---
title: "Dublin City Council Fire Safety Remediation Design Services"
url: "https://pelenoir.com/en/tenders-of-europe/projects/dublin-city-council-fire-safety-remediation-design-services-8848/"
id: 8848
country: "Ireland"
city: "Dublin"
client: "Dublin City Council"
type: "Service contract"
procedure: "Competitive with negotiation"
deadline: "2026-10-19"
status: "closed"
days_left: -40
status_as_of: "2026-11-28"
value: "EUR 7 m"
disciplines: ["Architecture","Engineering","Project and construction management","Specialist consulting"]
source: "Irish eTenders"
source_url: "https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8836259"
updated: "2026-09-22"
publisher: "Pelenoir – Tenders of Europe"
---

# Dublin City Council Fire Safety Remediation Design Services

> Architect-led integrated design team services for fire safety remediation of Dublin City Council-owned buildings, starting with a 7-storey mixed-use development in Dublin City Centre comprising 62 residential apartments, retail units, a podium car park, and…

**Status (2026-11-28):** Closed 40 days ago — deadline 2026-10-19 12:00  
**Location:** Dublin, Ireland  
**Contracting authority:** Dublin City Council  
**Opportunity type:** Service contract — Competitive with negotiation  
**Declared value:** EUR 7 m  
**CPV:** 71000000 Architectural, construction, engineering and inspection services; 71200000 Architectural and related services; 71221000 Architectural services for buildings; 71220000 Architectural design services; 71240000 Architectural, engineering and planning services; 71310000 Consultative engineering and construction services; 71312000 Structural engineering consultancy services; 71321000 Engineering design services for mechanical and electrical installations for buildings  

## About the project

Architect-led integrated design team services for fire safety remediation of Dublin City Council-owned buildings, starting with a 7-storey mixed-use development in Dublin City Centre comprising 62 residential apartments, retail units, a podium car park, and approximately 3,000 sqm of community facilities.

## Scope of work

Architect-led integrated design team services for fire safety remediation, covering preliminary to handover stages (Stage (i) to Stage (v)) for Dublin City Council-owned buildings. Initial focus on a 7-storey mixed-use development in Dublin City Centre.

### Deliverables

- Preliminary to handover stage professional services for fire remediation works
- Architectural, engineering, and planning services
- [Construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) and project management services
- Fire and explosion protection [consultancy services](https://pelenoir.com/en/tenders-of-europe/disciplines/consulting/)
- Quantity [surveying](https://pelenoir.com/en/tenders-of-europe/disciplines/surveying/) services

### Required services

- [architectural services](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/)
- [structural engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) consultancy
- mechanical and electrical engineering design
- construction supervision
- construction project management
- fire safety consultancy
- quantity surveying

## Pelenoir assessment

The project is primarily focused on architect-led design services for fire safety remediation of a mixed-use development, with significant involvement from engineering, project management, and specialist consulting disciplines. The scope covers design, technical planning, construction oversight, and compliance advisory, reflecting a multidisciplinary approach to upgrading existing buildings.

## How to take part

### Who can apply

- [Framework agreement](https://pelenoir.com/en/tenders-of-europe/types/framework-agreements/) establishment through competitive process
- Subject to funding

### Award criteria

- Most Economically Advantageous Tender (MEAT)

## Disciplines

- **Architecture** (primary, 40%): Architectural design and coordination for fire safety remediation, including compliance with building regulations, spatial integration of fire safety measures, and overall design leadership for the mixed-use development.
- **Engineering** (secondary, 30%): Structural, mechanical, and electrical engineering design for fire safety upgrades, including fire protection systems, load-bearing assessments, and compliance with technical standards.
- **Project and construction management** (secondary, 20%): Construction supervision, project management, and coordination of remediation works to ensure compliance with design specifications, timelines, and regulatory requirements.
- **Specialist consulting** (secondary, 10%): Fire safety consultancy and quantity surveying to assess risks, ensure compliance with fire safety regulations, and manage cost estimation for remediation works.

## Related projects

- [Primary school extension and sensory play area in Tipperary](https://pelenoir.com/en/tenders-of-europe/projects/primary-school-extension-and-sensory-play-area-in-tipperary-20538/) — Borrisoleigh, Ireland · Service contract · deadline 2026-12-18 (20 days left to apply)
- [New Domestic Violence Refuge in Mallow Town](https://pelenoir.com/en/tenders-of-europe/projects/new-domestic-violence-refuge-in-mallow-town-17220/) — Mallow Town, Ireland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Abbey Theatre Building Condition Survey](https://pelenoir.com/en/tenders-of-europe/projects/abbey-theatre-building-condition-survey-17221/) — Dublin, Ireland · Service contract · deadline 2026-12-09 (11 days left to apply)
- [School toilet upgrades: redesigning student facilities on Inis Meáin island](https://pelenoir.com/en/tenders-of-europe/projects/school-toilet-upgrades-redesigning-student-facilities-on-inis-meain-19729/) — Ireland · Service contract · deadline 2026-12-16 (18 days left to apply)
- [School retrofit: window, door and insulation upgrade with bike rack](https://pelenoir.com/en/tenders-of-europe/projects/school-retrofit-window-door-and-insulation-upgrade-with-bike-rack-20160/) — Portumna, Ireland · Service contract · deadline 2026-12-11 (13 days left to apply)
- [Regional sports and leisure centre redevelopment: architect-led design team](https://pelenoir.com/en/tenders-of-europe/projects/regional-sports-and-leisure-centre-redevelopment-architect-led-design-19919/) — Tralee, Ireland · Service contract · deadline 2026-12-18 (20 days left to apply)

## Source

Original notice on Irish eTenders: https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8836259  
Original title: Single Party Framework Agreement for Architect Led Integrated Design Team Services for Fire Safety Remediation Works for Dublin City Council

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/dublin-city-council-fire-safety-remediation-design-services-8848/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
