---
title: "Cobh Public Realm Regeneration Phase 1"
url: "https://pelenoir.com/en/tenders-of-europe/projects/cobh-public-realm-regeneration-phase-1-18405/"
id: 18405
country: "Ireland"
city: "Cobh"
client: "Cork County Council"
type: "Service contract"
procedure: "Open"
deadline: "2026-12-11"
status: "open"
days_left: 13
status_as_of: "2026-11-28"
value: "EUR 700 000"
disciplines: ["Engineering","Urban design and planning","Landscape architecture","Project and construction management"]
source: "Irish eTenders"
source_url: "https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=9450075"
updated: "2026-11-10"
publisher: "Pelenoir – Tenders of Europe"
---

# Cobh Public Realm Regeneration Phase 1

> Regeneration of public realm in Cobh, including design, procurement, and construction stages for an engineering-led multi-disciplinary design team appointment.

**Status (2026-11-28):** 13 days left to apply — deadline 2026-12-11 12:00  
**Location:** Cobh, Ireland  
**Contracting authority:** Cork County Council  
**Opportunity type:** Service contract — Open  
**Declared value:** EUR 700 000  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Regeneration of public realm in Cobh, including design, procurement, and construction stages for an engineering-led multi-disciplinary design team appointment.

## Scope of work

Appointment of a single service provider as an engineering-led multi-disciplinary design team, including PSDP and Employer's Representative, to complete design (Stages IIC–V), procurement, and construction for Cobh Public Realm Regeneration Phase 1.

### Deliverables

- Design for public realm regeneration (Stages IIC–V)
- Procurement support
- Construction oversight

### Required services

- [civil engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- multi-disciplinary design
- project supervision (PSDP)
- employer's representation

## Pelenoir assessment

The project is primarily an engineering-led multi-disciplinary effort focused on the regeneration of Cobh's public realm. The scope explicitly supports civil engineering, [urban design](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/), [landscape architecture](https://pelenoir.com/en/tenders-of-europe/disciplines/landscape-architecture/), and [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) disciplines, with civil engineering as the dominant component. The absence of detailed design documents limits certainty on the exact balance of disciplines, but the stated requirements and typologies justify the assigned groups.

## How to take part

### Award criteria

- Most Economically Advantageous Tender (MEAT)

## Disciplines

- **Engineering** (primary, 60%): Civil engineering design, technical planning, and infrastructure works for the public realm regeneration, including roadworks, drainage, utilities, and structural elements.
- **Urban design and planning** (secondary, 20%): Urban design and spatial planning for the public realm, including pedestrian zones, traffic management, and integration of public spaces within the regeneration area.
- **Landscape architecture** (secondary, 15%): Landscape design for open spaces, planting, street furniture, and outdoor environment enhancements within the public realm regeneration.
- **Project and construction management** (secondary, 5%): Project supervision (PSDP), employer's representation, procurement support, and construction oversight for the delivery of the public realm regeneration.

## Related projects

- [Road junction upgrade: traffic modelling and safety redesign north of Kinsale](https://pelenoir.com/en/tenders-of-europe/projects/road-junction-upgrade-traffic-modelling-and-safety-redesign-north-of-20643/) — Kinsale, Ireland · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Kajave high-voltage electricity network design and expert services](https://pelenoir.com/en/tenders-of-europe/projects/kajave-high-voltage-electricity-network-design-and-expert-services-19065/) — Kajaani, Finland · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Stormwater and meltwater management plan for Półwieś canal catchment](https://pelenoir.com/en/tenders-of-europe/projects/stormwater-and-meltwater-management-plan-for-polwies-canal-catchment-19973/) — Opole, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Road rehabilitation: four county roads modernised in Bistrița-Năsăud](https://pelenoir.com/en/tenders-of-europe/projects/road-rehabilitation-four-county-roads-modernised-in-bistrita-nasaud-20245/) — Bistrița, Romania · Service contract · deadline 2026-12-29 (31 days left to apply)
- [Road rehabilitation: technical studies and design for county road DJ 665C](https://pelenoir.com/en/tenders-of-europe/projects/road-rehabilitation-technical-studies-and-design-for-county-road-dj-19365/) — Târgu Jiu, Romania · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Geotechnical assessment and erosion control for landslide-affected area in Fauske](https://pelenoir.com/en/tenders-of-europe/projects/geotechnical-assessment-and-erosion-control-for-landslide-affected-9783/) — Fauske, Norway · Service contract · deadline 2028-01-01 (399 days left to apply)

## Source

Original notice on Irish eTenders: https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=9450075  
Original title: Single Service Provider, Engineering Led Multi-Disciplinary Design Team - Stages (iic - v) for Cobh Public Realm Regeneration Phase 1

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/cobh-public-realm-regeneration-phase-1-18405/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
