---
title: "Energy efficiency upgrade of Lipno Tax Office buildings"
url: "https://pelenoir.com/en/tenders-of-europe/projects/energy-efficiency-upgrade-of-lipno-tax-office-buildings-16047/"
id: 16047
country: "Poland"
city: "Lipno"
region: "Kujawsko-pomorskie"
client: "IZBA ADMINISTRACJI SKARBOWEJ W BYDGOSZCZY"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 ustawy)"
deadline: "2026-11-03"
status: "closed"
days_left: -26
status_as_of: "2026-11-29"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df337f-5c05-6747-86fd-0300016b6ff0"
updated: "2026-10-26"
publisher: "Pelenoir – Tenders of Europe"
---

# Energy efficiency upgrade of Lipno Tax Office buildings

> Supervision of [construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/) to improve [energy efficiency](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) in existing Tax Office buildings, including verification of design documentation, participation in contractor selection, and financial and technical oversight of the investment.

**Status (2026-11-29):** Closed 26 days ago — deadline 2026-11-03 10:00  
**Location:** Lipno, Kujawsko-pomorskie, Poland  
**Contracting authority:** IZBA ADMINISTRACJI SKARBOWEJ W BYDGOSZCZY  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 ustawy)  
**CPV:** 71520000 Construction supervision services; 71247000 Supervision of building work; 71541000 Construction project management services; 71312000 Structural engineering consultancy services; 71000000 Architectural, construction, engineering and inspection services  

## About the project

Supervision of construction works to improve energy efficiency in existing Tax Office buildings, including verification of design documentation, participation in contractor selection, and financial and technical oversight of the investment.

## Scope of work

Supervision of construction works for energy efficiency improvements in Tax Office buildings, including verification of design and cost documentation, participation in contractor selection procedures, financial and technical oversight, and final acceptance of the investment.

### Deliverables

- Supervision of construction works for energy efficiency retrofit
- Verification of design and cost documentation
- Participation in contractor selection procedures
- Financial and technical oversight of the investment
- Final acceptance of the completed works

### Required services

- [Construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (inspektor nadzoru inwestorskiego)
- Project management support
- Technical consulting in [structural engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)

## Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as its scope is exclusively focused on the supervision and management of construction works for energy efficiency upgrades in existing public administration buildings. No design, engineering, or other AEC disciplines are explicitly supported by the extracted facts.

## How to take part

### Who can apply

- Minimum 5 years of experience in construction supervision for energy efficiency or thermal modernization projects in public or collective housing buildings (minimum 400 m², minimum 1,000,000 PLN gross contract value)
- Team must include: 1 construction supervisor (structural), 1 electrical installations supervisor, and 1 HVAC/sanitary installations supervisor, each with valid Polish or EU-recognized professional licenses and minimum 5 years of experience
- Proficiency in Polish language for all team members

### What to submit

- Offers must be submitted electronically via the e-Zamawiający platform
- Documents must be in Polish
- Required forms: Załącznik nr 8 (service references), Załącznik nr 9 (team qualifications), Załącznik nr 10 (group capital declaration)

### Award criteria

- Price only

## Disciplines

- **Project and construction management** (primary, 100%): Supervision of construction works for energy efficiency improvements, including verification of design and cost documentation, participation in contractor selection, financial and technical oversight, and final acceptance of the investment.

## Related projects

- [Hospital expansion: multi-trade supervision for rehabilitation day unit modernisation](https://pelenoir.com/en/tenders-of-europe/projects/hospital-expansion-multi-trade-supervision-for-rehabilitation-day-20814/) — Poznań, Poland · Service contract · deadline 2026-12-04 (5 days left to apply)
- [Stormwater retention basins: flood resilience upgrade for Radom](https://pelenoir.com/en/tenders-of-europe/projects/stormwater-retention-basins-flood-resilience-upgrade-for-radom-19753/) — Radom, Poland · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Road modernisation: investor supervision for cross-border road upgrades](https://pelenoir.com/en/tenders-of-europe/projects/road-modernisation-investor-supervision-for-cross-border-road-upgrades-19952/) — Kłodzko, Poland · Service contract · deadline 2026-11-26 (closed 3 days ago)
- [Social housing: new multi-family building with underground garage and retail](https://pelenoir.com/en/tenders-of-europe/projects/social-housing-new-multi-family-building-with-underground-garage-and-20665/) — Katowice, Poland · Service contract · deadline 2026-12-04 (5 days left to apply)
- [Road roundabout construction: supervision and financial settlement for provincial road expansion](https://pelenoir.com/en/tenders-of-europe/projects/road-roundabout-construction-supervision-and-financial-settlement-for-19975/) — Janów Lubelski, Poland · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Road junction expansion: investor supervision for national road upgrade near Korzeniste](https://pelenoir.com/en/tenders-of-europe/projects/road-junction-expansion-investor-supervision-for-national-road-19353/) — Korzeniste, Poland · Service contract · deadline 2026-11-25 (closed 4 days ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df337f-5c05-6747-86fd-0300016b6ff0  
Original title: Pełnienie funkcji inspektora nadzoru inwestorskiego dla zadania pod nazwą „Poprawa efektywności energetycznej budynków Urzędu Skarbowego w Lipnie”

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/energy-efficiency-upgrade-of-lipno-tax-office-buildings-16047/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
