---
title: "Masterplan: campus architecture and technical coherence for 61,000 m² university site"
url: "https://pelenoir.com/en/tenders-of-europe/projects/masterplan-campus-architecture-and-technical-coherence-for-61-000-m2-20974/"
id: 20974
country: "France"
city: "Vandœuvre-lès-Nancy"
region: "Grand Est"
client: "Université de Lorraine"
type: "Service contract"
procedure: "Restricted procedure (procédure restreinte)"
deadline: "2027-01-18"
status: "open"
days_left: 51
status_as_of: "2026-11-28"
value: "EUR 2.5 m"
disciplines: ["Architecture","Engineering","Urban design and planning"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-113988"
updated: "2026-11-26"
publisher: "Pelenoir – Tenders of Europe"
---

# Masterplan: campus architecture and technical coherence for 61,000 m² university site

> A 61,000 m² campus [masterplan](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/): where architectural coherence meets daily student life.

**Status (2026-11-28):** 51 days left to apply — deadline 2027-01-18 14:00  
**Location:** Vandœuvre-lès-Nancy, Grand Est, France  
**Contracting authority:** Université de Lorraine  
**Opportunity type:** Service contract — Restricted procedure (procédure restreinte)  
**Declared value:** EUR 2.5 m  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

[Framework agreement](https://pelenoir.com/en/tenders-of-europe/types/framework-agreements/) for architectural and [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) services (maîtrise d’œuvre) to ensure technical and architectural coherence across multiple future works on the Aiguillettes campus in Vandœuvre-lès-Nancy and Villers-lès-Nancy. The campus is designated as '[Architecture](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) contemporaine remarquable' and represents approximately 61,000 m² of the University of Lorraine's estate.

## Why it matters

A 61,000 m² campus masterplan seeks architectural coherence across future works. A quiet framework for daily student life.

> The Aiguillettes campus masterplan brief demands technical and architectural coherence across 61,000 m² of future works.

This isn’t just about aesthetics. It’s a quiet framework for daily student life, forcing architects to balance unity with flexibility across multiple projects.

## Scope of work

Framework agreement for architectural and engineering design services (maîtrise d’œuvre) to maintain technical and architectural coherence across future works on the Aiguillettes campus. The campus is designated as 'Architecture contemporaine remarquable' and requires a consistent design approach over a six-year period.

### Deliverables

- architectural design proposals
- engineering design proposals
- technical coherence studies
- masterplan updates

### Required services

- architectural design
- engineering design
- urban and campus planning
- technical studies

## Pelenoir assessment

This project is a framework agreement for architectural and engineering design services aimed at maintaining technical and architectural coherence across a 61,000 m² [university campus](https://pelenoir.com/en/tenders-of-europe/typologies/schools-and-education/). The scope primarily supports architectural design and urban/campus planning, with a significant focus on engineering and technical studies to ensure consistency across future works.

## How to take part

### Who can apply

- open to qualified design and engineering firms
- framework limits participation to a shortlist of five operators

### What to submit

- participation request documents
- qualification evidence
- technical and professional references

### Award criteria

- social criteria
- environmental criteria

## Disciplines

- **Architecture** (primary, 50%): Architectural design proposals and ensuring architectural coherence across the 61,000 m² university campus, including conceptual and detailed design for future works.
- **Engineering** (secondary, 30%): Engineering design proposals and technical coherence studies, including structural, civil, and building-services engineering for campus works.
- **Urban design and planning** (secondary, 20%): Masterplan updates and urban/campus planning to maintain spatial and functional coherence across the university site.

## Related projects

- [Extension of Hochfelden sports complex](https://pelenoir.com/en/tenders-of-europe/projects/extension-of-hochfelden-sports-complex-18431/) — Hochfelden, France · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Restructuring of the north wing of Lacaze-Duthiers building at Roscoff Biological Station](https://pelenoir.com/en/tenders-of-europe/projects/restructuring-of-the-north-wing-of-lacaze-duthiers-building-at-13250/) — Roscoff, France · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Six new social housing units in a city street](https://pelenoir.com/en/tenders-of-europe/projects/six-new-social-housing-units-in-a-city-street-20977/) — Mulhouse, France · Service contract · deadline 2027-01-08 (41 days left to apply)
- [New municipal workshop and football clubhouse building](https://pelenoir.com/en/tenders-of-europe/projects/new-municipal-workshop-and-football-clubhouse-building-19743/) — Luzillat, France · Service contract · deadline 2027-01-05 (38 days left to apply)
- [Office renovation: full design services for a social security headquarters](https://pelenoir.com/en/tenders-of-europe/projects/office-renovation-full-design-services-for-a-social-security-19941/) — Bobigny, France · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Access control system replacement for Metz courthouse](https://pelenoir.com/en/tenders-of-europe/projects/access-control-system-replacement-for-metz-courthouse-20205/) — Metz, France · Service contract · deadline 2026-12-14 (16 days left to apply)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-113988  
Original title: Accord cadre portant sur des missions de Maîtrise d’œuvre pour les travaux situés sur le campus AIGUILLETTES à Vandœuvre-lès-Nancy (54) et Villers-lès-Nancy (54)

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/masterplan-campus-architecture-and-technical-coherence-for-61-000-m2-20974/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
