---
title: "Expansion of Wodzisław Śląski Interchange Hub"
url: "https://pelenoir.com/en/tenders-of-europe/projects/expansion-of-wodzislaw-slaski-interchange-hub-13041/"
id: 13041
country: "Poland"
city: "Wodzisław Śląski"
region: "Śląskie"
client: "Miasto Wodzisław Śląski"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)"
deadline: "2026-10-15"
status: "closed"
days_left: -44
status_as_of: "2026-11-28"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df1fbd-c6ae-c322-647d-de00015b0cf7"
updated: "2026-10-01"
publisher: "Pelenoir – Tenders of Europe"
---

# Expansion of Wodzisław Śląski Interchange Hub

> Supervision of [construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/) for the expansion of an interchange hub, including a bus station, bus loop with drainage and lighting, pedestrian and cycling path in the Municipal Park, Park&Ride parking, and sidewalk along Targowa Street.

**Status (2026-11-28):** Closed 44 days ago — deadline 2026-10-15 08:00  
**Location:** Wodzisław Śląski, Śląskie, Poland  
**Contracting authority:** Miasto Wodzisław Śląski  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)  
**CPV:** 71520000 Construction supervision services; 71000000 Architectural, construction, engineering and inspection services; 71500000 Construction-related services; 71521000 Construction-site supervision services  

## About the project

Supervision of construction works for the expansion of an interchange hub, including a bus station, bus loop with drainage and lighting, pedestrian and cycling path in the Municipal Park, Park&Ride parking, and sidewalk along Targowa Street.

## Scope of work

Supervision of construction works for the expansion of the Wodzisław Śląski Interchange Hub, including a bus station, bus loop with drainage and lighting, pedestrian and cycling path, Park&Ride parking, and sidewalk. The supervisor must hold unlimited construction licenses in road engineering, electrical, structural, and HVAC specialties and be an active member of the Regional Chamber of Civil Engineers.

### Deliverables

- supervision of construction works for bus station
- supervision of bus loop with drainage and lighting
- supervision of pedestrian and cycling path in Municipal Park
- supervision of Park&Ride parking
- supervision of sidewalk along Targowa Street

### Required services

- [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (nadzór inwestorski)
- coordination of construction works
- compliance verification with technical documentation

## Pelenoir assessment

The project scope is exclusively focused on procurement of investor supervision services for the construction of an interchange hub. This aligns with the AEC business group PROJECT_AND_CONSTRUCTION_MANAGEMENT, as the deliverables involve oversight, coordination, and compliance verification of construction works rather than design, engineering, or other AEC disciplines.

## How to take part

### Who can apply

- unlimited construction licenses in road engineering, electrical, structural, and HVAC specialties
- active membership in the Regional Chamber of Civil Engineers (Okręgowa Izba Inżynierów Budownictwa)
- ability to act as the main supervision inspector for road engineering works

### What to submit

- electronic offer via the procurement platform
- excerpt or information from the National Court Register (KRS), Central Register of Economic Activity (CEIDG), or other relevant register
- power of attorney or document confirming representation rights (if applicable)
- commitment from third parties to provide necessary resources (if applicable)

### Award criteria

- Price (100% weight)

## Disciplines

- **Project and construction management** (primary, 100%): Supervision of construction works for the expansion of the Wodzisław Śląski Interchange Hub, including coordination of works, compliance verification with technical documentation, and acting as the main supervision inspector for road engineering and related specialties.

## Related projects

- [Stormwater retention basins: flood resilience upgrade for Radom](https://pelenoir.com/en/tenders-of-europe/projects/stormwater-retention-basins-flood-resilience-upgrade-for-radom-19753/) — Radom, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [County road reconstruction: 800-metre rebuild plus junction upgrade](https://pelenoir.com/en/tenders-of-europe/projects/county-road-reconstruction-800-metre-rebuild-plus-junction-upgrade-20429/) — Puck, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Heritage culture centre: multi-discipline supervision for modernisation and conversion](https://pelenoir.com/en/tenders-of-europe/projects/heritage-culture-centre-multi-discipline-supervision-for-20822/) — Ząbkowice Śląskie, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Firefighting equipment hangar: expansion, rebuild and partial demolition in a national park](https://pelenoir.com/en/tenders-of-europe/projects/firefighting-equipment-hangar-expansion-rebuild-and-partial-20219/) — Uhowo, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Road network upgrade: regional transport hub accessibility for Opole](https://pelenoir.com/en/tenders-of-europe/projects/road-network-upgrade-regional-transport-hub-accessibility-for-opole-20215/) — Opole, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Kayak marina construction: investor supervision for water and electrical installations](https://pelenoir.com/en/tenders-of-europe/projects/kayak-marina-construction-investor-supervision-for-water-and-19955/) — Toporów, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df1fbd-c6ae-c322-647d-de00015b0cf7  
Original title: Pełnienie nadzoru inwestorskiego nad realizacją zadania pn. „Rozbudowa Centrum Przesiadkowego w Wodzisławiu Śląskim”.

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/expansion-of-wodzislaw-slaski-interchange-hub-13041/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
