---
title: "Freim–Djupvik Road Widening"
url: "https://pelenoir.com/en/tenders-of-europe/projects/freimdjupvik-road-widening-9625/"
id: 9625
country: "Norway"
region: "Vestland"
client: "Nye Veier AS"
type: "Design and build"
procedure: "Open procedure (Åpen)"
deadline: "2027-10-15"
status: "open"
days_left: 321
status_as_of: "2026-11-28"
value: "NOK 40 m (≈ EUR 3.7 m)"
disciplines: ["Engineering","Construction and contracting","Specialist consulting"]
source: "Doffin"
source_url: "https://www.doffin.no/notices/2026-114833"
updated: "2026-09-22"
publisher: "Pelenoir – Tenders of Europe"
---

# Freim–Djupvik Road Widening

> Widening of approximately 550 meters of existing road (Rv.13) from 6.5 meters width, including avalanche protection for 150 meters and retaining most of the current road structure.

**Status (2026-11-28):** 321 days left to apply — deadline 2027-10-15  
**Location:** Vestland, Norway  
**Contracting authority:** Nye Veier AS  
**Opportunity type:** Design and build — Open procedure (Åpen)  
**Declared value:** NOK 40 m (≈ EUR 3.7 m)  
**CPV:** 45000000 Construction work; 45220000; 45200000 Works for complete or part construction and civil engineering work; 45223000; 45233100; 45233000; 45230000; 45422000  

## About the project

Widening of approximately 550 meters of existing road (Rv.13) from 6.5 meters width, including avalanche protection for 150 meters and retaining most of the current road structure. The project involves both design and construction under a turnkey contract.

## Scope of work

Turnkey contract for design and construction of road widening, including avalanche protection and traffic management during construction. The project requires engineering, construction, and environmental mitigation services.

### Deliverables

- Widened road section (6.5 meters)
- Avalanche protection for 150 meters
- Retained existing road structure
- Traffic management solutions during construction

### Required services

- [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- construction
- geotechnical services
- environmental consulting
- traffic management planning

## Pelenoir assessment

This project is primarily a civil infrastructure initiative focused on road widening, avalanche protection, and traffic management. The scope is dominated by engineering and technical planning, with significant construction work under a turnkey contract. Environmental consulting is also required but represents a smaller share of the project scope.

## How to take part

### Award criteria

- Price (Tilbudssum)
- Plan for implementation (Plan for gjennomføring)
- Reduction of greenhouse gas emissions (Reduksjon av klimagassutslipp)

## Disciplines

- **Engineering** (primary, 60%): Structural, civil, and geotechnical engineering design for road widening, avalanche protection, and retaining existing road structures. Includes technical planning for traffic management during construction.
- **Construction and contracting** (secondary, 30%): Physical construction of the widened road section, avalanche protection, and implementation of traffic management solutions during construction.
- **Specialist consulting** (secondary, 10%): Environmental consulting and mitigation measures to address project-specific challenges, such as avalanche protection and traffic management.

## Related projects

- [Bærum Municipality RIV Engineering Services Framework](https://pelenoir.com/en/tenders-of-europe/projects/baerum-municipality-riv-engineering-services-framework-17434/) — Sandvika, Norway · Framework agreement · deadline 2026-12-03 (5 days left to apply)
- [Verftsbrua Bridge Expansion Pre-Project](https://pelenoir.com/en/tenders-of-europe/projects/verftsbrua-bridge-expansion-pre-project-9894/) — Trondheim, Norway · Service contract · deadline 2027-02-12 (76 days left to apply)
- [Feasibility study: raising a WWII submarine wreck with hazardous cargo](https://pelenoir.com/en/tenders-of-europe/projects/feasibility-study-raising-a-wwii-submarine-wreck-with-hazardous-cargo-19425/) — Norway · Study · deadline 2026-12-18 (20 days left to apply)
- [Stabilization of rock cutting at Moen Verft, Sandøra](https://pelenoir.com/en/tenders-of-europe/projects/stabilization-of-rock-cutting-at-moen-verft-sandora-18115/) — Skjervøy, Norway · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Framework agreement for structural engineering, building physics and acoustics consultancy](https://pelenoir.com/en/tenders-of-europe/projects/framework-agreement-for-structural-engineering-building-physics-and-19933/) — Sandvika, Norway · Framework agreement · deadline 2026-12-21 (23 days left to apply)
- [Kvinesdal Water and Wastewater Master Plan Update](https://pelenoir.com/en/tenders-of-europe/projects/kvinesdal-water-and-wastewater-master-plan-update-17243/) — Kvinesdal, Norway · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on Doffin: https://www.doffin.no/notices/2026-114833  
Original title: Rv.13 Freim - Djupvik

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/freimdjupvik-road-widening-9625/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
