---
title: "Brétignolles-sur-Mer Church Quarter Master Plan and Health Centre Extension"
url: "https://pelenoir.com/en/tenders-of-europe/projects/bretignolles-sur-mer-church-quarter-master-plan-and-health-centre-9999/"
id: 9999
country: "France"
city: "Brétignolles-sur-Mer"
region: "Pays de la Loire"
client: "Commune de Brétignolles-sur-Mer"
type: "Design contest"
procedure: "Restricted competition (concours restreint sur esquisse)"
deadline: "2026-10-14"
status: "closed"
days_left: -45
status_as_of: "2026-11-28"
value: "EUR 3.5 m"
disciplines: ["Urban design and planning","Architecture"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-88702"
updated: "2026-09-15"
publisher: "Pelenoir – Tenders of Europe"
---

# Brétignolles-sur-Mer Church Quarter Master Plan and Health Centre Extension

> A plan-guide is a promise, not just a drawing.

**Status (2026-11-28):** Closed 45 days ago — deadline 2026-10-14 12:00  
**Location:** Brétignolles-sur-Mer, Pays de la Loire, France  
**Contracting authority:** Commune de Brétignolles-sur-Mer  
**Opportunity type:** Design contest — Restricted competition (concours restreint sur esquisse)  
**Declared value:** EUR 3.5 m  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Restricted [design competition](https://pelenoir.com/en/tenders-of-europe/types/design-contests/) for the development of a [master plan](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) (plan-guide) for the Church Quarter and the extension of the university multi-professional [health centre](https://pelenoir.com/en/tenders-of-europe/typologies/healthcare/) in Brétignolles-sur-Mer. The project includes architectural and urban design services for a planned construction cost of €3.5 million (excluding VAT).

## Why it matters

A master plan called a ‘plan-guide’ is a promise to the town. Your team’s first task is to show how you’ll steer future projects without dictating them.

> The restricted competition selects teams on ‘professional competence and experience’—not a portfolio or fee. The brief calls the master plan a ‘plan-guide’.

This isn’t a static drawing; it’s a living document that will steer future projects. Your first task is to show how your team navigates that expectation.

## Scope of work

Restricted design competition for the elaboration of a master plan (plan-guide) for the Church Quarter and the extension of the university multi-professional health centre. The competition is based on preliminary sketches (esquisse). Required services include urban planning, [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/), and coordination of technical studies. The project is divided into phases as per the French public procurement code for design competitions.

### Deliverables

- master plan (plan-guide) for the Church Quarter
- architectural and [technical design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) for the health centre extension
- preliminary sketches (esquisse)

### Required services

- urban planning and design
- architectural design
- technical studies coordination
- mastery of works (maîtrise d'œuvre)

## Pelenoir assessment

This project primarily involves urban design and planning for a master plan of the Church Quarter, complemented by architectural design for the extension of a healthcare facility. The scope is divided between urban-scale planning and building-specific design, with no evidence of other AEC disciplines such as engineering, [interior design](https://pelenoir.com/en/tenders-of-europe/disciplines/interior-architecture/), or [construction management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) in the extracted facts.

## How to take part

### Who can apply

- open to qualified design teams
- selection based on professional competence and experience
- shortlist of 3 candidates

### What to submit

- submission of preliminary sketches (esquisse)
- professional qualifications and references
- compliance with French public procurement regulations

## Disciplines

- **Urban design and planning** (primary, 60%): Development of a master plan (plan-guide) for the Church Quarter, including spatial planning, urban design, and public-realm integration to guide future development in the area.
- **Architecture** (secondary, 40%): Architectural design for the extension of the university multi-professional health centre, including conceptual and technical design work for the new construction.

## Related projects

- [Marseille urban logistics platform pre-studies](https://pelenoir.com/en/tenders-of-europe/projects/marseille-urban-logistics-platform-pre-studies-16949/) — Marseille, France · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Public Space Redevelopment in Saint-Pol-sur-Mer](https://pelenoir.com/en/tenders-of-europe/projects/public-space-redevelopment-in-saint-pol-sur-mer-17891/) — Dunkerque, France · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Infrastructure master planning for Bezons and CCAS](https://pelenoir.com/en/tenders-of-europe/projects/infrastructure-master-planning-for-bezons-and-ccas-17895/) — Bezons, France · Service contract · deadline 2026-12-07 (9 days left to apply)
- [Haut Cortel and ORI buildings redevelopment concession](https://pelenoir.com/en/tenders-of-europe/projects/haut-cortel-and-ori-buildings-redevelopment-concession-16353/) — Joigny, France · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Business park expansion: masterplanning and design for new and upgraded sites](https://pelenoir.com/en/tenders-of-europe/projects/business-park-expansion-masterplanning-and-design-for-new-and-19944/) — Muzillac, France · Service contract · deadline 2026-12-21 (23 days left to apply)
- [Festival hall: new 1,200 m² multi-use venue with outdoor covered space](https://pelenoir.com/en/tenders-of-europe/projects/festival-hall-new-1-200-m2-multi-use-venue-with-outdoor-covered-space-19945/) — Wintzenheim, France · Design contest · deadline 2026-12-22 (24 days left to apply)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-88702  
Original title: Concours restreint de maîtrise d’œuvre l’élaboration d’un plan-guide du quartier de l’Eglise et l’extension de la maison de santé pluriprofessionnelle universitaire. à Brétignolles-sur-Mer (85)

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/bretignolles-sur-mer-church-quarter-master-plan-and-health-centre-9999/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
