---
title: "Development Control Plans for Bantry, St. Finbarr’s and Mallow General Hospitals"
url: "https://pelenoir.com/en/tenders-of-europe/projects/development-control-plans-for-bantry-st-finbarrs-and-mallow-general-8869/"
id: 8869
country: "Ireland"
region: "Cork"
client: "Health Service Executive (HSE)"
type: "Service contract"
procedure: "Open procedure"
deadline: "2026-10-09"
status: "closed"
days_left: -50
status_as_of: "2026-11-28"
disciplines: ["Architecture","Engineering","Urban design and planning"]
source: "Irish eTenders"
source_url: "https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8949069"
updated: "2026-09-01"
publisher: "Pelenoir – Tenders of Europe"
---

# Development Control Plans for Bantry, St. Finbarr’s and Mallow General Hospitals

> Architect-led integrated design team to prepare Development Control Plans for three HSE hospitals in Cork: Bantry General [Hospital](https://pelenoir.com/en/tenders-of-europe/typologies/healthcare/), St.

**Status (2026-11-28):** Closed 50 days ago — deadline 2026-10-09 12:00  
**Location:** Cork, Ireland  
**Contracting authority:** Health Service Executive (HSE)  
**Opportunity type:** Service contract — Open procedure  
**CPV:** 71210000 Advisory architectural services; 71220000 Architectural design services; 71000000 Architectural, construction, engineering and inspection services; 71200000 Architectural and related services  

## About the project

Architect-led integrated design team to prepare Development Control Plans for three HSE hospitals in Cork: Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital.

## Scope of work

Preparation of Development Control Plans for three HSE hospitals by an architect-led integrated design team. Services include architectural, engineering and related design services.

### Deliverables

- Development Control Plans for Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital

### Required services

- [architectural services](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/)
- [engineering services](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- integrated design team coordination

## Pelenoir assessment

The project involves the preparation of Development Control Plans for three healthcare facilities, primarily requiring architectural design and coordination, supported by engineering and [urban design](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/)/planning disciplines. The scope is dominated by architectural services, with secondary contributions from technical engineering and masterplanning.

## How to take part

### Award criteria

- Most Economically Advantageous Tender (MEAT)

## Disciplines

- **Architecture** (primary, 60%): Architectural concept, building design, and overall coordination of the Development Control Plans for the three hospitals, ensuring alignment with healthcare facility requirements and masterplanning objectives.
- **Engineering** (secondary, 30%): Structural, civil, and building-services engineering required for the Development Control Plans, including infrastructure and technical systems integration for healthcare facilities.
- **Urban design and planning** (secondary, 10%): Masterplanning and spatial planning for the hospital sites, including site development, access, and public realm integration within the Development Control Plans.

## Related projects

- [New Domestic Violence Refuge in Mallow Town](https://pelenoir.com/en/tenders-of-europe/projects/new-domestic-violence-refuge-in-mallow-town-17220/) — Mallow Town, Ireland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [School toilet upgrades: redesigning student facilities on Inis Meáin island](https://pelenoir.com/en/tenders-of-europe/projects/school-toilet-upgrades-redesigning-student-facilities-on-inis-meain-19729/) — Ireland · Service contract · deadline 2026-12-16 (18 days left to apply)
- [Regional sports and leisure centre redevelopment: architect-led design team](https://pelenoir.com/en/tenders-of-europe/projects/regional-sports-and-leisure-centre-redevelopment-architect-led-design-19919/) — Tralee, Ireland · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Primary school extension and sensory play area in Tipperary](https://pelenoir.com/en/tenders-of-europe/projects/primary-school-extension-and-sensory-play-area-in-tipperary-20538/) — Borrisoleigh, Ireland · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Abbey Theatre Building Condition Survey](https://pelenoir.com/en/tenders-of-europe/projects/abbey-theatre-building-condition-survey-17221/) — Dublin, Ireland · Service contract · deadline 2026-12-09 (11 days left to apply)
- [New business school building with integrated design team lead by architect](https://pelenoir.com/en/tenders-of-europe/projects/new-business-school-building-with-integrated-design-team-lead-by-20158/) — Cork, Ireland · Service contract · deadline 2026-12-21 (23 days left to apply)

## Source

Original notice on Irish eTenders: https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8949069  
Original title: `HSE Estates SW: Development Control Plans for Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/development-control-plans-for-bantry-st-finbarrs-and-mallow-general-8869/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
