---
title: "Energy efficiency and sustainability advice for a future-proof park"
url: "https://pelenoir.com/en/tenders-of-europe/projects/energy-efficiency-and-sustainability-advice-for-a-future-proof-park-20172/"
id: 20172
country: "Netherlands"
city: "Ede"
region: "Gelderland"
client: "Stichting Park van de Toekomst"
type: "Service contract"
procedure: "Open procedure (openbaar)"
deadline: "2027-02-01"
status: "open"
days_left: 65
status_as_of: "2026-11-28"
disciplines: ["Sustainability","Project and construction management"]
source: "TenderNed"
source_url: "https://www.tenderned.nl/aankondigingen/overzicht/450012"
updated: "2026-11-20"
publisher: "Pelenoir – Tenders of Europe"
---

# Energy efficiency and sustainability advice for a future-proof park

> Integrated implementation project for [energy efficiency](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) and sustainability measures in Park van de Toekomst, including energy circles, energy expert teams, energy scans, and energy monitoring.

**Status (2026-11-28):** 65 days left to apply — deadline 2027-02-01 09:00  
**Location:** Ede, Gelderland, Netherlands  
**Contracting authority:** Stichting Park van de Toekomst  
**Opportunity type:** Service contract — Open procedure (openbaar)  
**CPV:** 71314300; 71313000 Environmental engineering consultancy services  

## About the project

Integrated implementation project for energy efficiency and sustainability measures in Park van de Toekomst, including energy circles, energy expert teams, energy scans, and energy monitoring. The project is divided into two lots: Lot 1 covers energy circles and an energy expert team, while Lot 2 covers energy scans and energy monitoring. Both lots are part of a [framework agreement](https://pelenoir.com/en/tenders-of-europe/types/framework-agreements/) with a duration of 33 months.

## Scope of work

The project involves delivering energy efficiency and sustainability consulting services for Park van de Toekomst. Lot 1 focuses on establishing energy circles and an energy expert team, while Lot 2 covers energy scans and energy monitoring. Both lots require a plan of approach, demonstration, and pricing as part of the submission. The framework agreement will last 33 months and may involve renewed competition among a maximum of two participants per lot.

### Deliverables

- Plan of approach
- Demonstration of capabilities
- Pricing sheet (Bijlage 3 - Prijzenblad)
- Uniform European Procurement Document (UEA)
- Reference form (Bijlage 2 - Referentieformulier)
- Signed declaration of no Russian involvement (Bijlage 7)

### Required services

- Energy efficiency advice
- Environmental engineering advice
- Energy monitoring
- Energy scans
- Establishment and operation of energy circles
- Energy expert team services

## Pelenoir assessment

This project is primarily focused on delivering sustainability and building performance services, including energy efficiency and environmental engineering advice, energy monitoring, and energy scans for a public park. A secondary aspect involves project and [construction management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) for the establishment and operation of energy circles and an energy expert team.

## How to take part

### Who can apply

- Submission of Uniform European Procurement Document (UEA)
- Compliance with exclusion grounds (Uniform Europees Aanbestedingsdocument)
- Electronic submission in Dutch
- Maximum of two lots per tenderer

### What to submit

- Electronic submission via [TenderNed](https://pelenoir.com/en/tenders-of-europe/sources/tenderned/)
- Submission in Dutch
- No variants allowed
- No electronic catalogues allowed
- Tenders must remain valid for 2 months

### Award criteria

- Price (20% weight)
- Plan of approach (60% weight)
- Demonstration (20% weight)

## Tender documents

The visible document package includes procurement and contractual files for the tender. The PDF files likely contain the tender notice, procurement guidelines ('Aanbestedingsleidraad Energie op Eigen Kracht'), the Uniform European Procurement Document (UEA), and framework agreement drafts for both lots. The Excel file ('Bijlage 3 - Prijzenblad') probably outlines pricing structures or cost templates. The Word documents include a reference form and a declaration of no Russian involvement. The ZIP file appears to bundle all documents for download. The exact content of each file is inferred from filenames and context, but unseen details remain unknown.

## Disciplines

- **Sustainability** (primary, 80%): Energy efficiency advice, environmental engineering advice, energy monitoring, and energy scans for Park van de Toekomst, including the development and implementation of sustainability measures to improve building and operational performance.
- **Project and construction management** (secondary, 20%): Establishment and operation of energy circles and an energy expert team, including coordination, planning, and management of these initiatives within the framework agreement.

## Related projects

- [Energy communities exploration for five Dutch municipalities](https://pelenoir.com/en/tenders-of-europe/projects/energy-communities-exploration-for-five-dutch-municipalities-16343/) — Netherlands · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Movable cycle bridge and access infrastructure design in Delft](https://pelenoir.com/en/tenders-of-europe/projects/movable-cycle-bridge-and-access-infrastructure-design-in-delft-19930/) — Delft, Netherlands · Service contract · deadline 2026-12-23 (25 days left to apply)
- [Police Engineering and Advisory Services Framework](https://pelenoir.com/en/tenders-of-europe/projects/police-engineering-and-advisory-services-framework-8978/) — Netherlands · Service contract · deadline 2027-01-22 (55 days left to apply)
- [Emergency wastewater outlet: engineering advice for a new overflow at Eindhoven treatment plant](https://pelenoir.com/en/tenders-of-europe/projects/emergency-wastewater-outlet-engineering-advice-for-a-new-overflow-at-20648/) — Eindhoven, Netherlands · Service contract · deadline 2026-12-08 (10 days left to apply)
- [Fietsecoduct A13 Delft](https://pelenoir.com/en/tenders-of-europe/projects/fietsecoduct-a13-delft-15065/) — Delft, Netherlands · Service contract · deadline 2027-01-15 (48 days left to apply)
- [Westland Engineering Services Framework](https://pelenoir.com/en/tenders-of-europe/projects/westland-engineering-services-framework-9002/) — Naaldwijk, Netherlands · Service contract · deadline 2026-11-25 (closed 3 days ago)

## Source

Original notice on TenderNed: https://www.tenderned.nl/aankondigingen/overzicht/450012  
Original title: Geïntegreerd uitvoeringsproject Energie op Eigen Kracht

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/energy-efficiency-and-sustainability-advice-for-a-future-proof-park-20172/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
