---
title: "Northern Finland Vitality Centre Traffic Safety Framework Agreement 2027-2029"
url: "https://pelenoir.com/en/tenders-of-europe/projects/northern-finland-vitality-centre-traffic-safety-framework-agreement-14770/"
id: 14770
country: "Finland"
region: "Northern Ostrobothnia and Kainuu"
client: "Pohjois-Suomen elinvoimakeskus"
type: "Framework agreement"
procedure: "open procedure"
deadline: "2026-11-16"
status: "closed"
days_left: -12
status_as_of: "2026-11-28"
value: "EUR 740 000"
disciplines: ["Specialist consulting","Project and construction management"]
source: "HILMA"
source_url: "https://www.hankintailmoitukset.fi/en/public/procedure/38710/enotice/59505/"
updated: "2026-10-15"
publisher: "Pelenoir – Tenders of Europe"
---

# Northern Finland Vitality Centre Traffic Safety Framework Agreement 2027-2029

> Traffic safety that accounts for who feels safe. And who doesn’t

**Status (2026-11-28):** Closed 12 days ago — deadline 2026-11-16 11:00  
**Location:** Northern Ostrobothnia and Kainuu, Finland  
**Contracting authority:** Pohjois-Suomen elinvoimakeskus  
**Opportunity type:** Framework agreement — open procedure  
**Declared value:** EUR 740 000  
**CPV:** 71240000 Architectural, engineering and planning services  

## About the project

[Framework agreement](https://pelenoir.com/en/tenders-of-europe/types/framework-agreements/) for traffic safety work in Northern Ostrobothnia and Kainuu regions, including traffic safety operator tasks, promotion of mobility guidance and accessibility, and other expert tasks such as traffic sign decisions, surveys, and plans. The consultant is responsible for project implementation, stakeholder coordination, and maintaining an interaction portal.

## Why it matters

Traffic safety in Northern [Finland](https://pelenoir.com/en/tenders-of-europe/countries/finland/) isn’t just about rules. It’s about designing measures that account for who feels safe enough to move freely in public spaces.

> Northern Finland’s framework for traffic safety includes accessibility planning, but the brief doesn’t define how ‘accessible’ should translate into specific measures for different users.

The team will shape what ‘safe’ means for the people who move through public spaces. Not just by following rules, but by deciding which barriers matter most to remove.

## Scope of work

Framework agreement for traffic safety operator tasks, mobility guidance and accessibility promotion, and other traffic safety-related expert services. Tasks include annual action plans, budgeting, event coordination, stakeholder collaboration, and maintaining an interaction portal. The consultant must manage project implementation and stakeholder needs.

### Deliverables

- annual regional action plan and report
- budget and cost monitoring
- event scheduling and coordination
- traffic safety improvement reviews (e.g., audits)
- monitoring of traffic safety plan measures
- mobility guidance and accessibility assessments
- interaction portal maintenance

### Required services

- traffic safety consulting
- mobility management
- accessibility planning
- stakeholder coordination
- [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/)
- reporting and monitoring

## Pelenoir assessment

This project is primarily a specialist consulting engagement focused on traffic safety, mobility management, and accessibility planning for a regional development agency. It also includes secondary project and construction management tasks such as stakeholder coordination, budgeting, and reporting. The scope does not support traditional architectural, engineering, or design disciplines but centers on advisory and operational services.

## How to take part

### Who can apply

- compliance with exclusion criteria (e.g., no criminal convictions, no tax or social security payment breaches)
- no bankruptcy or insolvency proceedings
- no conflicts of interest
- no prior involvement in procurement preparation

### What to submit

- procurement documents
- ESPD (European Single Procurement Document)

### Award criteria

- Price (30%)
- Quality (70%)

## Disciplines

- **Specialist consulting** (primary, 70%): Traffic safety consulting, mobility management, accessibility planning, and expert advisory services for regional traffic safety initiatives, including action plans, stakeholder coordination, and interaction portal maintenance.
- **Project and construction management** (secondary, 30%): Project implementation management, stakeholder coordination, budgeting, cost monitoring, and reporting for the framework agreement's traffic safety initiatives.

## Related projects

- [Moisture and indoor air investigations for municipal buildings 2027–2028](https://pelenoir.com/en/tenders-of-europe/projects/moisture-and-indoor-air-investigations-for-municipal-buildings-17937/) — Turku, Finland · Service contract · deadline 2026-12-11 (13 days left to apply)
- [Heka Condition Surveys for Residential Buildings](https://pelenoir.com/en/tenders-of-europe/projects/heka-condition-surveys-for-residential-buildings-17688/) — Helsinki, Finland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Heka Building Condition Surveys Framework Agreement](https://pelenoir.com/en/tenders-of-europe/projects/heka-building-condition-surveys-framework-agreement-18748/) — Helsinki, Finland · Service contract · deadline 2026-12-11 (13 days left to apply)
- [Framework agreement for water planning and structural design services](https://pelenoir.com/en/tenders-of-europe/projects/framework-agreement-for-water-planning-and-structural-design-services-18191/) — Finland · Framework agreement · deadline 2026-12-14 (16 days left to apply)
- [Strategic noise mapping and action plans for Irish cities and transport networks](https://pelenoir.com/en/tenders-of-europe/projects/strategic-noise-mapping-and-action-plans-for-irish-cities-and-20642/) — Ireland · Framework agreement · deadline 2027-01-08 (41 days left to apply)
- [Turku urban planning expert services framework agreement](https://pelenoir.com/en/tenders-of-europe/projects/turku-urban-planning-expert-services-framework-agreement-17442/) — Turku, Finland · Framework agreement · deadline 2026-12-14 (16 days left to apply)

## Source

Original notice on HILMA: https://www.hankintailmoitukset.fi/en/public/procedure/38710/enotice/59505/  
Original title: Pohjois-Suomen elinvoimakeskuksen liikenneturvallisuustyön puitesopimus 2027 - 2029

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/northern-finland-vitality-centre-traffic-safety-framework-agreement-14770/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
