---
title: "Expansion and modernization of Alfred Sokołowski District Hospital in Złotów with underground medical-technical infrastructure"
url: "https://pelenoir.com/en/tenders-of-europe/projects/expansion-and-modernization-of-alfred-sokolowski-district-hospital-in-12949/"
id: 12949
country: "Poland"
city: "Złotów"
region: "Wielkopolskie"
client: "Starostwo Powiatowe w Złotowie"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)"
deadline: "2026-10-07"
status: "closed"
days_left: -53
status_as_of: "2026-11-29"
disciplines: ["Architecture","Engineering","Specialist consulting"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df1d6a-4bf6-5e38-db89-6a000146b614"
updated: "2026-09-28"
publisher: "Pelenoir – Tenders of Europe"
---

# Expansion and modernization of Alfred Sokołowski District Hospital in Złotów with underground medical-technical infrastructure

> Development of complete design and cost documentation for the reconstruction, expansion, and equipping of the [hospital](https://pelenoir.com/en/tenders-of-europe/typologies/healthcare/)'s infrastructure, including the construction of an underground medical-technical facility meeting protective structure standards (U1) under…

**Status (2026-11-29):** Closed 53 days ago — deadline 2026-10-07 09:00  
**Location:** Złotów, Wielkopolskie, Poland  
**Contracting authority:** Starostwo Powiatowe w Złotowie  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)  
**CPV:** 71000000 Architectural, construction, engineering and inspection services; 71200000 Architectural and related services; 71220000 Architectural design services; 71320000 Engineering design services  

## About the project

Development of complete design and cost documentation for the reconstruction, expansion, and equipping of the hospital's infrastructure, including the construction of an underground medical-technical facility meeting protective structure standards (U1) under civil defense regulations.

## Scope of work

Development of complete design and cost documentation required for a public procurement procedure for [construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/) subject to building permit regulations. Includes architectural and execution designs, bills of quantities, and health and safety documentation for the hospital's reconstruction, expansion, and underground medical-technical infrastructure (protective structure U1).

### Deliverables

- [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) documentation
- execution designs
- bills of quantities
- health and safety documentation (if required by law)
- complete design and cost documentation for public procurement of construction works

### Required services

- architectural design services
- [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) services (structural, electrical, HVAC, plumbing)

## Pelenoir assessment

This project primarily involves the development of comprehensive design documentation for the expansion and modernization of a district hospital, including an underground medical-technical facility compliant with protective structure standards. The scope explicitly supports architectural design and multi-disciplinary engineering services, with a secondary need for specialist consulting related to the protective infrastructure.

## How to take part

### Who can apply

- Minimum 2 completed projects in the last 3 years involving comprehensive design documentation for public utility buildings (≥2500 m²)
- Project team must include: 1 architect (min. 2 years experience), 1 structural engineer (unrestricted license, min. 2 years experience), 1 electrical engineer (unrestricted license, min. 2 years experience), 1 HVAC/plumbing engineer (unrestricted license, min. 2 years experience)

### What to submit

- Offer in electronic form with qualified electronic signature or trusted signature
- Documents in Polish
- Submission via electronic procurement platform (platformazakupowa.pl)
- Maximum file size: 150 MB per file for offers, 500 MB for communication

### Award criteria

- Price (80% weight)
- Completion time (20% weight, max 20 points for shortest time, 0 points for 60 days)

## Disciplines

- **Architecture** (primary, 50%): Development of architectural design documentation for the hospital's reconstruction, expansion, and integration of an underground medical-technical facility, including conceptual and execution designs compliant with protective structure standards (U1).
- **Engineering** (secondary, 40%): Structural, civil, electrical, HVAC, and plumbing engineering design for the hospital's reconstruction, expansion, and underground medical-technical infrastructure, ensuring compliance with protective structure (U1) and civil defense regulations.
- **Specialist consulting** (secondary, 10%): Specialist advisory and design support for the underground medical-technical infrastructure, including compliance with protective structure (U1) standards and civil defense requirements.

## Related projects

- [Heritage roof restoration: historic art academy attic and roof repair](https://pelenoir.com/en/tenders-of-europe/projects/heritage-roof-restoration-historic-art-academy-attic-and-roof-repair-20816/) — Gdańsk, Poland · Service contract · deadline 2026-12-02 (3 days left to apply)
- [Shelters design: two underground hideouts for 300 people each at Poznań University of Technology](https://pelenoir.com/en/tenders-of-europe/projects/shelters-design-two-underground-hideouts-for-300-people-each-at-20221/) — Poznań, Poland · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Expansion and modernization of Włodzimierz Potocki Primary School in Sękocin/Słomin](https://pelenoir.com/en/tenders-of-europe/projects/expansion-and-modernization-of-wlodzimierz-potocki-primary-school-in-18723/) — Raszyn, Poland · Service contract · deadline 2026-12-07 (8 days left to apply)
- [Hospital building redesign: expansion and upgrade of two blood centre blocks](https://pelenoir.com/en/tenders-of-europe/projects/hospital-building-redesign-expansion-and-upgrade-of-two-blood-centre-20805/) — Katowice, Poland · Service contract · deadline 2026-12-03 (4 days left to apply)
- [Village hall modernisation: new insulated floor and ceramic tiles](https://pelenoir.com/en/tenders-of-europe/projects/village-hall-modernisation-new-insulated-floor-and-ceramic-tiles-20423/) — Juchnowiec Kościelny, Poland · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Social housing renovation: design and cost documentation for 39 municipal flats](https://pelenoir.com/en/tenders-of-europe/projects/social-housing-renovation-design-and-cost-documentation-for-39-20667/) — Lubawka, Poland · Service contract · deadline 2026-12-01 (2 days left to apply)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df1d6a-4bf6-5e38-db89-6a000146b614  
Original title: Opracowanie dokumentacji projektowej dla Przebudowa rozbudowa doposażenia inf. Szpitala Powiatowego im. A. Sokołowskiego w Złotowie z budową podziemnej inf. med-tech. speł. wymagania budowli ochronnej

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/expansion-and-modernization-of-alfred-sokolowski-district-hospital-in-12949/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
