---
title: "Bicycle path along national road 57 in Biskupiec"
url: "https://pelenoir.com/en/tenders-of-europe/projects/bicycle-path-along-national-road-57-in-biskupiec-18459/"
id: 18459
country: "Poland"
city: "Biskupiec"
region: "Warmian-Masurian"
client: "GMINA BISKUPIEC"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 ustawy)"
deadline: "2026-11-19"
status: "closed"
days_left: -9
status_as_of: "2026-11-28"
value: "PLN 229 000 (≈ EUR 51 346)"
disciplines: ["Architecture","Engineering"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df3efa-1b90-4d1d-c1c5-d5000193f531"
updated: "2026-11-10"
publisher: "Pelenoir – Tenders of Europe"
---

# Bicycle path along national road 57 in Biskupiec

> A bicycle path’s accessibility compliance turns a linear route into a daily contract with its users.

**Status (2026-11-28):** Closed 9 days ago — deadline 2026-11-19 10:15  
**Location:** Biskupiec, Warmian-Masurian, Poland  
**Contracting authority:** GMINA BISKUPIEC  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 ustawy)  
**Declared value:** PLN 229 000 (≈ EUR 51 346)  
**CPV:** 71220000 Architectural design services  

## About the project

Preparation of complete design documentation for the construction of a bicycle path along national road 57, from the intersection of Niepodległości and Kościuszki streets to Czerwonka. The design must comply with accessibility requirements for people with disabilities and universal design principles.

## Why it matters

Accessibility compliance (art. 100 ustawy pzp) turns a bicycle path into a daily contract with its users, setting constraints before design begins.

> The tender for a bicycle path along national road 57 in Biskupiec specifies that documentation must comply with art. 100 of [Poland](https://pelenoir.com/en/tenders-of-europe/countries/poland/)’s Public Procurement Law, making accessibility a mandatory requirement.

This reveals how [landscape architecture](https://pelenoir.com/en/tenders-of-europe/disciplines/landscape-architecture/) briefs often embed legal constraints as the first layer of design, turning compliance into a daily contract with users before the first sketch is drawn.

## Scope of work

Preparation of complete design documentation for a bicycle path along national road 57, including compliance with accessibility standards and universal design. The documentation must be based on the provided concept and terms of reference (OPZ). The project includes coordination with the General Directorate for National Roads and Motorways (GDDKiA).

### Deliverables

- complete design documentation for bicycle path construction
- documentation compliant with accessibility requirements (art. 100 ustawy pzp)

### Required services

- [architectural design services](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) (CPV 71220000-6)
- [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) for road infrastructure

## Pelenoir assessment

This project primarily involves the preparation of design documentation for a bicycle path, combining architectural design (with a focus on accessibility and universal design) and engineering planning for road infrastructure integration. The scope explicitly supports both ARCHITECTURE_AND_DESIGN and ENGINEERING_AND_TECHNICAL_PLANNING disciplines.

## How to take part

### Who can apply

- Contractor must designate a person with road engineering design qualifications (unrestricted or limited) under Polish construction law
- Contractor must submit a statement of non-exclusion under art. 125 ust. 1 ustawy pzp and art. 7 ust. 1 of the Act on special solutions for counteracting support for aggression against [Ukraine](https://pelenoir.com/en/tenders-of-europe/countries/ukraine/)

### What to submit

- Completed and signed offer form (załącznik nr 1 do SWZ)
- Statement of non-exclusion (art. 125 ust. 1 ustawy pzp)
- Power of attorney (if applicable)
- Bid bond of 3,000 PLN (wadium)

### Award criteria

- Price (60% weight)
- Qualifications and experience of the designated person (40% weight): 0-1 completed design documentations (2022-2026) – 0 points, 2-3 documentations – 20 points, 4+ documentations – 40 points

## Tender documents

The visible document package includes three files: one PDF titled '01 ogłoszenie o zamówieniu.pdf' likely containing the official tender notice and procedural details. Two ZIP archives are present: 'Opis zakresu, koncepcja Kś.zip' probably contains the project scope description, concept, and terms of reference (OPZ) for the bicycle path design. The second ZIP, 'SWZ i załączniki (f.oferty, ośw., wzór umowy) Kś.zip', likely includes the tender specifications (SWZ), offer form templates, non-exclusion statements, and a draft contract. The exact contents of the ZIP files cannot be confirmed without access, but their filenames suggest standard procurement documentation and design briefs.

## Disciplines

- **Architecture** (primary, 60%): Preparation of architectural design documentation for the bicycle path, including compliance with accessibility standards and universal design principles, as well as coordination with road infrastructure requirements.
- **Engineering** (secondary, 40%): Engineering design for the bicycle path, including structural and technical coordination with the adjacent national road 57 and integration with existing infrastructure.

## Related projects

- [Indoor shooting range: new secure training facility for border guards](https://pelenoir.com/en/tenders-of-europe/projects/indoor-shooting-range-new-secure-training-facility-for-border-guards-20227/) — Białystok, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Community centre design: new village hall with outdoor spaces](https://pelenoir.com/en/tenders-of-europe/projects/community-centre-design-new-village-hall-with-outdoor-spaces-20220/) — Bogdanki, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Memorial to 1945 deportation victims: updated design for reinforced-concrete monument](https://pelenoir.com/en/tenders-of-europe/projects/memorial-to-1945-deportation-victims-updated-design-for-reinforced-20425/) — Katowice, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Heritage residential building retrofit: heating upgrade and accessibility adaptation](https://pelenoir.com/en/tenders-of-europe/projects/heritage-residential-building-retrofit-heating-upgrade-and-20806/) — Rybnik, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Multi-family housing complex: design and cost documentation for stage II](https://pelenoir.com/en/tenders-of-europe/projects/multi-family-housing-complex-design-and-cost-documentation-for-stage-19766/) — Brodnica, Poland · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [New municipal cemetery: full design documentation and planning permission](https://pelenoir.com/en/tenders-of-europe/projects/new-municipal-cemetery-full-design-documentation-and-planning-19950/) — Goczałkowice-Zdrój, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df3efa-1b90-4d1d-c1c5-d5000193f531  
Original title: Wykonanie dokumentacji projektowej - budowa ścieżki rowerowej wzdłuż drogi krajowej 57 od skrzyżowania ul. Niepodległości z ul. Kościuszki do Czerwonki.

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/bicycle-path-along-national-road-57-in-biskupiec-18459/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
