---
title: "La Ville Dieu du Temple wastewater treatment plant design"
url: "https://pelenoir.com/en/tenders-of-europe/projects/la-ville-dieu-du-temple-wastewater-treatment-plant-design-10027/"
id: 10027
country: "France"
city: "La Ville Dieu du Temple"
region: "Occitanie"
client: "Syndicat Mixte Eaux Confluences"
type: "Service contract"
procedure: "Open procedure (Procédure Ouverte)"
deadline: "2026-10-09"
status: "closed"
days_left: -51
status_as_of: "2026-11-29"
disciplines: ["Engineering","Project and construction management"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-87026"
updated: "2026-09-08"
publisher: "Pelenoir – Tenders of Europe"
---

# La Ville Dieu du Temple wastewater treatment plant design

> Design and [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) services for the construction of a new [wastewater treatment](https://pelenoir.com/en/tenders-of-europe/typologies/water-and-environment/) plant in La Ville Dieu du Temple.

**Status (2026-11-29):** Closed 51 days ago — deadline 2026-10-09 12:00  
**Location:** La Ville Dieu du Temple, Occitanie, France  
**Contracting authority:** Syndicat Mixte Eaux Confluences  
**Opportunity type:** Service contract — Open procedure (Procédure Ouverte)  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Design and project management services for the construction of a new wastewater treatment plant in La Ville Dieu du Temple.

## Scope of work

Design and project management (maîtrise d'oeuvre) for a new wastewater treatment plant, including technical studies, planning, and construction supervision over 36 months.

### Deliverables

- Design studies and technical documentation for the wastewater treatment plant
- Project management and construction supervision

### Required services

- Design (maîtrise d'oeuvre)
- Technical studies
- Construction supervision

## Pelenoir assessment

This project primarily involves the design and technical planning of a wastewater treatment plant, with a significant focus on engineering and technical studies. Additionally, project management and construction supervision are required, reflecting a secondary but essential role in ensuring the project's successful delivery.

## How to take part

### Who can apply

- Candidates may submit a European Single Procurement Document (DUME) instead of DC1 and DC2 forms
- For consortia, each member must provide a completed DUME form
- Proof of financial capacity (turnover statements for the last three years, bank declarations, or professional risk insurance)
- Proof of technical capacity (list of principal deliveries/services in the last three years, professional qualifications of key personnel, quality control certificates or equivalent)

### What to submit

- Offers must be submitted electronically
- European Single Procurement Document (DUME) accepted in lieu of DC1 and DC2 forms

### Award criteria

- Price - 45%
- Technical value - 55%

## Disciplines

- **Engineering** (primary, 70%): Structural, civil, and technical engineering for the wastewater treatment plant, including process design, infrastructure planning, and technical studies to ensure functional and regulatory compliance.
- **Project and construction management** (secondary, 30%): Project management and construction supervision over the 36-month duration, ensuring coordination, compliance, and delivery of the wastewater treatment plant.

## Related projects

- [Reconstruction of Sully Bridge in Paris](https://pelenoir.com/en/tenders-of-europe/projects/reconstruction-of-sully-bridge-in-paris-15918/) — Paris, France · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Technical client assistance for structural consolidation of a high school in Paris](https://pelenoir.com/en/tenders-of-europe/projects/technical-client-assistance-for-structural-consolidation-of-a-high-19332/) — Paris, France · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Les Deux Alpes multi-discipline engineering services framework](https://pelenoir.com/en/tenders-of-europe/projects/les-deux-alpes-multi-discipline-engineering-services-framework-18688/) — Les Deux Alpes, France · Service contract · deadline 2026-12-10 (11 days left to apply)
- [Rénovation and compliance of elevators at Paris-Seine-Saint-Denis University Hospitals - Phase 3](https://pelenoir.com/en/tenders-of-europe/projects/renovation-and-compliance-of-elevators-at-paris-seine-saint-denis-18691/) — Bobigny, France · Service contract · deadline 2026-12-15 (16 days left to apply)
- [La Brosse-Montceaux drinking water treatment plant](https://pelenoir.com/en/tenders-of-europe/projects/la-brosse-montceaux-drinking-water-treatment-plant-17255/) — La Brosse-Montceaux, France · Service contract · deadline 2026-12-18 (19 days left to apply)
- [Framework agreement for water and wastewater engineering services](https://pelenoir.com/en/tenders-of-europe/projects/framework-agreement-for-water-and-wastewater-engineering-services-15920/) — Quimperlé, France · Service contract · deadline 2026-11-30 (closes tomorrow)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-87026  
Original title: Maîtrise d'oeuvre pour la station d'épuration de La Ville Dieu du Temple

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/la-ville-dieu-du-temple-wastewater-treatment-plant-design-10027/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
