jeand’Heurs partial deconstruction and site securing

> Project involves clearing, asbestos removal, partial deconstruction, and securing of the former Papeterie Jeand’Heurs site in L’Isle-en-Rigault.

**Status (2026-11-28):** Closed 39 days ago — deadline 2026-10-20 12:00  
**Location:** L'Isle-en-Rigault, Grand Est, France  
**Contracting authority:** EPFGE  
**Opportunity type:** Service contract — Open procedure (procédure ouverte)  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Project involves clearing, asbestos removal, partial deconstruction, and securing of the former Papeterie Jeand’Heurs site in L’Isle-en-Rigault. The contract covers the [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (maîtrise d’œuvre) for these works.

## Scope of work

The contract requires project management (maîtrise d’œuvre) services for clearing, asbestos removal, partial deconstruction, and securing of the Papeterie Jeand’Heurs site. Environmental criteria are part of the evaluation.

### Deliverables

- project management documentation
- asbestos removal plans
- deconstruction plans
- site security plans

### Required services

- project management (maîtrise d’œuvre)
- asbestos removal supervision
- deconstruction supervision
- site security planning

## Pelenoir assessment

The project primarily involves project management and technical planning for the remediation, deconstruction, and securing of an industrial site. The focus is on overseeing and coordinating specialized works such as asbestos removal and partial deconstruction, with an emphasis on environmental and safety compliance.

## How to take part

### Who can apply

- compliance with exclusion grounds (epo-procurement-document)
- no reserved procurement
- e-invoicing required

### What to submit

- tender submission via electronic means (esubmission required)

### Award criteria

- environmental criteria

## Disciplines

- **Project and construction management** (primary, 70%): Project management (maîtrise d’œuvre) for clearing, asbestos removal, partial deconstruction, and site securing, including supervision of works and coordination of environmental and safety requirements.
- **Engineering** (secondary, 30%): Technical planning and engineering supervision for asbestos removal, structural deconstruction, and site safety measures, including compliance with environmental criteria.

## Related projects

- [Urban renewal coordination: steering and scheduling for metropolitan regeneration](https://pelenoir.com/en/tenders-of-europe/projects/urban-renewal-coordination-steering-and-scheduling-for-metropolitan-20655/) — Clermont-Ferrand, France · Service contract · deadline 2026-12-23 (25 days left to apply)
- [Rénovation and reconstruction of EHPAD Résidence Marguerite de Flandre](https://pelenoir.com/en/tenders-of-europe/projects/renovation-and-reconstruction-of-ehpad-residence-marguerite-de-flandre-17897/) — Nieppe, France · Service contract · deadline 2026-12-04 (6 days left to apply)
- [Bouzule Experimental Farm ICPE Compliance Framework Agreement](https://pelenoir.com/en/tenders-of-europe/projects/bouzule-experimental-farm-icpe-compliance-framework-agreement-16172/) — Laneuvelotte, France · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Student life facilities: programming and client-side project management framework](https://pelenoir.com/en/tenders-of-europe/projects/student-life-facilities-programming-and-client-side-project-20798/) — Région Pays de la Loire, France · Framework agreement · deadline 2027-01-14 (47 days left to apply)
- [Eco-education centre: construction supervision for a new forest-themed hub](https://pelenoir.com/en/tenders-of-europe/projects/eco-education-centre-construction-supervision-for-a-new-forest-themed-19957/) — Łask, Poland · Service contract · deadline 2026-11-26 (closed 2 days ago)
- [Building supervision: roof repair, ventilation removal and bike shelter for a public office](https://pelenoir.com/en/tenders-of-europe/projects/building-supervision-roof-repair-ventilation-removal-and-bike-shelter-20820/) — Poznań, Poland · Service contract · deadline 2026-12-03 (5 days left to apply)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-89907  
Original title: L’ISLE-EN-RIGAULT – Papeterie Jeand’Heurs – Curage, désamiantage, déconstruction partielle et mise en sécurité – Mission de maîtrise d’œuvre

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/papeterie-jeandheurs-partial-deconstruction-and-site-securing-9977/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
