---
title: "New business school building with integrated design team lead by architect"
url: "https://pelenoir.com/en/tenders-of-europe/projects/new-business-school-building-with-integrated-design-team-lead-by-20158/"
id: 20158
country: "Ireland"
city: "Cork"
client: "University College Cork"
type: "Service contract"
procedure: "Restricted (Two Stage Restricted Procedure)"
deadline: "2026-12-21"
status: "open"
days_left: 23
status_as_of: "2026-11-28"
value: "EUR 2.5 m"
disciplines: ["Architecture","Engineering","Project and construction management"]
source: "Irish eTenders"
source_url: "https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=9527960"
updated: "2026-11-20"
publisher: "Pelenoir – Tenders of Europe"
---

# New business school building with integrated design team lead by architect

> An architect leading an integrated design team: where university circulation becomes the first rule of daily use.

**Status (2026-11-28):** 23 days left to apply — deadline 2026-12-21 12:00  
**Location:** Cork, Ireland  
**Contracting authority:** University College Cork  
**Opportunity type:** Service contract — Restricted (Two Stage Restricted Procedure)  
**Declared value:** EUR 2.5 m  
**CPV:** 71000000 Architectural, construction, engineering and inspection services; 71200000 Architectural and related services; 71300000 Engineering services; 71240000 Architectural, engineering and planning services; 71321000 Engineering design services for mechanical and electrical installations for buildings; 71311000 Civil engineering consultancy services; 71312000 Structural engineering consultancy services; 71313000 Environmental engineering consultancy services  

## About the project

Procurement of an integrated design team to deliver a new business [school building](https://pelenoir.com/en/tenders-of-europe/typologies/schools-and-education/) on Perrott’s Avenue, University College Cork. The team will be led by an architect and include civil and [structural engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/), mechanical and electrical engineering, project supervisor design process, and energy efficient design coordination services.

## Why it matters

An architect leading an integrated design team for a university building turns circulation and adaptability into the first quiet rules of daily use.

> The tender for a new business school building at University College Cork names an architect. Not a project manager. As the lead of the integrated design team.

This structure turns architectural expertise into the quiet backbone of the entire project, from circulation to adaptability, long before the first lecture begins.

## Scope of work

Appointment of an integrated design team led by an architect to provide [consultancy services](https://pelenoir.com/en/tenders-of-europe/disciplines/consulting/) for the new Cork University Business School building. Required services include architectural, civil and structural engineering, mechanical and electrical engineering, project supervisor design process, and energy efficient design coordination. Quantity [surveying](https://pelenoir.com/en/tenders-of-europe/disciplines/surveying/) services are excluded and will be procured separately.

### Deliverables

- Integrated design team services for new business school building

### Required services

- [Architectural services](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/)
- Civil and structural engineering services
- Mechanical and electrical engineering services
- Project supervisor design process (PSDP)
- Energy efficient design coordination (EED)

## Pelenoir assessment

The project involves the procurement of an integrated design team for a new business school building, with a primary focus on architectural design and leadership. Secondary disciplines include engineering and technical planning for structural, civil, mechanical, and electrical aspects, as well as project and [construction management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) for design process supervision and [energy efficiency](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) coordination.

## How to take part

### Award criteria

- Most Economically Advantageous Tender (MEAT)

## Disciplines

- **Architecture** (primary, 50%): Architectural concept, building design, and overall design leadership for the new business school building, including coordination of the integrated design team.
- **Engineering** (secondary, 30%): Civil and structural engineering, mechanical and electrical engineering, and technical coordination to support the building's design and construction.
- **Project and construction management** (secondary, 20%): Project supervision design process (PSDP) and coordination of energy-efficient design to ensure compliance and integration with the overall project.

## Related projects

- [Regional sports and leisure centre redevelopment: architect-led design team](https://pelenoir.com/en/tenders-of-europe/projects/regional-sports-and-leisure-centre-redevelopment-architect-led-design-19919/) — Tralee, Ireland · Service contract · deadline 2026-12-18 (20 days left to apply)
- [New Domestic Violence Refuge in Mallow Town](https://pelenoir.com/en/tenders-of-europe/projects/new-domestic-violence-refuge-in-mallow-town-17220/) — Mallow Town, Ireland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Primary school roof repair and climate resilience upgrade](https://pelenoir.com/en/tenders-of-europe/projects/primary-school-roof-repair-and-climate-resilience-upgrade-19533/) — Ireland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Abbey Theatre Building Condition Survey](https://pelenoir.com/en/tenders-of-europe/projects/abbey-theatre-building-condition-survey-17221/) — Dublin, Ireland · Service contract · deadline 2026-12-09 (11 days left to apply)
- [Heritage regeneration masterplan and delivery strategy for a coastal fort](https://pelenoir.com/en/tenders-of-europe/projects/heritage-regeneration-masterplan-and-delivery-strategy-for-a-coastal-19534/) — Ireland · Service contract · deadline 2026-12-15 (17 days left to apply)
- [School retrofit: window, door and insulation upgrade with bike rack](https://pelenoir.com/en/tenders-of-europe/projects/school-retrofit-window-door-and-insulation-upgrade-with-bike-rack-20160/) — Portumna, Ireland · Service contract · deadline 2026-12-11 (13 days left to apply)

## Source

Original notice on Irish eTenders: https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=9527960  
Original title: Appointment of Integrated Design Team for Cork University Business School New Building

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/new-business-school-building-with-integrated-design-team-lead-by-20158/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
