---
title: "New Meervaart Theatre Construction Cost Manager"
url: "https://pelenoir.com/en/tenders-of-europe/projects/new-meervaart-theatre-construction-cost-manager-9060/"
id: 9060
country: "Netherlands"
city: "Amsterdam"
client: "Gemeente Amsterdam, Ingenieursbureau"
type: "Service contract"
procedure: "Open procedure (openbaar)"
deadline: "2026-11-04"
status: "closed"
days_left: -24
status_as_of: "2026-11-28"
disciplines: ["Project and construction management"]
source: "TenderNed"
source_url: "https://www.tenderned.nl/aankondigingen/overzicht/440440"
updated: "2026-09-18"
publisher: "Pelenoir – Tenders of Europe"
---

# New Meervaart Theatre Construction Cost Manager

> Procurement of a construction cost manager to ensure the integral design task for the new Meervaart [Theatre](https://pelenoir.com/en/tenders-of-europe/typologies/culture-and-heritage/) and redevelopment of the southwest bank of the Sloterplas remains within budget.

**Status (2026-11-28):** Closed 24 days ago — deadline 2026-11-04 14:00  
**Location:** Amsterdam, Netherlands  
**Contracting authority:** Gemeente Amsterdam, Ingenieursbureau  
**Opportunity type:** Service contract — Open procedure (openbaar)  
**CPV:** 71300000 Engineering services; 45212322; 71000000 Architectural, construction, engineering and inspection services  

## About the project

Procurement of a construction cost manager to ensure the integral design task for the new Meervaart Theatre and redevelopment of the southwest bank of the Sloterplas remains within budget. The cost manager will collaborate with a multidisciplinary architectural team and other disciplines involved in the design process.

## Scope of work

The construction cost manager will collaborate with a multidisciplinary design team to ensure the integral design for the new Meervaart Theatre and redevelopment of the southwest bank of the Sloterplas remains within budget. The role involves proactive management of financial feasibility, budget impact of design choices, and coordination among disciplines to prevent delays.

### Deliverables

- Plan of Approach for Collaboration (max 3 A4 pages)

### Required services

- construction cost management
- budget impact assessment of design choices
- collaboration and communication management within a multidisciplinary design team

## Pelenoir assessment

The project scope is explicitly focused on procuring a construction cost manager to oversee budget adherence and financial feasibility for the new Meervaart Theatre and urban redevelopment. This role is classified under project and [construction management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/), as it involves cost control, coordination, and financial oversight rather than direct design or technical engineering work.

## How to take part

### Who can apply

- Open to all economic operators under the Dutch Public Procurement Act 2012 (Aanbestedingswet 2012)
- No reserved participation

### What to submit

- Tender submission in Dutch
- Electronic submission via [TenderNed](https://pelenoir.com/en/tenders-of-europe/sources/tenderned/)
- Plan of Approach for Collaboration (EMVI-kwaliteitscriterium A)
- Prijzenblad inclusief inschrijfbiljet (annex 5)

### Award criteria

- Price (Inschrijvingssom) - weight not specified
- Quality (EMVI-kwaliteitscriterium A: Plan van Aanpak Samenwerking) - weight not specified

## Tender documents

The visible files include two PDFs and two ZIP archives. The PDFs likely contain the official tender notice and contractual terms, such as the announcement of the procurement and general conditions. The first ZIP file, labeled 'AI 2026-0173 aanbestedingsdossier,' probably contains the full procurement dossier, including detailed tender documents, technical specifications, and annexes such as the prijzenblad and inschrijfbiljet. The second ZIP file, 'Document package.zip,' may duplicate or supplement the procurement dossier. The exact contents of the ZIP files cannot be confirmed without access, but their names suggest they include plans, drawings, and contractual documents.

## Disciplines

- **Project and construction management** (primary, 100%): The construction cost manager will oversee financial feasibility, assess the budget impact of design choices, and coordinate among multidisciplinary teams to ensure the project remains within budget throughout the design and construction phases.

## Related projects

- [Curio West-Brabant building inspection and maintenance planning](https://pelenoir.com/en/tenders-of-europe/projects/curio-west-brabant-building-inspection-and-maintenance-planning-16338/) — Breda, Netherlands · Service contract · deadline 2026-12-07 (9 days left to apply)
- [School construction: integrated building management for two new secondary schools](https://pelenoir.com/en/tenders-of-europe/projects/school-construction-integrated-building-management-for-two-new-19922/) — Franeker, Netherlands · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Public swimming pool: construction and project management](https://pelenoir.com/en/tenders-of-europe/projects/public-swimming-pool-construction-and-project-management-19931/) — Hoogeveen, Netherlands · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Haags Montessori Lyceum Consolidation Project](https://pelenoir.com/en/tenders-of-europe/projects/haags-montessori-lyceum-consolidation-project-8912/) — The Hague, Netherlands · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Highway service base: local construction supervision for new motorway section](https://pelenoir.com/en/tenders-of-europe/projects/highway-service-base-local-construction-supervision-for-new-motorway-20098/) — Rudersdorf, Austria · Service contract · deadline 2026-12-11 (13 days left to apply)
- [Primary school extension: local construction supervision in Vienna](https://pelenoir.com/en/tenders-of-europe/projects/primary-school-extension-local-construction-supervision-in-vienna-20491/) — Vienna, Austria · Service contract · deadline 2026-12-11 (13 days left to apply)

## Source

Original notice on TenderNed: https://www.tenderned.nl/aankondigingen/overzicht/440440  
Original title: AI 2026-0173 - Bouwkostenmanager nieuwbouw Nieuwe Meervaart

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/new-meervaart-theatre-construction-cost-manager-9060/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
