---
title: "Motorway environmental and spatial coordination: expansion planning from Poysbrunn to the national border"
url: "https://pelenoir.com/en/tenders-of-europe/projects/motorway-environmental-and-spatial-coordination-expansion-planning-19304/"
id: 19304
country: "Austria"
client: "the contracting authority's contact"
type: "Service contract"
procedure: "Open procedure (Offenes Verfahren)"
deadline: "2026-12-14"
status: "open"
days_left: 16
status_as_of: "2026-11-28"
disciplines: ["Urban design and planning","Engineering","Sustainability"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-0aa67cce-9743-4893-bc49-6eb09862b27f"
updated: "2026-11-11"
publisher: "Pelenoir – Tenders of Europe"
---

# Motorway environmental and spatial coordination: expansion planning from Poysbrunn to the national border

> Coordination of spatial and environmental aspects for the full expansion of the A5 Nord/Weinviertel [motorway](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) between Poysbrunn and the national border during preliminary and final design phases (EP and BP).

**Status (2026-11-28):** 16 days left to apply — deadline 2026-12-14  
**Location:** Austria  
**Contracting authority:** the contracting authority's contact  
**Opportunity type:** Service contract — Open procedure (Offenes Verfahren)  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Coordination of spatial and environmental aspects for the full expansion of the A5 Nord/Weinviertel motorway between Poysbrunn and the national border during preliminary and final design phases (EP and BP). The contract includes an option for extended services.

## Scope of work

Coordination of spatial and environmental planning for the full expansion of the A5 Nord/Weinviertel motorway between Poysbrunn and the national border. Services include environmental and spatial coordination during preliminary (EP) and final design (BP) phases, with an option for extended services.

### Deliverables

- Coordination of spatial and environmental planning
- Integration of environmental impact assessments
- Support for preliminary and final design phases

### Required services

- [Architecture](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/), engineering and [consultancy services](https://pelenoir.com/en/tenders-of-europe/disciplines/consulting/)
- Environmental planning and coordination
- [Spatial planning](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) and integration

## Pelenoir assessment

This project primarily involves urban design and spatial planning for the expansion of a motorway, with a strong focus on coordinating environmental and spatial aspects. Secondary disciplines include engineering and technical planning for infrastructure design, as well as [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) and building performance to address environmental compliance and impact assessments.

## How to take part

### Who can apply

- Open to qualified service providers
- Submission of offers in German
- Electronic submission required via www.provia.at

### What to submit

- Offers must be submitted electronically
- Offers must remain valid for 3 months
- No financial security required

### Award criteria

- Price: evaluated based on the offered net total price
- Quality: evaluated based on the offered quality

## Tender documents

The visible files likely include tender documents such as contract conditions (e.g., 'A5 Nord VA_KRU_D.1.pdf'), environmental planning reports or guidelines (e.g., 'A5NordB_UVP2005_EVZ_EP_2005.pdf'), and technical drawings or plans related to the motorway expansion (e.g., 'A5NordB_UVP2005_Inhaltsverzeichnis_Gutachten.png'). There are also submission forms and templates (e.g., 'A5NordB_VA_KRU_D.5.1.xlsx') for structuring offers. The exact content of individual files cannot be confirmed without access, but the filenames suggest a focus on environmental and spatial coordination requirements.

## Disciplines

- **Urban design and planning** (primary, 60%): Coordination of spatial planning and integration for the motorway expansion, ensuring alignment with regional development goals, land-use policies, and public-realm considerations.
- **Engineering** (secondary, 30%): Technical engineering support for the motorway expansion, including infrastructure planning, civil engineering, and integration of environmental assessments into design phases.
- **Sustainability** (secondary, 10%): Integration of environmental impact assessments and sustainability considerations into the motorway expansion planning, ensuring compliance with environmental regulations and performance standards.

## Related projects

- [City centre pedestrian zone: street-level redesign and detailed planning](https://pelenoir.com/en/tenders-of-europe/projects/city-centre-pedestrian-zone-street-level-redesign-and-detailed-20319/) — Salzburg, Austria · Service contract · deadline 2026-12-11 (13 days left to apply)
- [Telfs Center Site Development](https://pelenoir.com/en/tenders-of-europe/projects/telfs-center-site-development-5362/) — Telfs, Austria · Service contract · deadline 2027-10-15 (321 days left to apply)
- [Mitte 15 / Westbahnhof Urban and Open Space Planning](https://pelenoir.com/en/tenders-of-europe/projects/mitte-15-westbahnhof-urban-and-open-space-planning-15593/) — Vienna, Austria · Design contest · deadline 2026-12-18 (20 days left to apply)
- [District heating plant: new biomass facility with 2,000 kW thermal output](https://pelenoir.com/en/tenders-of-europe/projects/district-heating-plant-new-biomass-facility-with-2-000-kw-thermal-20463/) — Weitra, Austria · Service contract · deadline 2026-12-21 (23 days left to apply)
- [Zoning decisions: 1,000 land-use permits for public and private projects in Sędziszów Małopolski](https://pelenoir.com/en/tenders-of-europe/projects/zoning-decisions-1-000-land-use-permits-for-public-and-private-20209/) — Sędziszów Małopolski, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Noise impact study for Marchfeld motorway western section](https://pelenoir.com/en/tenders-of-europe/projects/noise-impact-study-for-marchfeld-motorway-western-section-19299/) — Austria · Service contract · deadline 2026-12-07 (9 days left to apply)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-0aa67cce-9743-4893-bc49-6eb09862b27f  
Original title: A 5 Nord/Weinviertel Autobahn Vollausbau Poysbrunn bis Staatsgrenze - Koordination Raum und Umwelt EP und BP (Option)

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/motorway-environmental-and-spatial-coordination-expansion-planning-19304/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
