---
title: "Construction supervision for Suchy Potok road link in Bielsko-Biała"
url: "https://pelenoir.com/en/tenders-of-europe/projects/construction-supervision-for-suchy-potok-road-link-in-bielsko-biala-14052/"
id: 14052
country: "Poland"
city: "Bielsko-Biała"
region: "Śląskie"
client: "Miasto Bielsko-Biała - Miejski Zarząd Dróg w Bielsku-Białej"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 2 of the Polish Public Procurement Law)"
deadline: "2026-10-20"
status: "closed"
days_left: -40
status_as_of: "2026-11-29"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df25d4-0cce-e6d8-5997-b2000113600d"
updated: "2026-10-09"
publisher: "Pelenoir – Tenders of Europe"
---

# Construction supervision for Suchy Potok road link in Bielsko-Biała

> Bielsko-Biała’s new road link will only work if the supervision team catches the small mistakes before they become big ones.

**Status (2026-11-29):** Closed 40 days ago — deadline 2026-10-20 10:00  
**Location:** Bielsko-Biała, Śląskie, Poland  
**Contracting authority:** Miasto Bielsko-Biała - Miejski Zarząd Dróg w Bielsku-Białej  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 2 of the Polish Public Procurement Law)  
**CPV:** 71520000 Construction supervision services; 71540000 Construction management services  

## About the project

Contract for [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (Inżynier Kontraktu) during the building of a new road section connecting Wyzwolenia Street to the service road of the Suchy Potok road junction in Bielsko-Biała. The role includes quality control, compliance verification, progress monitoring, and contract administration for road, utility, and engineering works.

## Why it matters

A smoothly built road connects daily routes without disruption, but the supervision team decides how well it holds up over time.

## Scope of work

The contract requires the provision of construction supervision services (Inżynier Kontraktu) for a road construction project. The scope includes monitoring compliance with design and legal requirements, quality control of [construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/), participation in technical inspections and acceptance procedures, contract administration, and coordination with utility network managers.

### Deliverables

- Construction supervision reports
- Quality control documentation
- Progress monitoring records
- Contract administration files
- Final acceptance documentation

### Required services

- Construction supervision (inspektor nadzoru inwestorskiego)
- Contract administration
- Quality assurance and control
- Progress monitoring and reporting
- Coordination with utility network managers

## Pelenoir assessment

The project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as it involves construction supervision, contract administration, and quality control for a road infrastructure project. No other AEC business groups are supported by the extracted scope, which is exclusively focused on management and oversight services.

## How to take part

### Who can apply

- At least one person with road engineering supervision qualifications (uprawnienia budowlane inżynieryjne drogowe) and 9 months of experience on a road construction project valued at minimum PLN 6,000,000 gross
- At least one person with 9 months of experience in contract settlement for a construction project valued at minimum PLN 6,000,000 gross
- No overlap between the roles of road supervision inspector, contract settlement specialist, and resident engineer

### What to submit

- Completed offer form (Formularz oferty)
- Personnel list (Wykaz osób "Personel") with qualifications and experience details
- Documents confirming eligibility and non-exclusion (e.g., KRS/CEIDG extracts)
- Bid bond (wadium) of PLN 4,500

### Award criteria

- Price (60% weight)
- Experience and qualifications of personnel assigned to the contract (40% weight)

## Tender documents

The visible document package includes five files: three PDFs and two ZIP archives. The PDFs likely contain the tender conditions (Specyfikacja Warunków Zamówienia - SWZ), including general instructions, technical requirements, and a template for the technical and economic report (TER). The ZIP files appear to provide editable versions of the submission forms and the draft contract. The files are labeled as chapters of the SWZ, suggesting they cover procurement rules, scope of work, and contractual terms. However, the exact contents of the ZIP archives remain unknown without download, and no detailed drawings or technical plans are explicitly visible in the filenames.

## Disciplines

- **Project and construction management** (primary, 100%): Provision of construction supervision (Inżynier Kontraktu) for the road construction project, including quality control, compliance verification, progress monitoring, contract administration, and coordination with utility network managers.

## Related projects

- [Road junction expansion: investor supervision for national road upgrade near Korzeniste](https://pelenoir.com/en/tenders-of-europe/projects/road-junction-expansion-investor-supervision-for-national-road-19353/) — Korzeniste, Poland · Service contract · deadline 2026-11-25 (closed 4 days ago)
- [Sailing marina construction: lakeside facility with landscaping in Mrągowo](https://pelenoir.com/en/tenders-of-europe/projects/sailing-marina-construction-lakeside-facility-with-landscaping-in-20661/) — Mrągowo, Poland · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Eco-education centre: construction supervision for a new forest-themed hub](https://pelenoir.com/en/tenders-of-europe/projects/eco-education-centre-construction-supervision-for-a-new-forest-themed-19957/) — Łask, Poland · Service contract · deadline 2026-11-26 (closed 3 days ago)
- [Primary school thermal retrofit: investor supervision for energy-efficient upgrade](https://pelenoir.com/en/tenders-of-europe/projects/primary-school-thermal-retrofit-investor-supervision-for-energy-19965/) — Ziębice, Poland · Service contract · deadline 2026-11-26 (closed 3 days ago)
- [Heritage wooden buildings turned into education and culture centre](https://pelenoir.com/en/tenders-of-europe/projects/heritage-wooden-buildings-turned-into-education-and-culture-centre-19568/) — Bodzentyn, Poland · Service contract · deadline 2026-11-30 (closes tomorrow)
- [Heritage town hall renovation: investor supervision for Mrągowo’s historic city hall](https://pelenoir.com/en/tenders-of-europe/projects/heritage-town-hall-renovation-investor-supervision-for-mragowos-20214/) — Mrągowo, Poland · Service contract · deadline 2026-11-27 (closed 2 days ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df25d4-0cce-e6d8-5997-b2000113600d  
Original title: Pełnienie funkcji Inżyniera Kontraktu dla zadania pn.: „Budowa ulicy od skrzyżowania z ul. Wyzwolenia do drogi serwisowej węzła drogowego Suchy Potok...”-pełna nazwa w dokumentach zamówienia

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/construction-supervision-for-suchy-potok-road-link-in-bielsko-biala-14052/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
