---
title: "Construction of RES infrastructure for Brama Podhala Energy Cluster development"
url: "https://pelenoir.com/en/tenders-of-europe/projects/construction-of-res-infrastructure-for-brama-podhala-energy-cluster-12879/"
id: 12879
country: "Poland"
city: "Rabka-Zdrój"
region: "Małopolskie"
client: "Gmina Rabka-Zdrój (on behalf of: Gmina Rabka-Zdrój, Gmina Bystra-Sidzina, Miasto i Gmina Czarny Dunajec, Miasto Jordanów, Gmina Raba Wyżna)"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)"
deadline: "2026-10-08"
status: "closed"
days_left: -51
status_as_of: "2026-11-28"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df19fb-534d-783a-db89-6a0001469026"
updated: "2026-09-24"
publisher: "Pelenoir – Tenders of Europe"
---

# Construction of RES infrastructure for Brama Podhala Energy Cluster development

> Construction of [renewable energy](https://pelenoir.com/en/tenders-of-europe/typologies/energy-and-utilities/) sources (RES) infrastructure, including photovoltaic installations and air-source heat pumps, to support the operational development of the Brama Podhala Energy Cluster.

**Status (2026-11-28):** Closed 51 days ago — deadline 2026-10-08 16:00  
**Location:** Rabka-Zdrój, Małopolskie, Poland  
**Contracting authority:** Gmina Rabka-Zdrój (on behalf of: Gmina Rabka-Zdrój, Gmina Bystra-Sidzina, Miasto i Gmina Czarny Dunajec, Miasto Jordanów, Gmina Raba Wyżna)  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)  
**CPV:** 71520000 Construction supervision services; 71247000 Supervision of building work; 71631300; 72220000; 71310000 Consultative engineering and construction services  

## About the project

Construction of renewable energy sources (RES) infrastructure, including photovoltaic installations and air-source heat pumps, to support the operational development of the Brama Podhala Energy Cluster. The project involves investor supervision over the implementation of the infrastructure across five municipalities in the Małopolskie region.

## Scope of work

Comprehensive investor supervision services for the construction of RES infrastructure, including verification of design documentation, oversight of installation works for photovoltaic systems and air-source heat pumps, and coordination of technical and [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) across multiple municipalities.

### Deliverables

- Investor supervision services for RES infrastructure construction
- Verification of design documentation (construction, electrical, and sanitary branches)
- Oversight of installation works for at least 100 photovoltaic systems and 30 air-source heat pumps
- Coordination of technical and construction supervision

### Required services

- construction supervision
- technical supervision
- design documentation verification
- project coordination

## Pelenoir assessment

The project scope is exclusively focused on investor supervision and project management services for the construction of renewable energy infrastructure. No architectural, [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/), or other AEC disciplines are directly supported by the extracted facts.

## How to take part

### Who can apply

- Annual revenue of at least PLN 500,000 for the last three years
- Experience in providing comprehensive investor supervision for at least two projects involving installation of photovoltaic systems and air-source heat pumps
- Team of at least 4 qualified professionals with specified experience and certifications in construction, electrical, and sanitary branches
- Compliance with Polish Public Procurement Law requirements

### What to submit

- Completed offer form (Załącznik nr 3 do SWZ)
- Qualified electronic signature or trusted signature
- Documentation confirming eligibility and experience (e.g., references, financial statements, team qualifications)
- Declaration of non-exclusion from the procurement process (Załącznik nr 4 do SWZ)
- Documents in Polish language

### Award criteria

- Price (60% weight)
- Experience of assigned supervision inspectors (40% weight)

## Disciplines

- **Project and construction management** (primary, 100%): Comprehensive investor supervision for the construction of renewable energy infrastructure, including verification of design documentation, oversight of installation works for photovoltaic systems and air-source heat pumps, and coordination of technical and construction supervision across multiple municipalities.

## Related projects

- [County road reconstruction: 800-metre rebuild plus junction upgrade](https://pelenoir.com/en/tenders-of-europe/projects/county-road-reconstruction-800-metre-rebuild-plus-junction-upgrade-20429/) — Puck, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Contract supervision: wooden boardwalk modernisation in a national park](https://pelenoir.com/en/tenders-of-europe/projects/contract-supervision-wooden-boardwalk-modernisation-in-a-national-park-19968/) — Kobylin-Borzymy, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Road junction expansion: investor supervision for national road upgrade near Korzeniste](https://pelenoir.com/en/tenders-of-europe/projects/road-junction-expansion-investor-supervision-for-national-road-19353/) — Korzeniste, Poland · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Heritage wooden buildings turned into education and culture centre](https://pelenoir.com/en/tenders-of-europe/projects/heritage-wooden-buildings-turned-into-education-and-culture-centre-19568/) — Bodzentyn, Poland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Town hall energy retrofit: historic building upgraded with insulation and systems overhaul](https://pelenoir.com/en/tenders-of-europe/projects/town-hall-energy-retrofit-historic-building-upgraded-with-insulation-20662/) — Reszel, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Cycle and footpath construction: expanding a regional road for active travel](https://pelenoir.com/en/tenders-of-europe/projects/cycle-and-footpath-construction-expanding-a-regional-road-for-active-20218/) — Warszawa, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df19fb-534d-783a-db89-6a0001469026  
Original title: Nadzór inwestorski nad realizacją projektu „Budowa infrastruktury OZE dla rozwoju funkcjonowania Klastra Energii Brama Podhala – projekt demonstracyjny”

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/construction-of-res-infrastructure-for-brama-podhala-energy-cluster-12879/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
