---
title: "AaltoAlvar Swimming Center Phase 4 Electrical Design"
url: "https://pelenoir.com/en/tenders-of-europe/projects/aaltoalvar-swimming-center-phase-4-electrical-design-18743/"
id: 18743
country: "Finland"
city: "Jyväskylä"
client: "the contracting authority's contact"
type: "Service contract"
procedure: "open procedure"
deadline: "2026-12-13"
status: "open"
days_left: 15
status_as_of: "2026-11-28"
value: "EUR 400 000"
disciplines: ["Engineering"]
source: "HILMA"
source_url: "https://www.hankintailmoitukset.fi/en/public/procedure/39967/enotice/61646/"
updated: "2026-11-11"
publisher: "Pelenoir – Tenders of Europe"
---

# AaltoAlvar Swimming Center Phase 4 Electrical Design

> Electrical design for a heritage swimming center means adapting systems to modern standards while preserving Aalto’s features.

**Status (2026-11-28):** 15 days left to apply — deadline 2026-12-13 13:00  
**Location:** Jyväskylä, Finland  
**Contracting authority:** the contracting authority's contact  
**Opportunity type:** Service contract — open procedure  
**Declared value:** EUR 400 000  
**CPV:** 71320000 Engineering design services  

## About the project

Electrical design services for the Phase 4 renovation of the AaltoAlvar Swimming Center, a culturally and historically significant building designed by Alvar Aalto. The project includes the refurbishment of the original 1955 swimming hall section and related spaces such as pools, changing rooms, saunas, technical rooms, and water treatment areas. The renovation aims to extend the building's technical lifespan while preserving its heritage values and minimizing operational disruptions.

## Why it matters

Electrical design for a heritage swimming center adapts systems to modern standards while preserving Aalto’s features.

## Scope of work

Electrical design services for the Phase 4 renovation of the AaltoAlvar Swimming Center, including concept, general, and implementation design, cost estimation, construction-phase design, and post-construction tasks. The design must respect the building's heritage status and ensure operational continuity during construction. The project is divided into phases, with the client reserving the right to proceed to subsequent phases based on the approved concept design.

### Deliverables

- electrical design plans for renovation
- cost estimates and comparisons
- construction-phase design documentation
- commissioning and warranty-period design tasks

### Required services

- electrical [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- heritage-sensitive design adaptation
- phased renovation planning
- cost estimation and comparison

## Pelenoir assessment

The project scope is explicitly focused on electrical engineering design for the renovation of a heritage swimming center. The tender does not include architectural, interior, landscape, or other AEC disciplines beyond technical planning for electrical systems. The work is constrained by heritage preservation requirements and operational continuity needs during construction.

## How to take part

### Who can apply

- compliance with Finnish public procurement regulations
- submission of European Single Procurement Document (ESPD)

### What to submit

- tender submission in Finnish
- compliance with tender documents and appendices

### Award criteria

- most economically advantageous tender (price and quality)

## Disciplines

- **Engineering** (primary, 100%): Electrical engineering design for the renovation of the AaltoAlvar Swimming Center, including concept, implementation, and construction-phase design, cost estimation, and post-construction tasks. The focus includes adapting electrical systems to respect heritage preservation requirements while ensuring operational continuity.

## Related projects

- [Joensuu Traffic Studies and Plans 2027-2028](https://pelenoir.com/en/tenders-of-europe/projects/joensuu-traffic-studies-and-plans-2027-2028-18252/) — Joensuu, Finland · Service contract · deadline 2026-12-08 (10 days left to apply)
- [Katariina Swimming Pool HVAC and Water Treatment Design](https://pelenoir.com/en/tenders-of-europe/projects/katariina-swimming-pool-hvac-and-water-treatment-design-16179/) — Kotka, Finland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Mechanical, electrical and plumbing design for public building projects in Tampere](https://pelenoir.com/en/tenders-of-europe/projects/mechanical-electrical-and-plumbing-design-for-public-building-19982/) — Tampere, Finland · Service contract · deadline 2026-12-21 (23 days left to apply)
- [Heka building condition surveys and assessments](https://pelenoir.com/en/tenders-of-europe/projects/heka-building-condition-surveys-and-assessments-15807/) — Helsinki, Finland · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Tampere Foundation Engineering Services](https://pelenoir.com/en/tenders-of-europe/projects/tampere-foundation-engineering-services-19064/) — Tampere, Finland · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Renovation of AaltoAlvar Aquatic Center Phase 4 Structural Design](https://pelenoir.com/en/tenders-of-europe/projects/renovation-of-aaltoalvar-aquatic-center-phase-4-structural-design-18746/) — Jyväskylä, Finland · Service contract · deadline 2026-12-13 (15 days left to apply)

## Source

Original notice on HILMA: https://www.hankintailmoitukset.fi/en/public/procedure/39967/enotice/61646/  
Original title: Vesiliikuntakeskus AaltoAlvarin peruskorjauksen vaihe 4, sähkösuunnittelu

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/aaltoalvar-swimming-center-phase-4-electrical-design-18743/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
