---
title: "AaltoAlvari Swimming Center Phase 4 Water Treatment Renovation"
url: "https://pelenoir.com/en/tenders-of-europe/projects/aaltoalvari-swimming-center-phase-4-water-treatment-renovation-18744/"
id: 18744
country: "Finland"
city: "Jyväskylä"
client: "the contracting authority's contact"
type: "Service contract"
procedure: "open procedure"
deadline: "2026-12-13"
status: "open"
days_left: 15
status_as_of: "2026-11-28"
value: "EUR 400 000"
disciplines: ["Engineering","Architecture","Sustainability"]
source: "HILMA"
source_url: "https://www.hankintailmoitukset.fi/en/public/procedure/39965/enotice/61644/"
updated: "2026-11-11"
publisher: "Pelenoir – Tenders of Europe"
---

# AaltoAlvari Swimming Center Phase 4 Water Treatment Renovation

> Renovation of the water treatment systems and related facilities in the historic AaltoAlvari Swimming Center, including the 25-meter pool, technical rooms, and water treatment areas.

**Status (2026-11-28):** 15 days left to apply — deadline 2026-12-13 13:00  
**Location:** Jyväskylä, Finland  
**Contracting authority:** the contracting authority's contact  
**Opportunity type:** Service contract — open procedure  
**Declared value:** EUR 400 000  
**CPV:** 71320000 Engineering design services  

## About the project

Renovation of the water treatment systems and related facilities in the historic AaltoAlvari Swimming Center, including the 25-meter pool, technical rooms, and water treatment areas. The project aims to extend the building's technical lifespan while preserving its cultural heritage values and minimizing operational disruptions during construction.

## Why it matters

Water treatment renovation for a heritage swimming center modernizes systems while respecting historic constraints.

## Scope of work

Design services for the renovation of water treatment systems in the AaltoAlvari Swimming Center, including conceptual planning (hankesuunnittelu), general and implementation planning, cost estimation, and construction-phase design. The project must respect the building's protected cultural heritage status and ensure minimal disruption to operations.

### Deliverables

- Conceptual plans (hankesuunnittelu)
- General and implementation design documents
- Cost estimates and construction-phase design materials
- Acceptance and warranty-period design documents

### Required services

- water treatment system design
- structural and technical system renovation planning
- heritage-compliant [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/)
- construction-phase design support

## Pelenoir assessment

The project primarily involves engineering and technical planning for the renovation of water treatment systems in a historic swimming center, with secondary requirements for heritage-compliant architectural design and [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) considerations. The scope is dominated by technical and structural upgrades, while preserving the building's cultural heritage.

## How to take part

### Who can apply

- Compliance with Finnish public procurement regulations
- Submission of ESPD (European Single Procurement Document)
- Fulfillment of minimum suitability and qualification requirements for the tenderer and key personnel

### What to submit

- Tender submission in Finnish
- Compliance with tender documents and appendices
- Submission via electronic procurement system

### Award criteria

- Most economically advantageous tender based on price and quality criteria specified in the tender documents

## Disciplines

- **Engineering** (primary, 60%): Design and planning of water treatment systems, including technical rooms, infrastructure, and structural integration to ensure compliance with operational and heritage preservation requirements.
- **Architecture** (secondary, 30%): Heritage-compliant architectural design to preserve the cultural values of the historic AaltoAlvari Swimming Center, including integration of new technical systems with minimal disruption to the existing structure.
- **Sustainability** (secondary, 10%): Ensuring the renovated water treatment systems meet sustainability and building performance standards, including energy efficiency and operational longevity.

## Related projects

- [Municipal infrastructure design services for roads, utilities and public spaces](https://pelenoir.com/en/tenders-of-europe/projects/municipal-infrastructure-design-services-for-roads-utilities-and-20244/) — Lohja, Finland · Service contract · deadline 2027-01-11 (44 days left to apply)
- [HVAC supervision for a summer camp renovation](https://pelenoir.com/en/tenders-of-europe/projects/hvac-supervision-for-a-summer-camp-renovation-19204/) — Joensuu, Finland · Service contract · deadline 2026-12-07 (9 days left to apply)
- [Pirkanmaa Wellbeing Services County Equipment and Process Planning](https://pelenoir.com/en/tenders-of-europe/projects/pirkanmaa-wellbeing-services-county-equipment-and-process-planning-17018/) — Tampere, Finland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Joensuu Traffic Studies and Plans 2027-2028](https://pelenoir.com/en/tenders-of-europe/projects/joensuu-traffic-studies-and-plans-2027-2028-18252/) — Joensuu, Finland · Service contract · deadline 2026-12-08 (10 days left to apply)
- [High-voltage power network design and expert services](https://pelenoir.com/en/tenders-of-europe/projects/high-voltage-power-network-design-and-expert-services-19208/) — Kajaani, Finland · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Lieksanjoki Bridge RS-Phase Geotechnical Investigations](https://pelenoir.com/en/tenders-of-europe/projects/lieksanjoki-bridge-rs-phase-geotechnical-investigations-17938/) — Lieksa, Finland · Service contract · deadline 2026-12-07 (9 days left to apply)

## Source

Original notice on HILMA: https://www.hankintailmoitukset.fi/en/public/procedure/39965/enotice/61644/  
Original title: Vesiliikuntakeskus AaltoAlvarin peruskorjauksen vaihe 4, vedenkäsittelysuunnittelu

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/aaltoalvari-swimming-center-phase-4-water-treatment-renovation-18744/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
