---
title: "Hospital expansion: multi-trade supervision for rehabilitation day unit modernisation"
url: "https://pelenoir.com/en/tenders-of-europe/projects/hospital-expansion-multi-trade-supervision-for-rehabilitation-day-20814/"
id: 20814
country: "Poland"
city: "Poznań"
region: "Wielkopolskie"
client: "ORTOPEDYCZNO-REHABILITACYJNY SZPITAL KLINICZNY IM. WIKTORA DEGI UNIWERSYTETU MEDYCZNEGO IM. KAROLA MARCINKOWSKIEGO W POZNANIU"
type: "Service contract"
procedure: "Basic procedure (art. 275 pkt 1 ustawy)"
deadline: "2026-12-04"
status: "closing"
days_left: 6
status_as_of: "2026-11-28"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df4a2c-f5bf-8a50-9ef4-5c0001e7dc20"
updated: "2026-11-24"
publisher: "Pelenoir – Tenders of Europe"
---

# Hospital expansion: multi-trade supervision for rehabilitation day unit modernisation

> [Hospital](https://pelenoir.com/en/tenders-of-europe/typologies/healthcare/) supervision: where operational continuity meets construction execution.

**Status (2026-11-28):** 6 days left to apply — deadline 2026-12-04 09:00  
**Location:** Poznań, Wielkopolskie, Poland  
**Contracting authority:** ORTOPEDYCZNO-REHABILITACYJNY SZPITAL KLINICZNY IM. WIKTORA DEGI UNIWERSYTETU MEDYCZNEGO IM. KAROLA MARCINKOWSKIEGO W POZNANIU  
**Opportunity type:** Service contract — Basic procedure (art. 275 pkt 1 ustawy)  
**CPV:** 71247000 Supervision of building work; 71520000 Construction supervision services  

## About the project

Multi-discipline investor supervision services for the expansion of a hospital through the modernisation of its Day Rehabilitation Unit building. The project is part of a regional EU-funded programme to strengthen healthcare infrastructure.

## Why it matters

Hospital supervision aligns construction execution with operational continuity during a Day Rehabilitation Unit modernisation.

## Scope of work

Multi-discipline investor supervision services for the modernisation of a hospital's Day Rehabilitation Unit building. The supervision team must include qualified inspectors in structural, sanitary, electrical and telecommunication disciplines, each with at least 10 years of experience and a track record of supervising projects worth at least PLN 10 million. The contract includes an option for an additional 3-month extension.

### Deliverables

- Multi-discipline investor supervision services
- Compliance with Polish construction law and EU-funded project requirements

### Required services

- [Construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (structural, sanitary, electrical, telecommunication)

## Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as it involves multi-discipline investor supervision for the modernisation of a hospital's Day Rehabilitation Unit. The scope is limited to oversight and coordination of construction activities, without evidence of direct [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/), engineering, or other AEC disciplines in the visible tender facts.

## How to take part

### Who can apply

- At least one service of multi-discipline investor supervision for a construction project worth at least PLN 10 million in the last 5 years
- At least one service of multi-discipline investor supervision for a [listed building](https://pelenoir.com/en/tenders-of-europe/typologies/culture-and-heritage/) or a building in a conservation area (if applicable)
- Team must include at least one qualified inspector for each discipline: structural, sanitary, electrical and telecommunication, each with 10+ years of experience and a track record of supervising two projects worth at least PLN 10 million each
- Submission of personnel list with qualifications, experience and scope of work
- Submission of reference list for past supervision services
- Compliance with Polish construction law and EU-funded project requirements

### What to submit

- Offer in Polish, using standard formats (.pdf, .doc, .docx, .xlsx, .xml, .rtf, .xps, .odt)
- Electronic submission via the procurement platform the original notice with qualified electronic signature, trusted signature or personal signature
- Maximum 10 files or compressed folders, total size up to 150 MB
- Compressed folders (.zip, .7Z) without passwords or encryption
- Personnel list with qualifications, experience and scope of work (recommended template in SWZ)
- Reference list for past supervision services (recommended template in SWZ)

### Award criteria

- Price (60% weight)
- Additional experience of the team coordinator (40% weight)

## Disciplines

- **Project and construction management** (primary, 100%): Multi-discipline investor supervision services for the modernisation of the hospital's Day Rehabilitation Unit, ensuring compliance with Polish construction law, EU-funded project requirements, and coordination across structural, sanitary, electrical, and telecommunication disciplines.

## Related projects

- [Town hall energy retrofit: historic building upgraded with insulation and systems overhaul](https://pelenoir.com/en/tenders-of-europe/projects/town-hall-energy-retrofit-historic-building-upgraded-with-insulation-20662/) — Reszel, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Riverside promenade: construction supervision for Nida riverfront revitalisation](https://pelenoir.com/en/tenders-of-europe/projects/riverside-promenade-construction-supervision-for-nida-riverfront-21402/) — Pińczów, Poland · Service contract · deadline 2026-12-09 (11 days left to apply)
- [Road maintenance depot refurbishment: redesign and rebuild of a regional road agency facility](https://pelenoir.com/en/tenders-of-europe/projects/road-maintenance-depot-refurbishment-redesign-and-rebuild-of-a-20999/) — Kock, Poland · Service contract · deadline 2026-12-04 (6 days left to apply)
- [Primary school thermal upgrade: expert supervision for energy-efficient retrofit](https://pelenoir.com/en/tenders-of-europe/projects/primary-school-thermal-upgrade-expert-supervision-for-energy-21205/) — Zgorzelec, Poland · Service contract · deadline 2026-12-04 (6 days left to apply)
- [Historic preservation: multi-discipline construction supervision for Auschwitz I memorial block renovation](https://pelenoir.com/en/tenders-of-europe/projects/historic-preservation-multi-discipline-construction-supervision-for-19561/) — Oświęcim, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Hydrotechnical supervision: water retention development for a rural municipality](https://pelenoir.com/en/tenders-of-europe/projects/hydrotechnical-supervision-water-retention-development-for-a-rural-21221/) — Świątniki Górne, Poland · Service contract · deadline 2026-12-04 (6 days left to apply)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df4a2c-f5bf-8a50-9ef4-5c0001e7dc20  
Original title: „Pełnienie wielobranżowego nadzoru inwestorskiego nad realizacją zadania inwestycyjnego pn. Rozbudowa Szpitala poprzez modernizację budynku Oddziału Dziennego Pobytu – Rehabilitacyjnego

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/hospital-expansion-multi-trade-supervision-for-rehabilitation-day-20814/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
