---
title: "Northern Bypass Concept for Tomaszów Mazowiecki"
url: "https://pelenoir.com/en/tenders-of-europe/projects/northern-bypass-concept-for-tomaszow-mazowiecki-17285/"
id: 17285
country: "Poland"
city: "Tomaszów Mazowiecki"
region: "Łódzkie"
client: "GMINA MIASTO TOMASZÓW MAZOWIECKI"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)"
deadline: "2026-11-16"
status: "closed"
days_left: -12
status_as_of: "2026-11-28"
value: "PLN 365 854 (≈ EUR 82 032)"
disciplines: ["Engineering","Urban design and planning"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df398a-ecef-1b8f-e2d6-6b000120d4f6"
updated: "2026-11-03"
publisher: "Pelenoir – Tenders of Europe"
---

# Northern Bypass Concept for Tomaszów Mazowiecki

> A 2.7 km bypass road’s conceptual design turns drainage and lighting into seamless daily use.

**Status (2026-11-28):** Closed 12 days ago — deadline 2026-11-16 09:30  
**Location:** Tomaszów Mazowiecki, Łódzkie, Poland  
**Contracting authority:** GMINA MIASTO TOMASZÓW MAZOWIECKI  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)  
**Declared value:** PLN 365 854 (≈ EUR 82 032)  
**CPV:** 71320000 Engineering design services; 71322000 Engineering design services for the construction of civil engineering works; 71200000 Architectural and related services; 71310000 Consultative engineering and construction services  

## About the project

Development of a conceptual design for a 2.7 km northern bypass road in Tomaszów Mazowiecki, including one [bridge](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) or tunnel, intersections, drainage, and lighting. The design must comply with technical and safety standards and assess land acquisition needs.

## Why it matters

A  ̄ km bypass road’s conceptual design turns drainage, lighting, and land acquisition into seamless daily traffic flow.

## Scope of work

Development of a conceptual design for a 2.7 km northern bypass road (class G) in Tomaszów Mazowiecki, including one bridge or tunnel, intersections (roundabout with provincial road DW 713 and standard intersections), drainage, lighting, geotechnical surveys, land acquisition assessment, and cost estimation for the selected variant. The design must comply with technical and safety standards (BRD) and minimize impact on residential areas and protected natural zones.

### Deliverables

- Conceptual design for the northern bypass road
- Geotechnical survey report with recommended ground reinforcement
- Assessment of land acquisition needs
- Cost estimation for the selected design variant
- Two preliminary route concepts for client selection

### Required services

- [Civil engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) design
- Road design (class G parameters)
- Bridge/tunnel design
- Geotechnical investigations
- Traffic safety analysis
- Environmental impact assessment (minimizing disruption to protected areas)

## Pelenoir assessment

This project primarily involves the conceptual design of a northern bypass road, requiring civil engineering and technical planning for road infrastructure, including structural elements like a bridge or tunnel. Secondary [urban design](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) and planning aspects are also present, focusing on land acquisition and environmental impact mitigation.

## How to take part

### Who can apply

- Execution of at least two similar road design projects (class G or higher, minimum 2 km each) in the last five years
- Execution of at least two bridge/tunnel/viaduct design projects in the last five years
- Availability of qualified personnel: road designer (unlimited design license, two completed road designs) and bridge designer (unlimited design license, two completed bridge/tunnel designs)

### What to submit

- Completed offer form (CZĘŚĆ II SWZ - FORMULARZ OFERTY)
- Statement on non-exclusion and fulfillment of participation conditions (ZAŁ. 1 SWZ)
- For consortia: statement on division of tasks (ZAŁ. 3 SWZ)
- For reliance on third-party resources: commitment statement (ZAŁ. 4 SWZ)
- Power of attorney (if applicable)

### Award criteria

- Price (100% weight)

## Tender documents

The visible document package includes the full tender specifications (SWZ) in three parts: Part I (general conditions and scope), Part II (offer form), and Part III (contract template). It also contains required submission forms such as declarations on eligibility and non-exclusion (ZAŁ. 1 and ZAŁ. 2), consortium statements (ZAŁ. 3), and subcontractor commitment forms (ZAŁ. 4). The published notice PDF provides the official tender announcement. The files likely detail the technical, legal, and procedural requirements for submitting an offer, but the exact content of the Word and PDF documents cannot be confirmed without access. No drawings, maps, or geotechnical reports are visibly included in the file names.

## Disciplines

- **Engineering** (primary, 80%): Civil engineering design for the 2.7 km northern bypass road, including structural design for a bridge or tunnel, intersections, drainage, lighting, geotechnical surveys, and compliance with technical and safety standards.
- **Urban design and planning** (secondary, 20%): Assessment of land acquisition needs, minimization of impact on residential areas and protected natural zones, and integration of the bypass into the existing urban fabric.

## Related projects

- [Cycle path design: expansion of regional road to connect Zalesie village](https://pelenoir.com/en/tenders-of-europe/projects/cycle-path-design-expansion-of-regional-road-to-connect-zalesie-20254/) — Zalesie, Poland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Bridge extension: widening a county road bridge over the Tanew River](https://pelenoir.com/en/tenders-of-europe/projects/bridge-extension-widening-a-county-road-bridge-over-the-tanew-river-20808/) — Dąbrówka, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Road design: full documentation for new street construction in Nowogard](https://pelenoir.com/en/tenders-of-europe/projects/road-design-full-documentation-for-new-street-construction-in-nowogard-20223/) — Nowogard, Poland · Service contract · deadline 2026-12-10 (12 days left to apply)
- [Rural road design: new 1 km link to improve access and safety in Olszówka](https://pelenoir.com/en/tenders-of-europe/projects/rural-road-design-new-1-km-link-to-improve-access-and-safety-in-20232/) — Mszana Dolna, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Three bridge redesigns: multi-discipline design and site supervision in Warsaw](https://pelenoir.com/en/tenders-of-europe/projects/three-bridge-redesigns-multi-discipline-design-and-site-supervision-19946/) — Warsaw, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Footpath construction: new sidewalk along a county road in Krużlowa Niżna](https://pelenoir.com/en/tenders-of-europe/projects/footpath-construction-new-sidewalk-along-a-county-road-in-kruzlowa-20809/) — Krużlowa Niżna, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df398a-ecef-1b8f-e2d6-6b000120d4f6  
Original title: Opracowanie koncepcji przebiegu północnej obwodnicy Tomaszowa Mazowieckiego

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/northern-bypass-concept-for-tomaszow-mazowiecki-17285/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
