---
title: "Gevrey-Chambertin Water and Sanitation Framework Mastery"
url: "https://pelenoir.com/en/tenders-of-europe/projects/gevrey-chambertin-water-and-sanitation-framework-mastery-9939/"
id: 9939
country: "France"
city: "Nuits-Saint-Georges"
region: "Bourgogne-Franche-Comté"
client: "Communauté de Communes de Gevrey Chambertin (21)"
type: "Service contract"
procedure: "Open procedure (Procédure Ouverte)"
deadline: "2026-10-30"
status: "closed"
days_left: -29
status_as_of: "2026-11-28"
value: "EUR 1.3 m"
disciplines: ["Engineering","Project and construction management"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-93341"
updated: "2026-09-29"
publisher: "Pelenoir – Tenders of Europe"
---

# Gevrey-Chambertin Water and Sanitation Framework Mastery

> Recruitment of a [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) team (maîtrise d’œuvre) for the implementation of a [drinking water](https://pelenoir.com/en/tenders-of-europe/typologies/water-and-environment/) supply [master plan](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) and urgent sanitation works in the Gevrey-Chambertin area.

**Status (2026-11-28):** Closed 29 days ago — deadline 2026-10-30 11:00  
**Location:** Nuits-Saint-Georges, Bourgogne-Franche-Comté, France  
**Contracting authority:** Communauté de Communes de Gevrey Chambertin (21)  
**Opportunity type:** Service contract — Open procedure (Procédure Ouverte)  
**Declared value:** EUR 1.3 m  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Recruitment of a project management team (maîtrise d’œuvre) for the implementation of a drinking water supply master plan and urgent sanitation works in the Gevrey-Chambertin area.

## Scope of work

[Framework agreement](https://pelenoir.com/en/tenders-of-europe/types/framework-agreements/) for project management services (maîtrise d’œuvre) to implement a drinking water supply master plan and execute urgent sanitation works. The contract includes design, supervision, and coordination of construction activities.

### Deliverables

- Project management services for water and sanitation infrastructure
- Implementation of a drinking water supply master plan (Schéma Directeur d’Alimentation en Eau Potable)
- Supervision of urgent sanitation works

### Required services

- project management (maîtrise d’œuvre)
- design and planning
- construction supervision
- coordination of water and sanitation infrastructure works

## Pelenoir assessment

This project primarily involves engineering and technical planning for water and sanitation infrastructure, including the implementation of a drinking water supply master plan and urgent sanitation works. Additionally, it includes project and construction management services for supervision and coordination of the construction activities.

## How to take part

### Who can apply

- Compliance with exclusion grounds as per procurement documents
- No specific legal form required (CompanyLegalFormCode: false)
- Electronic invoicing (eInvoicing) required

### What to submit

- Submission via electronic means (esubmission: required)
- Compliance with procurement documents and selection criteria

### Award criteria

- Price (50% weight)
- Technical value (40% weight)
- Environmental measures (10% weight)

## Disciplines

- **Engineering** (primary, 70%): Design, planning, and technical engineering for drinking water supply infrastructure and sanitation works, including the implementation of a water supply master plan and supervision of urgent sanitation projects.
- **Project and construction management** (secondary, 30%): Coordination, supervision, and management of construction activities for water and sanitation infrastructure, ensuring compliance with project timelines and quality standards.

## Related projects

- [Reconstruction of Sully Bridge in Paris](https://pelenoir.com/en/tenders-of-europe/projects/reconstruction-of-sully-bridge-in-paris-15918/) — Paris, France · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Replacement of air handling units at Université de Lille Pont de Bois Campus](https://pelenoir.com/en/tenders-of-europe/projects/replacement-of-air-handling-units-at-universite-de-lille-pont-de-bois-18430/) — Villeneuve d'Ascq, France · Service contract · deadline 2026-12-17 (19 days left to apply)
- [Les Deux Alpes multi-discipline engineering services framework](https://pelenoir.com/en/tenders-of-europe/projects/les-deux-alpes-multi-discipline-engineering-services-framework-18688/) — Les Deux Alpes, France · Service contract · deadline 2026-12-10 (12 days left to apply)
- [Road tunnel safety upgrade: existing tunnel widening or new build on RN5](https://pelenoir.com/en/tenders-of-europe/projects/road-tunnel-safety-upgrade-existing-tunnel-widening-or-new-build-on-19186/) — Cilaos, France · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Solar power for public buildings: expanding rooftop and canopy photovoltaic installations](https://pelenoir.com/en/tenders-of-europe/projects/solar-power-for-public-buildings-expanding-rooftop-and-canopy-19744/) — Nîmes, France · Service contract · deadline 2026-12-15 (17 days left to apply)
- [Reconstruction of Rochelets wastewater treatment plant](https://pelenoir.com/en/tenders-of-europe/projects/reconstruction-of-rochelets-wastewater-treatment-plant-18245/) — Saint-Brevin-les-Pins, France · Service contract · deadline 2026-12-11 (13 days left to apply)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-93341  
Original title: Accord-cadre relatif à la maitrise d’œuvre pour les travaux d’eau potable et d’assainissement collectif

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/gevrey-chambertin-water-and-sanitation-framework-mastery-9939/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
