---
title: "A01 Linz-Haid Motorway EM Supervision"
url: "https://pelenoir.com/en/tenders-of-europe/projects/a01-linz-haid-motorway-em-supervision-16791/"
id: 16791
country: "Austria"
city: "Linz"
region: "Upper Austria"
client: "Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft (ASFINAG)"
type: "Service contract"
procedure: "open procedure (Offenes Verfahren)"
deadline: "2026-11-02"
status: "closed"
days_left: -27
status_as_of: "2026-11-29"
disciplines: ["Project and construction management","Engineering"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-3d29836d-681f-4f2a-9af6-9c759e55ca87"
updated: "2026-10-29"
publisher: "Pelenoir – Tenders of Europe"
---

# A01 Linz-Haid Motorway EM Supervision

> Supervision of electrical and mechanical (EM) infrastructure during the general refurbishment of the A01 [motorway](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) section between Linz and Haid, including new Traun junction.

**Status (2026-11-29):** Closed 27 days ago — deadline 2026-11-02  
**Location:** Linz, Upper Austria, Austria  
**Contracting authority:** Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft (ASFINAG)  
**Opportunity type:** Service contract — open procedure (Offenes Verfahren)  
**CPV:** 71520000 Construction supervision services  

## About the project

Supervision of electrical and mechanical (EM) infrastructure during the general refurbishment of the A01 motorway section between Linz and Haid, including new Traun junction. Covers all EM facilities such as traffic control systems, drainage, power and data connections, and [street lighting](https://pelenoir.com/en/tenders-of-europe/typologies/energy-and-utilities/), while ensuring interface reduction between projects.

## Scope of work

Supervision of electrical and mechanical (EM) systems for the A01 motorway section between Linz and Haid, including new Traun junction. Tasks include overseeing traffic control systems, drainage, power and data connections, and street lighting. Existing traffic management cross-sections are excluded except for power and data connections.

### Deliverables

- supervision of EM infrastructure installation and maintenance
- coordination of power and data connections for existing traffic management systems

### Required services

- [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (Örtliche Bauaufsicht)
- electrical and mechanical systems oversight

## Pelenoir assessment

This project primarily involves construction supervision and project management for the electrical and mechanical infrastructure of a motorway refurbishment. While the focus is on oversight and coordination, technical engineering expertise is also required to ensure compliance and functionality of EM systems.

## How to take part

### Who can apply

- bidders must submit reference projects related to personnel
- bidders must demonstrate qualifications in training and professional experience
- consortia allowed with maximum 2 members

### What to submit

- offers must be submitted in German
- electronic submission required via www.provia.at
- submission of completed tender documents and forms

### Award criteria

- lowest price (net total price according to documents)
- quality of the offer (according to documents)
- personnel-related reference projects (max. 100 points)
- training and professional experience (max. 100 points)
- personnel development (max. 100 points)
- gender parity (max. 100 points)

## Tender documents

The visible files likely include tender documents such as general contract conditions (e.g., 'OeBA-EM_162222_D.1_Allgemeine_Ausschreibungsbestimmungen.pdf'), project descriptions, and technical specifications for electrical and mechanical systems. There are also submission forms (e.g., 'OeBA-EM_162222_Angebotsdeckblatt_DL_OV.pdf') and personnel deployment plans. Large PDF files with names like 'A01_162222_EM_302506032_CN.as-01_LP_E_A_V00.pdf' suggest detailed plans or drawings for specific EM components. However, the exact content of these files cannot be confirmed without access, and some documents may require interpretation of Austrian technical terminology.

## Disciplines

- **Project and construction management** (primary, 80%): Supervision of electrical and mechanical (EM) infrastructure installation, maintenance, and coordination during the motorway refurbishment, including traffic control systems, drainage, power/data connections, and street lighting. Ensuring interface reduction between projects and compliance with technical specifications.
- **Engineering** (secondary, 20%): Technical oversight of electrical and mechanical systems, including power/data connections, drainage, and traffic control infrastructure, to ensure compliance with engineering standards and project requirements.

## Related projects

- [Motorway construction supervision: 3 km stretch of S3 expressway in Weinviertel](https://pelenoir.com/en/tenders-of-europe/projects/motorway-construction-supervision-3-km-stretch-of-s3-expressway-in-20095/) — Austria · Service contract · deadline 2026-11-30 (closes tomorrow)
- [Redesign of Salzburg City Center Meeting Zone](https://pelenoir.com/en/tenders-of-europe/projects/redesign-of-salzburg-city-center-meeting-zone-18581/) — Salzburg, Austria · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Construction supervision for new social pedagogical centre](https://pelenoir.com/en/tenders-of-europe/projects/construction-supervision-for-new-social-pedagogical-centre-20362/) — Salzburg, Austria · Service contract · deadline 2026-12-21 (22 days left to apply)
- [Motorway construction supervision: A1 West Autobahn upgrades in Lower Austria](https://pelenoir.com/en/tenders-of-europe/projects/motorway-construction-supervision-a1-west-autobahn-upgrades-in-lower-19706/) — Austria · Service contract · deadline 2027-01-14 (46 days left to apply)
- [Liechtensteinstraße 101 Construction Management Phase Two](https://pelenoir.com/en/tenders-of-europe/projects/liechtensteinstrasse-101-construction-management-phase-two-18831/) — Vienna, Austria · Service contract · deadline 2026-12-14 (15 days left to apply)
- [Wolfsbergtunnel refurbishment local construction supervision](https://pelenoir.com/en/tenders-of-europe/projects/wolfsbergtunnel-refurbishment-local-construction-supervision-15356/) — Austria · Service contract · deadline 2026-11-25 (closed 4 days ago)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-3d29836d-681f-4f2a-9af6-9c759e55ca87  
Original title: 4921 A01 GEN Kn.Linz-Kn.Haid + 0005 A01 ASt Traun/Haid - Örtliche Bauaufsicht EM

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/a01-linz-haid-motorway-em-supervision-16791/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
