---
title: "Ducos Prison Cynotechnical Base"
url: "https://pelenoir.com/en/tenders-of-europe/projects/ducos-prison-cynotechnical-base-9993/"
id: 9993
country: "France"
city: "Ducos"
client: "CENTRE PENITENTIAIRE DE DUCOS"
type: "Service contract"
procedure: "Open procedure (Procédure Ouverte)"
deadline: "2026-10-16"
status: "closed"
days_left: -43
status_as_of: "2026-11-28"
value: "EUR 101 609"
disciplines: ["Architecture","Engineering","Urban design and planning"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-89854"
updated: "2026-09-16"
publisher: "Pelenoir – Tenders of Europe"
---

# Ducos Prison Cynotechnical Base

> Construction of a cynotechnical base at Ducos Prison, including kennels, outdoor spaces for dogs, and staff facilities such as offices, workspaces, and relaxation areas.

**Status (2026-11-28):** Closed 43 days ago — deadline 2026-10-16 01:00  
**Location:** Ducos, France  
**Contracting authority:** CENTRE PENITENTIAIRE DE DUCOS  
**Opportunity type:** Service contract — Open procedure (Procédure Ouverte)  
**Declared value:** EUR 101 609  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Construction of a cynotechnical base at Ducos Prison, including kennels, outdoor spaces for dogs, and staff facilities such as offices, workspaces, and relaxation areas.

## Scope of work

The project requires a full master planning and design (maîtrise d'œuvre) for a cynotechnical base at Ducos Prison, including kennels, outdoor dog areas, and staff facilities such as offices, workspaces, and relaxation areas. The contract duration is 12 months.

### Deliverables

- Master planning and design for cynotechnical base
- Kennels and outdoor spaces for dogs
- Staff offices, workspaces, and relaxation areas

### Required services

- Master planning (maîtrise d'œuvre)
- [Architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/)
- Technical studies

## Pelenoir assessment

The Ducos Prison Cynotechnical Base project primarily involves architectural design for the construction of kennels, outdoor dog areas, and staff facilities. It also includes engineering and technical planning for structural and utility requirements, as well as master planning for site integration within the prison complex.

## How to take part

### Who can apply

- Declaration on honor to confirm no exclusion criteria apply
- URSSAF and tax compliance attestations
- Proof of financial capacity (bank declaration or professional risk insurance)
- List of similar projects completed in the last three years
- Declaration of annual workforce and professional qualifications

### What to submit

- Technical proposal (mémoire technique)
- Financial offer (prix des prestations)
- Supporting documents for eligibility and capacity

### Award criteria

- Price of services
- Technical proposal (mémoire technique)
- Project timeline for studies and works
- Documents and references

## Disciplines

- **Architecture** (primary, 60%): Architectural design of the cynotechnical base, including kennels, outdoor dog areas, and staff facilities such as offices, workspaces, and relaxation areas. This includes conceptual and detailed design work for the building and its functional spaces.
- **Engineering** (secondary, 30%): Structural, civil, and technical engineering for the cynotechnical base, including infrastructure for kennels, outdoor spaces, and staff facilities. This may involve load-bearing calculations, utility planning, and compliance with technical standards.
- **Urban design and planning** (secondary, 10%): Master planning and spatial organization of the cynotechnical base within the prison complex, ensuring functional integration with existing infrastructure and outdoor spaces.

## Related projects

- [Replacement of Kahani Hospital Roof](https://pelenoir.com/en/tenders-of-europe/projects/replacement-of-kahani-hospital-roof-17258/) — Mamoudzou, France · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Restructuring of the north wing of Lacaze-Duthiers building at Roscoff Biological Station](https://pelenoir.com/en/tenders-of-europe/projects/restructuring-of-the-north-wing-of-lacaze-duthiers-building-at-13250/) — Roscoff, France · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Gymnasium renovation: energy upgrade and accessibility for Saint-Denis sports hall](https://pelenoir.com/en/tenders-of-europe/projects/gymnasium-renovation-energy-upgrade-and-accessibility-for-saint-denis-20204/) — Péronne, France · Service contract · deadline 2026-12-17 (19 days left to apply)
- [Renovation of workshop roofs and photovoltaic installations at Lycée Yves Thépôt](https://pelenoir.com/en/tenders-of-europe/projects/renovation-of-workshop-roofs-and-photovoltaic-installations-at-lycee-15921/) — Quimper, France · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Auditorium and foyer modernisation: heritage-listed cultural centre upgrade](https://pelenoir.com/en/tenders-of-europe/projects/auditorium-and-foyer-modernisation-heritage-listed-cultural-centre-19553/) — Paris, France · Service contract · deadline 2026-12-17 (19 days left to apply)
- [Train maintenance and storage depot: new regional rail facility in Hendaye](https://pelenoir.com/en/tenders-of-europe/projects/train-maintenance-and-storage-depot-new-regional-rail-facility-in-19943/) — Hendaye, France · Service contract · deadline 2026-12-18 (20 days left to apply)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-89854  
Original title: Mission de maitrise d'œuvre (MOE) pour la création d'une base cynotechnique au centre pénitentiaire (CP) de Ducos.

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/ducos-prison-cynotechnical-base-9993/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
