---
title: "N54 Lobbes-Erquelinnes Missing Link Road Studies"
url: "https://pelenoir.com/en/tenders-of-europe/projects/n54-lobbes-erquelinnes-missing-link-road-studies-18246/"
id: 18246
country: "Belgium"
city: "Lobbes"
region: "Wallonia"
client: "SPW-O8.06.02 - Direction des Routes de Charleroi"
type: "Service contract"
procedure: "open procedure"
deadline: "2026-12-08"
status: "open"
days_left: 10
status_as_of: "2026-11-28"
disciplines: ["Engineering","Sustainability","Surveying"]
source: "Belgian e-Procurement"
source_url: "https://www.publicprocurement.be/publication-workspaces/63a9f4ba-d8bb-4895-810b-8be303b3b248/general"
updated: "2026-11-09"
publisher: "Pelenoir – Tenders of Europe"
---

# N54 Lobbes-Erquelinnes Missing Link Road Studies

> Geological and technical studies draft the first layer of daily mobility.

**Status (2026-11-28):** 10 days left to apply — deadline 2026-12-08 10:00  
**Location:** Lobbes, Wallonia, Belgium  
**Contracting authority:** SPW-O8.06.02 - Direction des Routes de Charleroi  
**Opportunity type:** Service contract — open procedure  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Comprehensive study contract for the new N54 road section between Lobbes and Erquelinnes, including preliminary design, environmental assessments, and technical studies. The project is structured in firm and conditional phases (tranches fermes and tranches conditionnelles) with a total execution period of four years.

## Why it matters

N54 road studies draft the first layer of daily mobility, where geological and technical assessments meet environmental compliance. Engineers shape the quiet work of turning a missing link into a route.

## Scope of work

The contract requires comprehensive preliminary studies for the new N54 road section, including environmental impact assessments, [technical design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/), geological and hydrogeological studies, noise impact studies, visibility analyses, and ecological inventories. The project is divided into firm and conditional phases, with deliverables such as reports, drawings, and submission documents in French.

### Deliverables

- preliminary design studies
- environmental impact assessments
- technical reports
- geological and hydrogeological studies
- noise impact studies
- visibility analyses
- ecological inventories
- submission documents

### Required services

- transport engineering
- environmental consulting
- geotechnical studies
- noise impact assessment
- ecological studies

## Pelenoir assessment

This project is primarily a road infrastructure study contract focused on technical engineering and planning for the N54 missing link. It also includes significant environmental and [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) assessments, as well as [surveying](https://pelenoir.com/en/tenders-of-europe/disciplines/surveying/) and geomatics work to support the preliminary design and technical studies.

## How to take part

### Who can apply

- open to qualified service providers
- ESPD (European Single Procurement Document) required
- non-disclosure agreement (NDA) required

### What to submit

- completed ESPD form (French)
- technical and administrative documents in French
- electronic submission required
- signed submission report mandatory

### Award criteria

- price (see tender documents for details)

## Tender documents

The visible document package includes 128 files, primarily PDFs, DWG drawings, and Excel spreadsheets. The PDFs appear to contain environmental impact assessments (e.g., ecological inventories, noise studies), technical reports, and contractual documents related to the N54 road project. The DWG files likely represent topographic surveys and technical drawings of the proposed road section. Excel and Word files seem to include submission forms, templates, and administrative documents. The package also contains XML files for the ESPD submission. The exact content of individual files cannot be confirmed without access, but the filenames suggest a focus on preliminary studies and design documentation.

## Disciplines

- **Engineering** (primary, 60%): Technical design, transport engineering, geological and hydrogeological studies, visibility analyses, and preliminary road infrastructure planning for the N54 missing link.
- **Sustainability** (secondary, 25%): Environmental impact assessments, noise impact studies, ecological inventories, and sustainability considerations for the road infrastructure project.
- **Surveying** (secondary, 15%): Topographic surveys, geodata collection, and mapping for the preliminary design and technical studies of the N54 road section.

## Related projects

- [Wastewater sludge incineration and drying plant study in Wallonia](https://pelenoir.com/en/tenders-of-europe/projects/wastewater-sludge-incineration-and-drying-plant-study-in-wallonia-19188/) — Thumaide, Belgium · Service contract · deadline 2027-01-05 (38 days left to apply)
- [R8 Kortrijk-Kuurne-Harelbeke Redevelopment Framework Agreement](https://pelenoir.com/en/tenders-of-europe/projects/r8-kortrijk-kuurne-harelbeke-redevelopment-framework-agreement-18693/) — Kortrijk, Kuurne, Harelbeke, Belgium · Service contract · deadline 2026-12-14 (16 days left to apply)
- [ULB Collective Palace Technical Control Services](https://pelenoir.com/en/tenders-of-europe/projects/ulb-collective-palace-technical-control-services-19047/) — Brussels, Belgium · Service contract · deadline 2026-12-11 (13 days left to apply)
- [N34 Albert I laan redevelopment phase 2](https://pelenoir.com/en/tenders-of-europe/projects/n34-albert-i-laan-redevelopment-phase-2-16176/) — Nieuwpoort, Belgium · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Stability engineering and architecture for historic church](https://pelenoir.com/en/tenders-of-europe/projects/stability-engineering-and-architecture-for-historic-church-19335/) — Fontaine-l'Évêque, Belgium · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Waste2Emissions CO₂ capture and conditioning feasibility study](https://pelenoir.com/en/tenders-of-europe/projects/waste2emissions-co2-capture-and-conditioning-feasibility-study-18118/) — Thumaide, Belgium · Study · deadline 2026-11-30 (2 days left to apply)

## Source

Original notice on Belgian e-Procurement: https://www.publicprocurement.be/publication-workspaces/63a9f4ba-d8bb-4895-810b-8be303b3b248/general  
Original title: N54-Lobbes-Erquelinnes : Marchés d'études pour la réalisation du chaînon manquant

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/n54-lobbes-erquelinnes-missing-link-road-studies-18246/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
