---
title: "Dutch Defence Real Estate Energy Efficiency Measures"
url: "https://pelenoir.com/en/tenders-of-europe/projects/dutch-defence-real-estate-energy-efficiency-measures-8983/"
id: 8983
country: "Netherlands"
client: "Rijksvastgoedbedrijf"
type: "Works contract"
procedure: "open procedure"
deadline: "2026-11-02"
status: "closed"
days_left: -26
status_as_of: "2026-11-28"
disciplines: ["Sustainability","Engineering","Project and construction management"]
source: "TenderNed"
source_url: "https://www.tenderned.nl/aankondigingen/overzicht/441991"
updated: "2026-09-28"
publisher: "Pelenoir – Tenders of Europe"
---

# Dutch Defence Real Estate Energy Efficiency Measures

> Implementation of energy-saving measures (EML) across the Dutch Defence real estate portfolio to comply with legal energy-saving obligations and enhance [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) by the end of 2029.

**Status (2026-11-28):** Closed 26 days ago — deadline 2026-11-02 09:00  
**Location:** Netherlands  
**Contracting authority:** Rijksvastgoedbedrijf  
**Opportunity type:** Works contract — open procedure  
**CPV:** 45000000 Construction work; 71315400  

## About the project

Implementation of energy-saving measures (EML) across the Dutch Defence real estate portfolio to comply with legal energy-saving obligations and enhance sustainability by the end of 2029. The project involves preparation and execution of measures nationwide, divided into 12 regional lots.

## Scope of work

The tender requires the integral preparation and execution of energy-saving measures (EML) for Defence real estate, including technical, administrative, and legal preparations, and physical implementation of measures to meet legal energy-saving obligations by the end of 2029. The contract may be extended by 12 months and includes a two-step process for additional agreements under the NOK system.

### Deliverables

- Energy-saving measures (EML) implementation
- Technical and administrative preparation of measures
- Legal and contractual preparations
- Execution of measures across Defence real estate portfolio

### Required services

- building inspection services
- [construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/)
- [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/)
- technical consultancy

## Pelenoir assessment

This project is primarily focused on sustainability and building performance, specifically the implementation of energy-saving measures (EML) across a nationwide real estate portfolio. It also involves significant technical engineering work for infrastructure and building-services adaptations, as well as project management to ensure compliance and timely execution.

## How to take part

### Who can apply

- Compliance with Uniform European Tender Document (UEA)
- No reserved participation for sheltered workshops
- Compliance with Foreign Subsidies Regulation (FSR)

### What to submit

- Electronic submission via [TenderNed](https://pelenoir.com/en/tenders-of-europe/sources/tenderned/)
- Tender submission in Dutch
- Confidentiality agreement required
- Plan of approach (see tender guide paragraph 5.3)
- Completed tender form (inschrijvingsbiljet)

### Award criteria

- Price (weight: 0, using 'award based on value' methodology)
- Quality: Plan of approach (weight: 0, using 'award based on value' methodology)

## Tender documents

The visible document package includes tender guidelines, contract templates, and submission forms such as the 'Aanbestedingsleidraad' (tender guide) and 'Inschrijvingsbiljet' (tender form). It also contains Excel templates for reporting energy-saving measures (EML) and PDFs detailing the NOK system for additional agreements. The package likely includes technical and administrative requirements for implementing energy efficiency measures, as well as legal and compliance documents. The 7Z archive ('Bijlagen Raamovereenkomst') may contain supplementary contract annexes, but its exact contents remain unknown without access.

## Disciplines

- **Sustainability** (primary, 60%): Implementation of energy-saving measures (EML) across the Dutch Defence real estate portfolio, including technical, administrative, and legal preparations to comply with legal energy-saving obligations and enhance sustainability.
- **Engineering** (secondary, 30%): Technical engineering and planning for energy efficiency infrastructure, including structural, building-services, and infrastructure adaptations required for the implementation of EML measures.
- **Project and construction management** (secondary, 10%): Project management and coordination for the preparation and execution of energy-saving measures, including timeline, cost, and compliance oversight across 12 regional lots.

## Related projects

- [Energy communities exploration for five Dutch municipalities](https://pelenoir.com/en/tenders-of-europe/projects/energy-communities-exploration-for-five-dutch-municipalities-16343/) — Netherlands · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Energy efficiency and sustainability advice for a future-proof park](https://pelenoir.com/en/tenders-of-europe/projects/energy-efficiency-and-sustainability-advice-for-a-future-proof-park-20172/) — Ede, Netherlands · Service contract · deadline 2027-02-01 (65 days left to apply)
- [Renovation of Amsterdam Lelylaan Station](https://pelenoir.com/en/tenders-of-europe/projects/renovation-of-amsterdam-lelylaan-station-15600/) — Amsterdam, Netherlands · Works contract · deadline 2026-11-30 (2 days left to apply)
- [Renovation of two 1950s bascule bridges in Gouda](https://pelenoir.com/en/tenders-of-europe/projects/renovation-of-two-1950s-bascule-bridges-in-gouda-19737/) — Gouda, Netherlands · Works contract · deadline 2026-12-18 (20 days left to apply)
- [Train and metro station renovation: a transport hub with bike parking in Amsterdam](https://pelenoir.com/en/tenders-of-europe/projects/train-and-metro-station-renovation-a-transport-hub-with-bike-parking-19540/) — Amsterdam, Netherlands · Works contract · deadline 2026-12-18 (20 days left to apply)
- [Sustainability Consulting Framework Agreement](https://pelenoir.com/en/tenders-of-europe/projects/sustainability-consulting-framework-agreement-17935/) — Helsinki, Finland · Service contract · deadline 2026-12-07 (9 days left to apply)

## Source

Original notice on TenderNed: https://www.tenderned.nl/aankondigingen/overzicht/441991  
Original title: Raamovereenkomst Duurzaamheid en EML-maatregelen

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/dutch-defence-real-estate-energy-efficiency-measures-8983/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
