---
title: "Noise impact study for Marchfeld motorway western section approval process"
url: "https://pelenoir.com/en/tenders-of-europe/projects/noise-impact-study-for-marchfeld-motorway-western-section-approval-21382/"
id: 21382
country: "Austria"
region: "Weinviertel"
client: "Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft"
type: "Service contract"
procedure: "open procedure (Offenes Verfahren)"
deadline: "2026-12-07"
status: "open"
days_left: 9
status_as_of: "2026-11-28"
disciplines: ["Engineering","Specialist consulting"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-a4227baf-3d02-4d80-bcea-2ab961c6452c"
updated: "2026-11-25"
publisher: "Pelenoir – Tenders of Europe"
---

# Noise impact study for Marchfeld motorway western section approval process

> Acoustic investigation and noise assessment for the S8 Marchfeld [motorway](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) western section as part of an ongoing complaint procedure during the planning phase (Einreichprojekt).

**Status (2026-11-28):** 9 days left to apply — deadline 2026-12-07  
**Location:** Weinviertel, Austria  
**Contracting authority:** Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft  
**Opportunity type:** Service contract — open procedure (Offenes Verfahren)  
**CPV:** 71240000 Architectural, engineering and planning services  

## About the project

Acoustic investigation and noise assessment for the S8 Marchfeld motorway western section as part of an ongoing complaint procedure during the planning phase (Einreichprojekt). The goal is to achieve legally binding project approval through the Federal Administrative Court (BVwG) process.

## Scope of work

Conduct a noise impact study for the S8 Marchfeld motorway western section as part of an ongoing complaint procedure during the planning phase. The study aims to achieve legally binding project approval through the Federal Administrative Court (BVwG).

### Deliverables

- Noise investigation report
- Legal project approval documentation

### Required services

- Acoustic engineering
- Environmental impact assessment
- Noise measurement and modeling
- Regulatory compliance documentation

## Pelenoir assessment

This project is primarily an engineering and technical planning assignment focused on noise impact assessment and regulatory compliance for a motorway section during its planning phase. The scope also includes specialist consulting to support legal approval processes.

## How to take part

### Who can apply

- Open to qualified engineering and environmental consultancies
- Consortia allowed (maximum 2 members)

### What to submit

- Offers must be submitted electronically via www.provia.at
- Submission language: German
- Electronic invoicing required

### Award criteria

- Price (net total price as per documents)
- Quality (offered quality as per documents)

## Tender documents

The visible files include several PDFs labeled as noise study attachments, bidder questions, and section division documents for the S8 Marchfeld motorway western section. One ZIP file, 'AU_Lärm_S8West.zip', likely contains additional planning documents or drawings related to the noise investigation. The PDFs appear to cover contractual conditions, technical specifications, and responses to bidder inquiries. The exact contents of the ZIP file remain uncertain, but it may include detailed noise maps, measurement data, or regulatory compliance files based on the project context.

## Disciplines

- **Engineering** (primary, 80%): Acoustic engineering, noise measurement and modeling, environmental impact assessment, and regulatory compliance documentation for the motorway section.
- **Specialist consulting** (secondary, 20%): Advisory support for legal compliance and documentation required for project approval through the Federal Administrative Court (BVwG) process.

## Related projects

- [Railway electrification: track and bridge renewal between Jennersdorf and Gleisdorf](https://pelenoir.com/en/tenders-of-europe/projects/railway-electrification-track-and-bridge-renewal-between-jennersdorf-20488/) — Jennersdorf, Austria · Service contract · deadline 2026-12-11 (13 days left to apply)
- [District heating plant: new biomass facility with 2,000 kW thermal output](https://pelenoir.com/en/tenders-of-europe/projects/district-heating-plant-new-biomass-facility-with-2-000-kw-thermal-20463/) — Weitra, Austria · Service contract · deadline 2026-12-21 (23 days left to apply)
- [Motorway expansion: full upgrade of A5 Nord/Weinviertel from Poysbrunn to national border](https://pelenoir.com/en/tenders-of-europe/projects/motorway-expansion-full-upgrade-of-a5-nord-weinviertel-from-poysbrunn-19306/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Motorway tunnel water hardness stabilisation: hydrogeochemical surveys for drainage upgrades](https://pelenoir.com/en/tenders-of-europe/projects/motorway-tunnel-water-hardness-stabilisation-hydrogeochemical-surveys-19705/) — Gratkorn, Austria · Service contract · deadline 2027-01-13 (46 days left to apply)
- [Tunnel safety coordination: Semmering expressway's Tanzenberg tunnel construction](https://pelenoir.com/en/tenders-of-europe/projects/tunnel-safety-coordination-semmering-expressway-s-tanzenberg-tunnel-20323/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [S8 Marchfeld Expressway West Section Noise Study](https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-noise-study-16570/) — Austria · Service contract · deadline 2026-12-07 (9 days left to apply)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-a4227baf-3d02-4d80-bcea-2ab961c6452c  
Original title: S 8 Marchfeld Schnellstraße Abschnitt West - KN S 1/S 8 bis ASt L9 - Lärmtechnische Untersuchung im anhängigen Beschwerdeverfahren in der Planungsphase EP

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/noise-impact-study-for-marchfeld-motorway-western-section-approval-21382/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
