---
title: "Contract supervision: wooden boardwalk modernisation in a national park"
url: "https://pelenoir.com/en/tenders-of-europe/projects/contract-supervision-wooden-boardwalk-modernisation-in-a-national-park-19968/"
id: 19968
country: "Poland"
city: "Kobylin-Borzymy"
region: "Podlaskie"
client: "Narwiański Park Narodowy"
type: "Service contract"
procedure: "Basic procedure (art. 275 pkt 2 of the Polish Public Procurement Law)"
deadline: "2026-11-27"
status: "closed"
days_left: -1
status_as_of: "2026-11-28"
disciplines: ["Project and construction management","Engineering"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df4588-2e58-95ce-c1c5-d500019456a7"
updated: "2026-11-18"
publisher: "Pelenoir – Tenders of Europe"
---

# Contract supervision: wooden boardwalk modernisation in a national park

> The client seeks a contract engineer to oversee the modernisation of a nature trail boardwalk in Narwiański National Park, including procurement, design coordination, [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/), and obtaining necessary permits for a new wooden or composite…

**Status (2026-11-28):** Closed 1 day ago — deadline 2026-11-27 10:00  
**Location:** Kobylin-Borzymy, Podlaskie, Poland  
**Contracting authority:** Narwiański Park Narodowy  
**Opportunity type:** Service contract — Basic procedure (art. 275 pkt 2 of the Polish Public Procurement Law)  
**CPV:** 71248000 Supervision of project and documentation; 71310000 Consultative engineering and construction services; 71520000 Construction supervision services; 71541000 Construction project management services; 71540000 Construction management services  

## About the project

The client seeks a contract engineer to oversee the modernisation of a nature trail boardwalk in Narwiański National Park, including procurement, design coordination, construction supervision, and obtaining necessary permits for a new wooden or composite structure.

## Scope of work

The contract engineer will manage the procurement of a design-build contractor, prepare contracts, supervise design and construction documentation, obtain permits, monitor construction progress, ensure compliance with engineering standards, and handle final acceptance and reporting for a wooden boardwalk modernisation project.

### Deliverables

- Procurement procedure for a design-build contractor
- Contract and financial schedules for design and construction phases
- Design documentation (building permit design, demolition design, technical and execution designs, branch designs) with technical specifications
- Permits (water law permit, building permit, demolition permit, site handover, occupancy permit)
- Regular site inspections and progress reports
- Final acceptance documentation and occupancy permit
- Quarterly and final project reports

### Required services

- Project management
- Construction supervision
- Contract administration
- Permit coordination
- Technical and financial reporting

## Pelenoir assessment

This project primarily involves project and construction management services for the modernisation of a wooden boardwalk in a national park, including procurement, design coordination, permit acquisition, and construction supervision. A secondary focus is on technical engineering oversight, particularly structural and hydrotechnical aspects, to ensure compliance with design and construction standards.

## How to take part

### Who can apply

- Experience in contract engineering or similar roles for at least two completed projects (minimum value PLN 80,000 each) involving wooden or composite tourist, recreational, or cultural infrastructure in the last 5 years
- Contract engineer must hold unlimited construction licenses in structural or hydrotechnical engineering and have managed at least two similar supervision teams in the last 5 years
- Construction supervision inspector must hold unlimited structural or hydrotechnical engineering licenses and have supervised at least one similar project (minimum value PLN 50,000) in the last 5 years
- Public procurement expert must hold a higher education degree and have participated in at least three procurement procedures, including two above EU thresholds, in the last 5 years

### What to submit

- Completed offer form (zał. nr 3 do SWZ)
- Statement on non-exclusion and meeting participation conditions (zał. nr 2a do SWZ)
- List of completed services (zał. nr 5 do SWZ) with supporting documents
- List of personnel assigned to the project (zał. nr 6a and 6b do SWZ) with qualifications and experience details
- Bid bond of PLN 5,000
- Documents in Polish

### Award criteria

- Price (60% weight)
- Experience of the construction supervision inspector in [structural engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) (20% weight)
- Frequency of the contract engineer's presence on the construction site (20% weight)

## Tender documents

The visible document package includes 14 files: two ZIP archives likely containing design briefs and concept drawings for the boardwalk ('zał. 1 do OPZ PFU.zip' and 'zał. 2 do OPZ Koncepcja kładki.zip'), a detailed project description ('zał. nr 1 do SWZ.pdf'), and standard procurement forms such as offer templates, eligibility declarations, and personnel lists. The package also contains the main tender notice, contract terms (PPU), and compliance documents. The ZIP files probably hold technical drawings, site plans, or 3D models, but their exact contents cannot be confirmed without access. The remaining files are administrative and procedural documents required for submission.

## Disciplines

- **Project and construction management** (primary, 80%): Contract supervision, procurement management, design coordination, permit acquisition, construction monitoring, compliance assurance, and final acceptance for the wooden boardwalk modernisation project.
- **Engineering** (secondary, 20%): Technical oversight of structural and hydrotechnical engineering aspects, including review of design documentation, compliance with engineering standards, and assurance of technical specifications for the wooden or composite boardwalk.

## Related projects

- [Road network upgrade: regional transport hub accessibility for Opole](https://pelenoir.com/en/tenders-of-europe/projects/road-network-upgrade-regional-transport-hub-accessibility-for-opole-20215/) — Opole, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Stormwater retention basins: flood resilience upgrade for Radom](https://pelenoir.com/en/tenders-of-europe/projects/stormwater-retention-basins-flood-resilience-upgrade-for-radom-19753/) — Radom, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Heritage culture centre: multi-discipline supervision for modernisation and conversion](https://pelenoir.com/en/tenders-of-europe/projects/heritage-culture-centre-multi-discipline-supervision-for-20822/) — Ząbkowice Śląskie, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Sanitary sewer network: 1 km new gravity pipeline for Strzyżów](https://pelenoir.com/en/tenders-of-europe/projects/sanitary-sewer-network-1-km-new-gravity-pipeline-for-strzyzow-20207/) — Strzyżów, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Eco-education centre: construction supervision for a new forest-themed hub](https://pelenoir.com/en/tenders-of-europe/projects/eco-education-centre-construction-supervision-for-a-new-forest-themed-19957/) — Łask, Poland · Service contract · deadline 2026-11-26 (closed 2 days ago)
- [Building supervision: modernisation and lift for a family support centre](https://pelenoir.com/en/tenders-of-europe/projects/building-supervision-modernisation-and-lift-for-a-family-support-19951/) — Wieluń, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df4588-2e58-95ce-c1c5-d500019456a7  
Original title: Pełnienie funkcji Inżyniera Kontraktu przy realizacji projektu Modernizacja ścieżki przyrodniczej Kładka wśród bagien w Narwiańskim Parku Narodowym etap II - budowa odcinka przy OEP Młynarzówka - 2

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/contract-supervision-wooden-boardwalk-modernisation-in-a-national-park-19968/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
