---
title: "Modernization of 27 pedestrian crossings to active crossings"
url: "https://pelenoir.com/en/tenders-of-europe/projects/modernization-of-27-pedestrian-crossings-to-active-crossings-13055/"
id: 13055
country: "Poland"
city: "Wałbrzych"
region: "Lower Silesia"
client: "Gmina Wałbrzych"
type: "Service contract"
procedure: "Basic procedure (art. 275 pkt 2 of the Polish Public Procurement Law)"
deadline: "2026-10-14"
status: "closed"
days_left: -45
status_as_of: "2026-11-28"
disciplines: ["Engineering","Urban design and planning","Sustainability"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df2065-0488-e852-647d-de0001bd80d5"
updated: "2026-10-02"
publisher: "Pelenoir – Tenders of Europe"
---

# Modernization of 27 pedestrian crossings to active crossings

> Preparation of design and cost documentation for the modernization of 27 pedestrian crossings to improve road safety, including obtaining required administrative decisions (building permits or construction work notifications) and providing authorial…

**Status (2026-11-28):** Closed 45 days ago — deadline 2026-10-14 11:00  
**Location:** Wałbrzych, Lower Silesia, Poland  
**Contracting authority:** Gmina Wałbrzych  
**Opportunity type:** Service contract — Basic procedure (art. 275 pkt 2 of the Polish Public Procurement Law)  
**CPV:** 71320000 Engineering design services; 71248000 Supervision of project and documentation  

## About the project

Preparation of design and cost documentation for the modernization of 27 pedestrian crossings to improve road safety, including obtaining required administrative decisions (building permits or construction work notifications) and providing authorial supervision. The project includes traffic calming measures, lighting, active safety elements, accessibility for disabled persons, and [renewable energy](https://pelenoir.com/en/tenders-of-europe/typologies/energy-and-utilities/) solutions.

## Scope of work

Preparation of design and cost documentation for the modernization of 27 pedestrian crossings, including traffic calming measures, lighting, active safety elements (e.g., LED reflective elements, motion sensors), accessibility solutions for disabled persons, and renewable energy sources. The project is divided into two stages: (I) preparation of design documentation and obtaining building permits or construction work notifications, and (II) authorial supervision during implementation. The contract duration is 48 months.

### Deliverables

- Design and cost documentation for 27 pedestrian crossings
- Building permit or construction work notification
- Authorial supervision documentation

### Required services

- [Engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) services (CPV 71320000-7)
- Project and documentation supervision (CPV 71248000-8)

## Pelenoir assessment

The project primarily involves engineering and technical planning for the modernization of pedestrian crossings, with a focus on road safety, accessibility, and technical design. [Urban design](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) and planning are also relevant due to the need for spatial integration and traffic calming measures. [Sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) aspects are present but represent a smaller share of the scope.

## How to take part

### Who can apply

- Execution of at least 2 similar design projects for pedestrian crossings with road safety infrastructure in the last 5 years
- Availability of qualified personnel: road design team leader (5+ years of experience), road design checker (3+ years), electrical design specialist (3+ years), electrical design checker (3+ years)
- Compliance with Polish construction law and professional certification requirements

### What to submit

- Offer in electronic form with qualified electronic signature or trusted signature
- Statements confirming lack of exclusion grounds (as per SWZ, Section VI.1)
- Documentation proving technical and professional capacity
- Power of attorney (if applicable)
- Proof of bid bond payment (if required)

### Award criteria

- Price (60% weight)
- Shortening of design documentation preparation time (40% weight, 5-20 days reduction)

## Disciplines

- **Engineering** (primary, 70%): Design and technical planning for the modernization of 27 pedestrian crossings, including traffic calming measures, lighting, active safety elements, accessibility solutions, and renewable energy integration. This also covers obtaining building permits or construction work notifications and providing authorial supervision during implementation.
- **Urban design and planning** (secondary, 20%): Urban design and spatial planning for the integration of pedestrian crossings into the existing road network, including traffic calming measures and public-realm improvements to enhance road safety and accessibility.
- **Sustainability** (secondary, 10%): Incorporation of renewable energy solutions and energy-efficient lighting systems into the pedestrian crossings to enhance sustainability and building performance.

## Related projects

- [Drainage concept for urban district with two road layout options](https://pelenoir.com/en/tenders-of-europe/projects/drainage-concept-for-urban-district-with-two-road-layout-options-20817/) — Poznań, Poland · Service contract · deadline 2026-12-18 (20 days left to apply)
- [External fire hydrant network with water tanks and pressure boosting systems at WAT](https://pelenoir.com/en/tenders-of-europe/projects/external-fire-hydrant-network-with-water-tanks-and-pressure-boosting-18443/) — Warsaw, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [County road expansion: 13 km of new design for safer rural travel](https://pelenoir.com/en/tenders-of-europe/projects/county-road-expansion-13-km-of-new-design-for-safer-rural-travel-19587/) — Ostrołęka, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Government office retrofit: deep energy upgrade for high-rise headquarters](https://pelenoir.com/en/tenders-of-europe/projects/government-office-retrofit-deep-energy-upgrade-for-high-rise-19558/) — Lublin, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Bike and pedestrian path: 430 m link along Żeromskiego Street](https://pelenoir.com/en/tenders-of-europe/projects/bike-and-pedestrian-path-430-m-link-along-zeromskiego-street-20413/) — Lębork, Poland · Service contract · deadline 2026-12-07 (9 days left to apply)
- [Gas installation design: retrofit or replacement in up to 170 municipal flats](https://pelenoir.com/en/tenders-of-europe/projects/gas-installation-design-retrofit-or-replacement-in-up-to-170-20675/) — Kraków, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df2065-0488-e852-647d-de0001bd80d5  
Original title: Wykonanie dokumentacji projektowo-kosztorysowej dla zadania pn.: „Modernizacja 27 przejść dla pieszych na aktywne” (II)

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/modernization-of-27-pedestrian-crossings-to-active-crossings-13055/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
