---
title: "Fløysbonn Secondary School Construction and Demolition"
url: "https://pelenoir.com/en/tenders-of-europe/projects/floysbonn-secondary-school-construction-and-demolition-17247/"
id: 17247
country: "Norway"
city: "Ski"
region: "Akershus"
client: "NORDRE FOLLO KOMMUNE"
type: "Works contract"
procedure: "Open procedure (åpen)"
deadline: "2026-12-21"
status: "open"
days_left: 22
status_as_of: "2026-11-29"
value: "NOK 400 m (≈ EUR 37.3 m)"
disciplines: ["Architecture","Engineering","Construction and contracting","Landscape architecture"]
source: "Doffin"
source_url: "https://www.doffin.no/notices/2026-117091"
updated: "2026-11-03"
publisher: "Pelenoir – Tenders of Europe"
---

# Fløysbonn Secondary School Construction and Demolition

> Construction of a new 8-parallel [secondary school](https://pelenoir.com/en/tenders-of-europe/typologies/schools-and-education/) with capacity for approximately 720 students and 90 staff, including demolition of the existing 1970s Fløysbonn secondary school, site preparation, infrastructure, and [landscaping](https://pelenoir.com/en/tenders-of-europe/disciplines/landscape-architecture/).

**Status (2026-11-29):** 22 days left to apply — deadline 2026-12-21 11:00  
**Location:** Ski, Akershus, Norway  
**Contracting authority:** NORDRE FOLLO KOMMUNE  
**Opportunity type:** Works contract — Open procedure (åpen)  
**Declared value:** NOK 400 m (≈ EUR 37.3 m)  
**CPV:** 45000000 Construction work; 45214200; 71240000 Architectural, engineering and planning services; 45200000 Works for complete or part construction and civil engineering work; 45210000 Building construction work; 45214000; 71000000 Architectural, construction, engineering and inspection services; 71200000 Architectural and related services  

## About the project

Construction of a new 8-parallel secondary school with capacity for approximately 720 students and 90 staff, including demolition of the existing 1970s Fløysbonn secondary school, site preparation, infrastructure, and landscaping. The project also involves building a new access road to Sofiemyrhallen and ensuring operational continuity of existing facilities during construction.

## Scope of work

Construction of a new 8,500 m² secondary school with three wings and central communication areas, demolition of the existing school, site infrastructure including a new access road, parking areas, stormwater management, and landscaping. The project includes optional works such as energy central upgrades, ventilation systems, solar panels, and low-carbon concrete.

### Deliverables

- New 8,500 m² secondary school building
- Demolition of existing Fløysbonn secondary school
- New access road to Sofiemyrhallen
- Parking areas and infrastructure
- Stormwater management systems
- Landscaping and outdoor areas
- Optional works: energy central, ventilation systems, solar panels, low-carbon concrete

### Required services

- [Construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/)
- Architectural and [engineering services](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- Planning services
- Demolition works
- Site preparation and infrastructure

## Pelenoir assessment

This project primarily involves the [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) and engineering of a new secondary school, alongside significant construction and demolition works. The scope also includes landscape architecture for outdoor areas and site infrastructure. The project is classified as a construction works procurement with a strong emphasis on architectural and technical planning, supported by the explicit mention of design, engineering, and landscaping deliverables.

## How to take part

### Who can apply

- Registration in a trade or commercial register
- Minimum average annual turnover of NOK 700,000,000 for the last 3 years
- Bankruptcy rating equivalent to A (low risk) or better from Proff Forvalt
- Experience from comparable school construction projects (2 references required)
- ISO 9001:2015 quality management certification
- ISO 14001:2015 or EMAS environmental management certification
- Compliance with Norwegian public procurement regulations

### What to submit

- Completed V05 price form
- Completed V07 CV form for 4 key personnel (Project Leader, Construction Leader, Design Group Leader, ITB Coordinator)
- Completed V08 reference questionnaire for both reference projects
- Documentation of trade register enrollment
- Financial statements for the last 3 years
- Evidence of quality and environmental management certifications

### Award criteria

- Price (70% weight)
- Competence and experience of key personnel (30% weight)

## Disciplines

- **Architecture** (primary, 40%): Architectural design of the new 8,500 m² secondary school building, including conceptual and detailed design for the three wings and central communication areas, as well as coordination with engineering disciplines.
- **Engineering** (secondary, 30%): Structural, civil, and building-services engineering for the new school, including infrastructure such as stormwater management, energy central upgrades, ventilation systems, and low-carbon concrete specifications.
- **Construction and contracting** (secondary, 20%): Physical construction of the new school building, demolition of the existing school, site preparation, and execution of infrastructure works such as the new access road and parking areas.
- **Landscape architecture** (secondary, 10%): Design and implementation of outdoor areas, landscaping, and integration of the new school building with its surroundings, including stormwater management and site aesthetics.

## Related projects

- [Residential care centre for young adults with severe autism and disabilities](https://pelenoir.com/en/tenders-of-europe/projects/residential-care-centre-for-young-adults-with-severe-autism-and-19548/) — Bergen, Norway · Works contract · deadline 2027-01-15 (47 days left to apply)
- [New secondary school for 720 pupils with demolition of existing school](https://pelenoir.com/en/tenders-of-europe/projects/new-secondary-school-for-720-pupils-with-demolition-of-existing-school-19939/) — Ski, Norway · Works contract · deadline 2027-01-15 (47 days left to apply)
- [Trondheim Municipality Framework Agreements for Consultancy Services 2027-2029](https://pelenoir.com/en/tenders-of-europe/projects/trondheim-municipality-framework-agreements-for-consultancy-services-17643/) — Trondheim, Norway · Framework agreement · deadline 2026-12-14 (15 days left to apply)
- [Municipal operations centre: renovation and modernisation for staff and services](https://pelenoir.com/en/tenders-of-europe/projects/municipal-operations-centre-renovation-and-modernisation-for-staff-20651/) — Ringebu, Norway · Service contract · deadline 2027-01-29 (61 days left to apply)
- [Heritage church planning: feasibility study for three historic churches](https://pelenoir.com/en/tenders-of-europe/projects/heritage-church-planning-feasibility-study-for-three-historic-churches-19328/) — Norway · Service contract · deadline 2026-12-03 (4 days left to apply)
- [Framework agreements for building and construction engineering consultancy in Rødøy](https://pelenoir.com/en/tenders-of-europe/projects/framework-agreements-for-building-and-construction-engineering-19935/) — Vågaholmen, Norway · Framework agreement · deadline 2026-12-21 (22 days left to apply)

## Source

Original notice on Doffin: https://www.doffin.no/notices/2026-117091  
Original title: Fløysbonn ungdomsskole

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/floysbonn-secondary-school-construction-and-demolition-17247/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
