---
title: "A12 Inntal Autobahn ÖBB Bridge Replacement Planning"
url: "https://pelenoir.com/en/tenders-of-europe/projects/a12-inntal-autobahn-obb-bridge-replacement-planning-18089/"
id: 18089
country: "Austria"
city: "Wörgl"
region: "Tyrol"
client: "the contracting authority's contact (ASFINAG)"
type: "Service contract"
procedure: "Open procedure (Offenes Verfahren)"
deadline: "2026-11-13"
status: "closed"
days_left: -15
status_as_of: "2026-11-28"
disciplines: ["Engineering","Project and construction management","Architecture"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-f847deb4-f42f-4860-94f2-a3147a880033"
updated: "2026-11-04"
publisher: "Pelenoir – Tenders of Europe"
---

# A12 Inntal Autobahn ÖBB Bridge Replacement Planning

> Replacement of two ÖBB [railway](https://pelenoir.com/en/tenders-of-europe/typologies/rail-and-public-transport/) overpasses on the A12 Inntal Autobahn, including design, execution, detail and as-built planning for [bridge](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) reconstruction under operational railway conditions and traffic management during construction in 2028.

**Status (2026-11-28):** Closed 15 days ago — deadline 2026-11-13  
**Location:** Wörgl, Tyrol, Austria  
**Contracting authority:** the contracting authority's contact (ASFINAG)  
**Opportunity type:** Service contract — Open procedure (Offenes Verfahren)  
**CPV:** 71322300  

## About the project

Replacement of two ÖBB railway overpasses on the A12 Inntal Autobahn, including design, execution, detail and as-built planning for bridge reconstruction under operational railway conditions and traffic management during construction in 2028.

## Scope of work

Design services for the replacement of two railway overpasses, including tender, execution, detail and as-built planning, demolition concept with ÖBB approval, and traffic management during construction in 2028.

### Deliverables

- tender planning documents
- execution planning documents
- detail planning documents
- as-built planning documents
- demolition concept with ÖBB approval
- traffic management concept for 2028 construction phase

### Required services

- bridge design
- [structural engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- traffic planning
- construction sequencing under railway operations

## Pelenoir assessment

This project is primarily an engineering and technical planning assignment for the replacement of two railway overpasses, with a strong focus on structural engineering, bridge design, and construction sequencing under operational conditions. Secondary scope includes project and [construction management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) for traffic and demolition coordination, as well as [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) for the bridge structures.

## How to take part

### Who can apply

- bidders must submit references for project managers and technical staff
- bidders must demonstrate experience in bridge planning and railway infrastructure
- consortia limited to maximum two members

### What to submit

- completed offer cover sheet (Deckblatt Angebot)
- signed bidder declaration (D.6_Bietererklärung)
- completed service description and bill of quantities (LV_D.1-D.6)
- calculation of hourly rates (Kalkulation_Verrechnungsstundensatz_Dienstleistungen_Muster.xlsx)
- project-specific planning and calculation documents (D.5.1_K1_Planung-Kunstbauten-Kalkulation)
- electronic submission via www.provia.at

### Award criteria

- offered net price (weighted criterion)
- offered quality (weighted criterion)
- project manager and deputy references for reference projects A and B (max 100 points each)
- technical staff references for reference project A (max 100 points)
- project manager, deputy and technical staff education and professional experience (max 100 points each)
- gender parity (max 100 points)

## Tender documents

The visible document package includes PDF files for general tender conditions (D.1_Allgemeine_Ausschreibungsbestimmungen), contract terms (D.4_Allgemeine_Vertragsbestimmungen), project description (D.2_Projektbeschreibung), bidder declaration forms (D.6_Bietererklärung), and detailed planning and calculation documents (D.5.1_K1_Planung-Kunstbauten-Kalkulation). An Excel template (Kalkulation_Verrechnungsstundensatz_Dienstleistungen_Muster.xlsx) is provided for hourly rate calculation. A large ZIP file (Pläne.zip) likely contains bridge design drawings and plans, though its exact contents cannot be confirmed without access. The package also includes offer cover sheets and a construction sequencing document (P094_K14_S1b_Bauablauf_c_1BER.pdf).

## Disciplines

- **Engineering** (primary, 70%): Structural engineering, bridge design, technical planning for railway overpass replacement, and coordination of construction under operational railway conditions.
- **Project and construction management** (secondary, 20%): Traffic management planning during construction, coordination of demolition and construction sequencing, and client representation for compliance with ÖBB safety and operational requirements.
- **Architecture** (secondary, 10%): Conceptual and detailed design of the bridge structures, including aesthetic and functional integration with the existing highway and railway infrastructure.

## Related projects

- [Linz Vbf West 4-track Western Railway Geotechnical Services](https://pelenoir.com/en/tenders-of-europe/projects/linz-vbf-west-4-track-western-railway-geotechnical-services-18055/) — Linz, Austria · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Motorway tunnel water hardness stabilisation: hydrogeochemical surveys for drainage upgrades](https://pelenoir.com/en/tenders-of-europe/projects/motorway-tunnel-water-hardness-stabilisation-hydrogeochemical-surveys-19705/) — Gratkorn, Austria · Service contract · deadline 2027-01-13 (46 days left to apply)
- [Tunnel safety assessments for seven Austrian motorway tunnels](https://pelenoir.com/en/tenders-of-europe/projects/tunnel-safety-assessments-for-seven-austrian-motorway-tunnels-19471/) — Ansfelden, Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [S8 Marchfeld Expressway West Section Noise Study](https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-noise-study-16570/) — Austria · Service contract · deadline 2026-12-07 (9 days left to apply)
- [Railway traffic impact study for selective two-track expansion](https://pelenoir.com/en/tenders-of-europe/projects/railway-traffic-impact-study-for-selective-two-track-expansion-20278/) — Stockerau, Austria · Service contract · deadline 2026-12-04 (6 days left to apply)
- [Hochwasserschutz Ill km 11.6 to 20.5 Execution Planning](https://pelenoir.com/en/tenders-of-europe/projects/hochwasserschutz-ill-km-11-6-to-20-5-execution-planning-19015/) — Feldkirch, Austria · Service contract · deadline 2026-12-11 (13 days left to apply)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-f847deb4-f42f-4860-94f2-a3147a880033  
Original title: A12 ERB K14 & S1b ÖBB-Überführung - Planungsleistungen

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/a12-inntal-autobahn-obb-bridge-replacement-planning-18089/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
