---
title: "New Police Headquarters in Niort"
url: "https://pelenoir.com/en/tenders-of-europe/projects/new-police-headquarters-in-niort-9928/"
id: 9928
country: "France"
city: "Niort"
region: "Nouvelle-Aquitaine"
client: "SGAMI SUD-OUEST"
type: "Design contest"
procedure: "Restricted procedure (Procédure Restreinte)"
deadline: "2026-10-30"
status: "closed"
days_left: -29
status_as_of: "2026-11-28"
disciplines: ["Architecture","Engineering","Sustainability"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-94397"
updated: "2026-10-02"
publisher: "Pelenoir – Tenders of Europe"
---

# New Police Headquarters in Niort

> Construction of a new police headquarters building in Niort, [France](https://pelenoir.com/en/tenders-of-europe/countries/france/), including [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/), functional and technical planning, and environmental integration.

**Status (2026-11-28):** Closed 29 days ago — deadline 2026-10-30 12:00  
**Location:** Niort, Nouvelle-Aquitaine, France  
**Contracting authority:** SGAMI SUD-OUEST  
**Opportunity type:** Design contest — Restricted procedure (Procédure Restreinte)  
**Prize money:** EUR 50 000  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Construction of a new police headquarters building in Niort, France, including architectural design, functional and technical planning, and environmental integration.

## Scope of work

Restricted [design competition](https://pelenoir.com/en/tenders-of-europe/types/design-contests/) for the architectural and technical master planning of a new police headquarters building. The competition is structured in two phases: a first phase for candidate selection, followed by a second phase for detailed proposal submission by selected candidates.

### Deliverables

- Architectural design proposals
- Functional and technical planning documents
- Environmental and energy integration studies

### Required services

- Architectural design
- Master planning (Maîtrise d'oeuvre)
- Technical and functional planning
- Environmental and [energy efficiency](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) consulting

## Pelenoir assessment

The project is primarily an architectural design competition for a new police headquarters, with a strong focus on architectural concept and building design. Secondary disciplines include technical planning and sustainability consulting to support the functional, environmental, and energy performance requirements of the facility.

## How to take part

### Who can apply

- Open to qualified candidates under restricted procedure rules
- Four candidates will be shortlisted for the second phase
- Site visit mandatory for shortlisted candidates in the second phase

### What to submit

- Submissions must comply with the competition regulations (Règlement d'Appel à candidature)
- Documents must be in French

### Award criteria

- Architectural and integration quality (20%)
- Functional and technical quality (30%)
- Environmental and energy quality (20%)
- Planning (10%)
- Cost compatibility with client budget (20%)

## Disciplines

- **Architecture** (primary, 60%): Architectural concept, building design, and integration of the new police headquarters, including functional and spatial organization to meet operational requirements.
- **Engineering** (secondary, 25%): Technical planning, structural engineering, and building services design to ensure the functional and operational requirements of the police headquarters are met.
- **Sustainability** (secondary, 15%): Environmental and energy integration studies, sustainability consulting, and compliance with energy efficiency standards for the building.

## Related projects

- [Restructuring of the catering service at Lycée du Parc Lyon](https://pelenoir.com/en/tenders-of-europe/projects/restructuring-of-the-catering-service-at-lycee-du-parc-lyon-17892/) — Lyon, France · Design contest · deadline 2027-01-08 (41 days left to apply)
- [Architectural competition: new 50-bed boarding school for vocational training campus](https://pelenoir.com/en/tenders-of-europe/projects/architectural-competition-new-50-bed-boarding-school-for-vocational-20550/) — Fougères, France · Design contest · deadline 2026-12-22 (24 days left to apply)
- [Rehabilitation of Le Bosquet student residence](https://pelenoir.com/en/tenders-of-europe/projects/rehabilitation-of-le-bosquet-student-residence-15278/) — Les Ulis, France · Design contest · deadline 2026-12-01 (3 days left to apply)
- [Construction and renovation of senior residences in Haut Pays Bigouden](https://pelenoir.com/en/tenders-of-europe/projects/construction-and-renovation-of-senior-residences-in-haut-pays-bigouden-16627/) — Pouldreuzic; Plozévet, France · Design contest · deadline 2026-12-04 (6 days left to apply)
- [Kawéni Medical-Social Centre and Hospital Annex](https://pelenoir.com/en/tenders-of-europe/projects/kaweni-medical-social-centre-and-hospital-annex-16947/) — Mamoudzou, France · Design contest · deadline 2026-12-03 (5 days left to apply)
- [Hospital expansion and refurbishment: doubling capacity for rehabilitation care](https://pelenoir.com/en/tenders-of-europe/projects/hospital-expansion-and-refurbishment-doubling-capacity-for-19429/) — Illkirch, France · Design contest · deadline 2026-12-16 (18 days left to apply)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-94397  
Original title: SGAMI33-2026-28-FCS Concours restreint pour un marché de maîtrise d'oeuvre relatif à la construction du nouvel Hôtel de Police à NIORT (79)

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/new-police-headquarters-in-niort-9928/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
