---
title: "Energy loss study: three-year technical analysis for Romania’s national power grid"
url: "https://pelenoir.com/en/tenders-of-europe/projects/energy-loss-study-three-year-technical-analysis-for-romanias-national-19777/"
id: 19777
country: "Romania"
city: "București"
client: "COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE \"TRANSELECTRICA\" S.A."
type: "Service contract"
procedure: "open tender (licitație deschisă)"
deadline: "2027-01-11"
status: "open"
days_left: 44
status_as_of: "2026-11-28"
value: "RON 600 000 (≈ EUR 112 271)"
disciplines: ["Engineering","Sustainability"]
source: "SEAP"
source_url: "https://www.e-licitatie.ro/pub/notices/c-notice/v2/view/100214406"
updated: "2026-11-18"
publisher: "Pelenoir – Tenders of Europe"
---

# Energy loss study: three-year technical analysis for Romania’s national power grid

> Three-year energy loss study: where post-calculation turns technical power consumption into a forecast.

**Status (2026-11-28):** 44 days left to apply — deadline 2027-01-11 15:00  
**Location:** București, Romania  
**Contracting authority:** COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE "TRANSELECTRICA" S.A.  
**Opportunity type:** Service contract — open tender (licitație deschisă)  
**Declared value:** RON 600 000 (≈ EUR 112 271)  
**CPV:** 71335000  

## About the project

A three-year technical study to calculate and forecast energy losses in [Romania](https://pelenoir.com/en/tenders-of-europe/countries/romania/)’s national electricity transmission network (RET). The study includes post-calculation of technical power consumption (CPT), energy balance sheets for territorial transport branches and the entire RET, and forecasting energy losses for 2027–2029. The work is structured in five annual phases per year, covering post-calculation, verification of energy norms, and setting norms for the following year.

## Why it matters

Post-calculation of technical power consumption turns a three-year energy loss study into a forecast for Romania’s national power grid.

## Scope of work

The study requires technical services to perform post-calculation of technical power consumption (CPT), energy balance sheets for territorial transport branches and the entire national electricity transmission network (RET), and forecasting energy losses for 2027–2029. The work is divided into five annual phases per year, including post-calculation, verification of energy norms, and setting norms for the following year. The study must align with the technical requirements of NTE 013/16/00 and support the company’s [energy efficiency](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) reporting.

### Deliverables

- Annual post-calculation of CPT for each quarter and semester
- Energy balance sheets for territorial transport branches and the entire RET
- Forecasting of energy losses for 2027–2029
- Verification and setting of energy norms for the following year
- Methodology for data processing, modelling, and technical correlations

### Required services

- Technical studies and analysis in the energy sector
- Post-calculation of technical power consumption (CPT)
- Energy balance sheet preparation
- Forecasting of energy losses in power transmission networks
- Consultancy on energy efficiency and regulatory compliance (NTE 013/16/00)

## Pelenoir assessment

This project is primarily a technical engineering study focused on analyzing and forecasting energy losses in Romania’s national electricity transmission network. The scope supports ENGINEERING_AND_TECHNICAL_PLANNING as the dominant discipline, with a secondary focus on SUSTAINABILITY_AND_BUILDING_PERFORMANCE due to its emphasis on energy efficiency and regulatory compliance.

## How to take part

### Who can apply

- Registration in a commercial or professional register in the country of residence
- Experience in similar technical studies for power transmission or distribution networks, including post-calculation, energy balance sheets, forecasting, and regulatory compliance (NTE 013/16/00)
- Implementation and maintenance of a quality management system (SR EN ISO 9001 or equivalent)
- Implementation and maintenance of an environmental management system (SR EN ISO 14001 or equivalent)
- Compliance with exclusion grounds under Romanian public procurement law (Law 99/2016)
- No conflict of interest with contracting authority personnel
- No sanctions for professional misconduct or false declarations
- Guarantee of participation (4,800 RON) and performance guarantee (10% of contract value)

### What to submit

- Completed DUAE (Declaration on Own Economic Situation) form
- Guarantee of participation (4,800 RON)
- Technical and financial offer
- Methodology proposal for data processing, modelling, and forecasting
- List of key experts and their experience
- Certificates for quality and environmental management systems (ISO 9001 and ISO 14001 or equivalents)
- Documents demonstrating similar experience (contracts, reception reports, certificates)
- Declaration of non-inclusion in EU sanctions (Regulation (UE) 2022/576)
- Agreement of association or subcontracting (if applicable)

### Award criteria

- Price (40% weight)
- Experience of key experts in CPT post-calculation (10% weight)
- Experience of key experts in energy balance sheets (10% weight)
- Experience of key experts in CPT forecasting (10% weight)
- Methodology for data processing and technical modelling (12% weight)
- Methodology for energy balance sheet preparation (8% weight)
- Methodology for CPT forecasting (10% weight)

## Disciplines

- **Engineering** (primary, 90%): Technical engineering services for post-calculation of technical power consumption (CPT), energy balance sheets, and forecasting energy losses in Romania’s national electricity transmission network (RET). This includes structural and analytical work to model, verify, and set energy norms, as well as compliance with technical standards (NTE 013/16/00).
- **Sustainability** (secondary, 10%): Energy efficiency analysis, regulatory compliance for sustainability reporting, and optimization of energy loss forecasting to improve the performance of the national power grid.

## Related projects

- [Riverbed restoration and flood protection for Armeniș stream](https://pelenoir.com/en/tenders-of-europe/projects/riverbed-restoration-and-flood-protection-for-armenis-stream-19601/) — Sat Bătrân, Romania · Service contract · deadline 2027-01-13 (46 days left to apply)
- [Electrical Design Services for MT-JT Grid Connections](https://pelenoir.com/en/tenders-of-europe/projects/electrical-design-services-for-mt-jt-grid-connections-17320/) — București, Romania · Service contract · deadline 2026-12-10 (12 days left to apply)
- [Road rehabilitation: technical design for two county roads in Bistrița-Năsăud](https://pelenoir.com/en/tenders-of-europe/projects/road-rehabilitation-technical-design-for-two-county-roads-in-bistrita-19368/) — Bistrița, Romania · Service contract · deadline 2026-12-21 (23 days left to apply)
- [Rehabilitation and modernization of DJ 172B county road](https://pelenoir.com/en/tenders-of-europe/projects/rehabilitation-and-modernization-of-dj-172b-county-road-18762/) — Bistrita, Romania · Service contract · deadline 2026-12-15 (17 days left to apply)
- [Psychiatric hospital refurbishment: structural and technical redesign of ten inpatient buildings](https://pelenoir.com/en/tenders-of-europe/projects/psychiatric-hospital-refurbishment-structural-and-technical-redesign-19602/) — Gătaia, Romania · Service contract · deadline 2026-12-21 (23 days left to apply)
- [Extension of Stopways for Runway at Câmpia Turzii Military Base 1833](https://pelenoir.com/en/tenders-of-europe/projects/extension-of-stopways-for-runway-at-campia-turzii-military-base-1833-14783/) — Câmpia Turzii, Romania · Service contract · deadline 2026-12-15 (17 days left to apply)

## Source

Original notice on SEAP: https://www.e-licitatie.ro/pub/notices/c-notice/v2/view/100214406  
Original title: „Studiu multianual 2027 – 2029: postcalculul CPT, bilanțul energetic pe sucursale teritoriale de transport și în ansamblul RET, prognoza pierderilor de energie”

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/energy-loss-study-three-year-technical-analysis-for-romanias-national-19777/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
