---
title: "Helsinki-Riihimäki railway capacity expansion phase 2"
url: "https://pelenoir.com/en/tenders-of-europe/projects/helsinki-riihimaki-railway-capacity-expansion-phase-2-18190/"
id: 18190
country: "Finland"
city: "Helsinki"
region: "Uusimaa"
client: "Väylävirasto"
type: "Service contract"
procedure: "open procedure"
deadline: "2026-11-18"
status: "closed"
days_left: -11
status_as_of: "2026-11-29"
value: "EUR 10 m"
disciplines: ["Project and construction management","Engineering"]
source: "HILMA"
source_url: "https://www.hankintailmoitukset.fi/en/public/procedure/38590/enotice/61373/"
updated: "2026-11-08"
publisher: "Pelenoir – Tenders of Europe"
---

# Helsinki-Riihimäki railway capacity expansion phase 2

> Modifying bridges, track structures, and electrification during execution. How [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) keeps a [railway](https://pelenoir.com/en/tenders-of-europe/typologies/rail-and-public-transport/) running.

**Status (2026-11-29):** Closed 11 days ago — deadline 2026-11-18 10:00  
**Location:** Helsinki, Uusimaa, Finland  
**Contracting authority:** Väylävirasto  
**Opportunity type:** Service contract — open procedure  
**Declared value:** EUR 10 m  
**CPV:** 71530000 Construction consultancy services  

## About the project

Expansion of railway capacity on the Helsinki-Riihimäki line, including construction of a new freight track, modifications to bridges and track structures, signaling and electrification systems, and noise mitigation measures. Additional services include construction management, supervision of railway works, and specialized roles such as safety coordination, environmental coordination, and project engineering.

## Why it matters

Construction management for railway capacity expansion oversees bridges, signaling, and noise mitigation. Keeping daily operations running during upgrades.

## Scope of work

Procurement of construction management and supervision services for the expansion of railway capacity on the Helsinki-Riihimäki line. Services include construction management, supervision of railway works (e.g., signaling, electrification, track structures), safety and environmental coordination, project engineering, and related roles. The contract is a [framework agreement](https://pelenoir.com/en/tenders-of-europe/types/framework-agreements/) with an estimated annual value of EUR 1.5 million and a total estimated value of EUR 10 million over four years, with four additional optional years.

### Deliverables

- construction management services
- supervision of railway works
- safety coordination
- environmental coordination
- project engineering and assistance

### Required services

- construction management
- supervision of signaling systems
- supervision of electrification works
- supervision of track structures
- safety coordination
- environmental coordination
- project engineering

## Pelenoir assessment

This project primarily involves procurement of construction management and supervision services for a railway capacity expansion, including oversight of engineering works. While the core focus is on project and construction management, the scope also includes technical engineering tasks related to railway infrastructure modifications, justifying a secondary classification in engineering and technical planning.

## How to take part

### Who can apply

- open to qualified service providers under Finnish public procurement law
- submission of required procurement documents (e.g., ESPD)
- compliance with Finnish public procurement regulations

### What to submit

- tender submission via specified electronic platform
- completed tender documents as outlined in the tender request materials
- price comparison form (Liite 5 B1)

### Award criteria

- Lowest price (vertailuhinta) as the primary award criterion

## Disciplines

- **Project and construction management** (primary, 70%): Construction management, supervision of railway works (e.g., signaling, electrification, track structures), safety and environmental coordination, and project engineering for the Helsinki-Riihimäki railway capacity expansion.
- **Engineering** (secondary, 30%): Technical engineering and planning for modifications to bridges, track structures, signaling systems, electrification, and noise mitigation measures.

## Related projects

- [Site supervision expert services for public construction projects 2027–2030](https://pelenoir.com/en/tenders-of-europe/projects/site-supervision-expert-services-for-public-construction-projects-20560/) — Jyväskylä, Finland · Service contract · deadline 2027-01-05 (37 days left to apply)
- [Vt 9 Tampere-Orivesi Phase 1 Construction Management and Supervision](https://pelenoir.com/en/tenders-of-europe/projects/vt-9-tampere-orivesi-phase-1-construction-management-and-supervision-18192/) — Tampere, Finland · Service contract · deadline 2026-12-07 (8 days left to apply)
- [Demolition planning and supervision for eight buildings in Kirkkonummi](https://pelenoir.com/en/tenders-of-europe/projects/demolition-planning-and-supervision-for-eight-buildings-in-kirkkonummi-19775/) — Kirkkonummi, Finland · Service contract · deadline 2026-11-30 (closes tomorrow)
- [Camp centre construction management and building works supervision](https://pelenoir.com/en/tenders-of-europe/projects/camp-centre-construction-management-and-building-works-supervision-19206/) — Joensuu, Finland · Service contract · deadline 2026-12-07 (8 days left to apply)
- [Construction supervision for a camp centre renovation](https://pelenoir.com/en/tenders-of-europe/projects/construction-supervision-for-a-camp-centre-renovation-19205/) — Joensuu, Finland · Service contract · deadline 2026-12-07 (8 days left to apply)
- [Upgrade of Highway 8 in Kokkola city center](https://pelenoir.com/en/tenders-of-europe/projects/upgrade-of-highway-8-in-kokkola-city-center-17441/) — Kokkola, Finland · Service contract · deadline 2026-12-09 (10 days left to apply)

## Source

Original notice on HILMA: https://www.hankintailmoitukset.fi/en/public/procedure/38590/enotice/61373/  
Original title: Helsinki-Riihimäki kapasiteetin lisääminen, 2. vaiheen rakennuttamis- ja valvontapalvelut, lisähankinta

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/helsinki-riihimaki-railway-capacity-expansion-phase-2-18190/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
